| 0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | SQYD | 216 |
| 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) (18" CMP) | LNFT | 60 |
| 0004 | 202-02-32120 | Removal of Pipe (Side Drain) (18" CMP) | LNFT | 48 |
| 0005 | 202-02-32180 | Removal of Pipe Headwalls | EACH | 1 |
| 0006 | 202-02-38240 | Removal of Signs and Supports | EACH | 6 |
| 0007 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | CUYD | 140 |
| 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 15 |
| 0009 | 204-06-00100 | Temporary Silt Fencing | LNFT | 342 |
| 0010 | 303-01-00200 | In-Place Cement Stabilized Base Course (8 1/2" Thick) | SQYD | 4,037 |
| 0011 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | CUYD | 100 |
| 0012 | 701-01-01000 | Cross Drain Pipe (24" RCP/PP) | LNFT | 64 |
| 0013 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | LNFT | 48 |
| 0014 | 702-04-00100 | Adjusting Manholes | EACH | 2 |
| 0015 | 706-02-00200 | Concrete Drive (6" Thick) | SQYD | 45 |
| 0016 | 712-02-00100 | Sacked Concrete Revetment | SQYD | 160 |
| 0017 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0018 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 0.344 |
| 0019 | 726-01-00100 | Bedding Material | CUYD | 17 |
| 0020 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0021 | 729-01-00102 | Sign (Type A)(Furnish and Install) | SQFT | 29.6 |
| 0022 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 8 |
| 0023 | 729-21-00100 | U-Channel Post | EACH | 6 |
| 0024 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 270 |
| 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers (Hydrant)(Blue) | EACH | 4 |
| 0026 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | LNFT | 390 |
| 0027 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 40 |
| 0028 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 1.376 |
| 0029 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | EACH | 1 |
| 0030 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | EACH | 1 |
| 0031 | 735-01-00100 | Mailboxes | EACH | 8 |
| 0032 | 735-02-00100 | Mailbox Supports (Single) | EACH | 6 |
| 0033 | 735-04-00100 | Mailbox Supports (Multiple) | EACH | 1 |
| 0034 | 739-01-00100 | Hydro-Seeding | ACRE | 0.6 |
| 0035 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0036 | NS-200-00020 | Cleaning Existing Ditches | LNFT | 342 |
| 0037 | NS-502-01000 | Asphalt Concrete | TON | 837.1 |
| 0038 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 121.3 |
| 0039 | NS-507-01100 | Asphalt Material (CRS-2P Emulsion) | GAL | 2,745 |
| 0040 | NS-507-02200 | Aggregate (S2) | SQYD | 4,036 |
| 0041 | NS-507-02300 | Aggregate (S3) | SQYD | 4,036 |
| 0042 | NS-509-01000 | Milling Asphalt Pavement | SQYD | 4,437 |
| 0043 | NS-510-01400 | Pavement Patching (12" Minimum Thickness) | SQYD | 285 |
| 0044 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | INLF | 1,860 |