Search


Letting of 6/10/2020 LA DOTD Headquarters

Download Proposal List Download Proposals with Items

Click the proposal links below to view item details.

Proposal: H.000133.6 US 80 OVERPASS @ KCS RR
DBE Goal: 12%
OJT Goal: 3 Trainees
Specbook: 2016

Description of work: clearing and grubbing, removal of bridge, grading, drainage structures, milling asphalt concrete, pavement patching, class ii base course, lime treatment, asphalt concrete overlay, concrete slab span and precast-prestressed concrete girder spans bridge, drilled shaft foundations, and related work.
Parish(es): Lincoln
Route(s): US 80
Federal Number: H000133
Estimated Construction Cost: $5,000,000 to $7,500,000


Proposal: H.000470.6 HOLDEN SIDEWALK PROGRAM
Local Public Agency project
SBE Goal: 8%
Specbook: 2016

Description of work: clearing and grubbing, grading, drainage structures, sidewalks, signing, and related work.
Parish(es): Livingston
Route(s): LA 441
Federal Number: H000470
Estimated Construction Cost: $250,000 to $500,000


Proposal: H.002075.6 LA383: I-10 INTCHG-0.408 MI N I-10
DBE Goal: 12%
Specbook: 2016

Description of work: grading, drainage structures, miling asphalt concrete, asphalt concrete pavement, portland cement concrete pavement, and related work.
Parish(es): Calcasieu
Route(s): LA 383
Federal Number: H002075
Estimated Construction Cost: $1,000,000 to $2,500,000


Proposal: H.002765.6 LA 86: LA 347 - LA 31
DBE Goal: 7%
Specbook: 2016

Description of work: clearing and grubbing, grading, drainage structures, milling asphalt concrete, pavement patching, subgrade treatment, in-place cement treated base course, in-place cement stabilized base course, asphalt surface treatment, asphalt concrete overlay, traffic signalization, and related work.
Parish(es): Iberia
Route(s): LA 86
Federal Number: H002765
Estimated Construction Cost: $1,000,000 to $2,500,000


Proposal: H.006339.6 SECTION LINE ROAD BRIDGE
DBE Goal: 5%
OJT Goal: 2 Trainees
Specbook: 2016

Description of work: clearing and grubbing, removal of bridge, grading, drainage structures, class ii base course, asphalt concrete pavement, precast concrete piles, concrete curved slab span bridge, and related work..
Parish(es): Vernon
Federal Number: H006339
Estimated Construction Cost: $1,000,000 to $2,500,000


Proposal: H.007520.6 THE LAFITTE CORRIDOR GREENWAY
Local Public Agency project
SBE Goal: 5%
Specbook: 2016

Description of work: clearing and grubbing, removal of pedestrian bridge, grading drainage structures, asphalt concrete pavement, portland cement concrete pavement, pedestrian bridge, and related work.
Parish(es): Orleans
Federal Number: H007520
Estimated Construction Cost: $250,000 to $500,000


Proposal: H.008332.6 LA 360: ROUGE BAYOU BRIDGE REPLACEMENT
DBE Goal: 6%
OJT Goal: 2 Trainees
Specbook: 2016

Description of work: clearing and grubbing, removal of bridge, grading, drainage structures, pavement patching, class ii base course, lime treatment, asphalt concrete pavement, precast concrete piles, steel piles, precast prestressed concrete girder span bridge, and related work.
Parish(es): St. Landry
Route(s): LA 360
Federal Number: H008332
Estimated Construction Cost: $2,500,000 to $5,000,000


Proposal: H.009199.6 I-10: I-110 TO ACADIAN TRWY PAVE MARKINGS
Specbook: 2016

Description of work: reflectorized raised pavement markers, plastic pavement striping, and related work.
Parish(es): East Baton Rouge
Route(s): I-10
Federal Number: H009199
Estimated Construction Cost: $100,000 to $250,000


Proposal: H.009804.6 KENNER: S WILLIAMS BLVD STREETSCAPING

H.009804 has been postponed to the letting of June 24, 2020


Proposal: H.010989.6 I-20: LINCOLN/OUACHITA P. RAMP REHAB
DBE Goal: 7%
OJT Goal: 3 Trainees
Specbook: 2016

Description of work: pavement patching, and related work.
Parish(es): Lincoln; Ouachita
Route(s): I-20
Federal Number: H010989
Estimated Construction Cost: $5,000,000 to $7,500,000


Proposal: H.011533.6 NORTH BAYOU BLACK DRIVE / HANSON CANAL
DBE Goal: 4%
Specbook: 2016

Description of work: removal of treated timber trestle bridge, milling asphalt concrete, asphalt pavement widening, asphalt concrete overlay, precast concrete piles, concrete slab span bridge, and related work.
Parish(es): Terrebonne
Federal Number: H011533
Estimated Construction Cost: $500,000 to $1,000,000


Proposal: H.011545.6 LITTLE CHENIER RD / LITTLE CHENIER BAYOU
DBE Goal: 6%
Specbook: 2016

Description of work: clearing and grubbing, removal of bridge, grading, milling asphalt pavement, pavement widening, asphalt concrete pavement, precast concrete piles, concrete slab span bridge, and related work.
Parish(es): Cameron
Federal Number: H011545
Estimated Construction Cost: $500,000 to $1,000,000


Proposal: H.011823.6 N.O. CITY PARK: HARRISON AVENUE TRAILHEAD
Local Public Agency project
SBE Goal: 10%
Specbook: 2016

Description of work: grading, class ii base course, concrete walks, landscaping and related work. .
Parish(es): Orleans
Federal Number: H011823
Estimated Construction Cost: $100,000 to $250,000


Proposal: H.011938.6 I-49: 2 MILES N LA 3265 TO 4 MILES N LA 1
DBE Goal: 9%
OJT Goal: 2 Trainees
Specbook: 2016

Description of work: signs, mounting and related work.
Parish(es): Rapides
Route(s): I-49
Federal Number: H011938
Estimated Construction Cost: $1,000,000 to $2,500,000


Proposal: H.012018.6 ADAPTIVE TRAFFIC SIGNAL DESIGN AND IMPLEMENTATION
DBE Goal: 4%
OJT Goal: 5 Trainees
Specbook: 2016

Description of work: traffic signalization and related work.
Parish(es): Lafayette
Federal Number: H012018
Estimated Construction Cost: $5,000,000 to $7,500,000


Proposal: H.012076.6 LA 415: IMPROVEMENTS AT PLANTATION AVE
SBE Goal: 6%
Specbook: 2016

Description of work: grading, lime treatment, asphalt concrete pavement, portland cement concrete pavement and related work.
Parish(es): West Baton Rouge
Route(s): LA 415
Federal Number: H012076
Estimated Construction Cost: $100,000 to $250,000


Proposal: H.012144.6 LA 478: VOWELLS MILL TO LA 117
Specbook: 2016

Description of work: milling asphalt concrete, drainage structures, lime treatment, in-place cement treated base course, in-place cement treated subgrade, asphalt concrete overlay, and related work.
Parish(es): Natchitoches
Route(s): LA 478
Federal Number: H012144
Estimated Construction Cost: $2,500,000 to $5,000,000


Proposal: H.013097.6 LA 93: 1.53 MI S US 90 - US 90
DBE Goal: 14%
OJT Goal: 2 Trainees
Specbook: 2016

Description of work: grading, drainage structures, milling asphalt concrete, pavement patching, class ii base course, in-place cement stabilized base course, asphalt surface treatment, asphalt concrete pavement, and related work.
Parish(es): Lafayette
Route(s): LA 93
Federal Number: H013097
Estimated Construction Cost: $1,000,000 to $2,500,000


Proposal: H.013191.6 LA 1: LA 75 - PORT ALLEN CANAL BR
DBE Goal: 12%
OJT Goal: 5 Trainees
Specbook: 2016

Description of work: grading, drainage structures, milling asphalt concrete, pavement patching, class ii base course (asphalt concrete), asphalt concrete overlay, and related work.
Parish(es): Iberville; West Baton Rouge
Route(s): LA 1
Federal Number: H013191
Estimated Construction Cost: $7,500,000 to $10,000,000


Proposal: H.013209.6 US 61: WILLIAMS BLVD - RR OVERPASS
DBE Goal: 13%
OJT Goal: 2 Trainees
Specbook: 2016

Description of work: milling asphalt concrete, asphalt concrete overlay, pavement patching, concrete bridge railing repair and rehabilation, and related work.
Parish(es): Jefferson
Route(s): US 61
Federal Number: H013209
Estimated Construction Cost: $1,000,000 to $2,500,000


Proposal: H.013236.6 LA 17: WINNSBORO - LA 577
DBE Goal: 4%
Specbook: 2016

Description of work: milling asphalt concrete, pavement patching, asphalt surface treatment, asphalt concrete overlay, and related work.
Parish(es): Franklin
Route(s): LA 17
Federal Number: H013236
Estimated Construction Cost: $1,000,000 to $2,500,000


Proposal: H.013731.6 US 61: FLORIDA BLVD. - GREENWELL ST.
DBE Goal: 14%
OJT Goal: 5 Trainees
Specbook: 2016

Description of work: milling asphalt concrete, pavement patching, asphalt concrete overlay, culvert rehabilitation, and related work.
Parish(es): East Baton Rouge
Route(s): US 61
Federal Number: H013731
Estimated Construction Cost: $5,000,000 to $7,500,000


Proposal: H.013760.6 LA 4 INTERSECTION IMPROVEMENTS
DBE Goal: 4%
Specbook: 2016

Description of work: clearing and grubbing, grading, class ii base course, asphalt concrete pavement, and related work.
Parish(es): Franklin
Route(s): LA 128; LA 562
Federal Number: H013760
Estimated Construction Cost: $500,000 to $1,000,000


Proposal: H.013786.6 LA 1247: LA 1 - LA 1010
Specbook: 2016

Description of work: grading, drainage structures, milling asphalt concrete, pavement patching, asphalt concrete overlay, asphalt concrete pavement, and related work.
Parish(es): Assumption
Route(s): LA 1247
Estimated Construction Cost: $500,000 to $1,000,000


Proposal: H.013830.6 EBR SIGNAL DETECTION UPGRADE
DBE Goal: 8%
Specbook: 2016

Description of work: traffic signalization and related work.
Parish(es): East Baton Rouge
Route(s): I-110; LA 42; LA 67; US 61; US 61-X
Federal Number: H013830
Estimated Construction Cost: $1,000,000 to $2,500,000


Proposal: H.013891.6 I-10: IBERVILLE PL TO LA 415 (RPMS)
SBE Goal: 3%
Specbook: 2016

Description of work: reflectorized raised pavement markers, and related work.
Parish(es): Iberville; West Baton Rouge
Route(s): I-10
Federal Number: H013891
Estimated Construction Cost: $250,000 to $500,000