DOTD announces project to replace striping on I-49 in Shreveport
Thursday, November 5, 2026 at 9:52:59 AM
DOTD announces project to replace striping on I-49 in Shreveport SHREVEPORT, La. – Motorists will soon notice much improved visibility on a portion of I-49 through the Shreveport area, as a $807,177 project to replace the pavement striping and markings is preparing to kick off.
DOTD advises motorists that beginning on Sunday, November 15, 2026, construction will begin on the project, which stretches on I-49 from near the Southern Loop interchange to I-20 in Shreveport (including both directions of travel).
Work includes removing any old pavement striping and reflectorized markings, and replacing with all new material, including the on and off ramps at each interchange.
This will require slow-moving operations and intermittent lane closures at nighttime only, primarily from 7:00 p.m. to 6:00 a.m., Sunday – Thursday nights.
Pavement markings and striping provide critical visual guidance to drivers, helping to maintain safe and orderly traffic flow without requiring motorists to look away from the road. These markings indicate to drivers which part of the road to use, provide information about conditions ahead, and illustrate where passing is allowed, among other uses.
The entire project is anticipated to be complete in early 2027, weather and other factors permitting.
Safety reminder:
DOTD appreciates your patience and reminds you to please drive with caution through the construction site and be on the lookout for work crews and their equipment. Remember to leave plenty of room between you and the vehicle in front of you.
Area residents should exercise caution when driving, walking, or biking near an active construction zone.
Additional information:
Call 511, visit www.511la.org, or download the Louisiana 511 mobile app for additional travel information. Out-of-state travelers may call 1-888-ROAD-511 (1-888-762-3511). Motorists may also monitor the LA DOTD website at www.dotd.la.gov, by selecting MyDOTD, or by visiting the DOTD Facebook and X (Twitter) pages.
To track updates and developments related to the T4LA initiative aimed at enhancing the manner in which DOTD serves the state’s citizens, visit www.T4la.com.
Contact Information:
Erin Buchanan DOTD Public Information Officer Shreveport-Bossier District (318) 549-8402 [email protected]
*image attached: map of project limits

|