Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-02020 | Removal of Asphalt Pavement | SQYD | 52 |
| 0002 | 202-02-06060 | Removal of Concrete Catch Basin | EACH | 1 |
| 0003 | 202-02-06120 | Removal of Curbs (Asphalt) | LNFT | 20 |
| 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 30" CMP | LNFT | 150 |
| 0005 | 203-03-00100 | Embankment | CUYD | 195 |
| 0006 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | SQYD | 52 |
| 0007 | 701-01-01021 | Cross Drain Pipe (30" RCP) | LNFT | 150 |
| 0008 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | LNFT | 150 |
| 0009 | 702-03-00100 | Catch Basins (CB-01) | EACH | 1 |
| 0010 | 707-04-00100 | Asphalt Curb | LNFT | 20 |
| 0011 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0012 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 0.008 |
| 0013 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 0.912 |
| 0014 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | EACH | 11 |
| 0015 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | EACH | 33 |
| 0016 | 717-01-00100 | Seeding | LB | 2 |
| 0017 | 718-01-00100 | Fertilizer | LB | 16 |
| 0018 | 726-01-00100 | Bedding Material | CUYD | 35 |
| 0019 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0020 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 2 |
| 0021 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.016 |
| 0022 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.008 |
| 0023 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0024 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | INLF | 1,512 |