DOTD announces project to replace the LA 528 bridge over Clarke Bayou in Bossier Parish
Monday, November 24, 2025 at 10:21:15 AM
DOTD announces project to replace the LA 528 bridge over Clarke Bayou in Bossier Parish BOSSIER PARISH – The Louisiana Department of Transportation and Development announces the start of a project to replace the LA 528 bridge over Clarke Bayou in eastern Bossier Parish.
The $2.6 million project is scheduled to begin on Monday, December 1, 2025 with the closure and removal of the existing structure, which was built in 1976.
Other work includes clearing & grubbing to remove vegetation in the work area, grading, drainage structures, milling asphalt concrete, pavement repairs, roadway base repairs, and related work.
This bridge is located approximately 2.2 miles east of LA 157.
This closure is anticipated to last approximately 10 months, with progress dependent on weather conditions and other factors that may impact construction timelines.
Restrictions/Permits: Total road closure at the specified location. All vehicles will be required to utilize an alternate route.
Alternate route: Detour signage will be posted.
Safety reminder:
DOTD appreciates your patience and reminds you to please drive with caution through the construction site and be on the lookout for work crews and their equipment. Remember to leave plenty of room between you and the vehicle in front of you.
Area residents should exercise caution when driving, walking, or biking near an active construction zone.
Additional information:
Call 511, visit www.511la.org, or download the Louisiana 511 mobile app for additional travel information. Out-of-state travelers may call 1-888-ROAD-511 (1-888-762-3511). Motorists may also monitor the LA DOTD website at www.dotd.la.gov, by selecting MyDOTD, or by visiting the DOTD Facebook and X (Twitter) pages.
Contact Information:
Erin Buchanan Public Information Officer Shreveport-Bossier District (318) 549-8402 [email protected]
|