I-10, LA 641, US 61 and US 51, Ascension, St. James and St. John Parishes
Wednesday, November 25, 2015 at 8:35:18 AM
Ascension Parish
Southbound US 61 before I-10, Right lane closure Monday, November 30 to December 3. From 8 am to 4 pm for sign installation.
St. James Parish
Northbound LA 641 Right lane closure Monday, November 30 to December 3. From 8 am to 4 pm for sign installation.
Northbound US 61 before LA 641 Right lane closure Monday, November 30 to December 3. From 8 am to 4 pm for sign installation.
St. John Parish
US 61 both south and north bound before US 51, Right lane closure Monday, November 30 to December 3. From 8 am to 4 pm for sign installation.
US 51 both south and north bound before I-10, Right lane closure Monday, November 30 to December 3. From 8 am to 4 pm for sign installation.
DOTD appreciates your patience and reminds you to please drive with caution through the construction/maintenance site and be on the lookout for work crews and their equipment.
Michael Duplantis, P.E. LADOTD Construction Gang 242 / District 02 166 W. 3rd St. Kenner, LA 70063 Phone: (504) 465-3473 Fax: (504) 437-3157 Email: [email protected]
|