Line Number | Item | Description | Unit | Quantity |
| 0001 | 502-01-00100 | Asphalt Concrete | TON | 66 |
| 0002 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | SQYD | 600 |
| 0003 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0004 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 0.17 |
| 0005 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 0.17 |
| 0006 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 0.17 |
| 0007 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0008 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 14 |
| 0009 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.085 |
| 0010 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.085 |
| 0011 | 740-01-00100 | Construction Layout | LUMP | 1 |