Search


DOTD Announcements
Lane Closure US 80(East Georgia Ave.)/Lincoln Parish H.011804
Monday, March 23, 2026 at 12:14:53 PM
Beginning Monday, April 6, 2026 the right lane of eastbound US80(East Georgia Ave) from northbound US 167 to Bonner St will be closed. This closure is required for construction associated with the Ruston Downtown Revitalization Ph IX project(SP H.011804.6) that will begin the same day.

This project is funded by the Federal Highway Administration(FHWA) and City of Ruston and the contract is administered by the City of Ruston and their consultant engineer, Hunt, Guillot & Associates in Ruston, LA. This project will consist of rebuilding ADA sidewalks/curbs with curb extensions, landscaping, decorative street lights, benches, trash receptacles, pavement patching, base course, and asphalt pavement for a three block stretch of Bonner Street from East Park Avenue to US 80.

Additional information pertaining to City of Ruston street closures will be published by the City of Ruston.

Safety reminder:
The City of Ruston appreciates your patience and reminds you to please drive with caution through the construction site and be on the lookout for work crews and their equipment.
Area residents should exercise caution when driving, walking or biking near and active construction zone.

Contact Information:
John Freeman
City of Ruston
Public Works Director
[email protected]
c: 318-245-2398
o: 318-242-7703
701 E. Tennessee Ave.
P.O.Box 2069
Ruston, LA 71270