LA 22 Eastbound and Westbound [Tchefuncte River Bridge], St. Tammany Parish -- Roadwork (Bridge Inspection)
Wednesday, August 13, 2025 at 2:23:41 PM
- Route Name: LA 22 Eastbound,LA 22 Westbound
Start Date: Wednesday, August 20, 2025 at 9:00 AM End Date: Wednesday, August 20, 2025 at 3:00 PM (Weather Permitting) Closure Type: Roadwork Lanes Affected: Partial Closure/ Both Left and Right Lanes Special Notes: This is an Alternating lane closure. Start Cross Street: LA 1077/LA 21 End Cross Street: MARINA DEL RAY DR Restrictions: Bridge will be reduced to one 12-ft lane. No wide loads allowed during this time.
Open Interactive Map
Comments This single lane closure with alternating one-lane traffic of the Tchefuncte River Bridge on LA 22 is for crews to perform a routine inspection of the bridge. The bridge may need to be operated (swung open and closed) as part of the inspection. This bridge inspection is part of normal processes required to insure the continued safe operation of the region's transportation facilities. Safety Reminder DOTD appreciates your patience and reminds you to please drive with caution through the work zone and be on the lookout for work crews and their equipment.
|