Line Number | Item | Description | Unit | Quantity |
| 0001 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | CUYD | 200 |
| 0002 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 18 |
| 0003 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | SQYD | 21,528 |
| 0004 | 303-02-00100 | Removal of Existing Patches | SQYD | 65 |
| 0005 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | SQYD | 1,806 |
| 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 1,350 |
| 0007 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | CUYD | 75 |
| 0008 | 502-01-00100 | Superpave Asphaltic Concrete | TON | 2,223.3 |
| 0009 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | TON | 64.3 |
| 0010 | 509-01-00100 | Cold Planing Asphaltic Pavement | SQYD | 187 |
| 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | CUYD | -21 |
| 0012 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | SQYD | 44 |
| 0013 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | LNFT | 472 |
| 0014 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0015 | 722-02-00100 | Project Site Laboratory (Equipped) | EACH | 1 |
| 0016 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0017 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 306 |
| 0018 | 735-01-00100 | Mailboxes | EACH | 1 |
| 0019 | 735-02-00100 | Mailbox Supports (Single) | EACH | 1 |
| 0020 | 737-01-00100 | Painted Traffic Striping (Solid Line) (4" Width) | MILE | 1.333 |
| 0021 | 737-02-00100 | Painted Traffic Striping (Broken Line) (4" Width) | MILE | 0.966 |
| 0022 | 740-01-00100 | Construction Layout | LUMP | 1 |