Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-06060 | Removal of Concrete Catch Basin | EACH | 1 |
| 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) 66" CMPA | LNFT | 202 |
| 0003 | 202-02-32140 | Removal of Pipe (Storm Drain) 15" CMP | LNFT | 20 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 30 |
| 0005 | 301-02-00200 | Class I Base Course (6" Thick) | SQYD | 176 |
| 0006 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | SQYD | 100 |
| 0007 | 602-16-00100 | High Early Strength (HES) Concrete Pavement Full and Partial Depth Patching | SQYD | 176 |
| 0008 | 701-01-01140 | Cross Drain Pipe (72" RCP) | LNFT | 208 |
| 0009 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | LNFT | 208 |
| 0010 | 702-03-00200 | Catch Basins (CB-02) | EACH | 1 |
| 0011 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0012 | 713-11-00100 | Portable Changeable Message Signs | EACH | 2 |
| 0013 | 717-01-00100 | Seeding | LB | 2 |
| 0014 | 718-01-00100 | Fertilizer | LB | 37 |
| 0015 | 726-01-00100 | Bedding Material | CUYD | 78.6 |
| 0016 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0017 | 729-16-00200 | Object Marker Assembly (Type 2) | EACH | 2 |
| 0018 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 12 |
| 0019 | 740-01-00100 | Construction Layout | LUMP | 1 |