BDTM.102 - Use of Round Guard Rail Posts
Friday, April 09, 2021 at 3:06:48 PM
To all:
Please be advised that the following Bridge Design Technical Memorandum (BDTM) has been approved by the Bridge Design Engineer Administrator and published on the DOTD Bridge Design Section website for implementation at:
http://wwwsp.dotd.la.gov/Inside_LaDOTD/Divisions/Engineering/Bridge_Design/Pages/Technical-Memoranda.aspx
The BDTM index has been updated and posted as well.
BDTM.102 – Use of Round Guard Rail Posts
Summary:
This BDTM allows round timber posts to be substituted for rectangular timber posts and W6x9 steel posts and provides the requirements when making these substitutions.
This email notification and BDTM are distributed to all DOTD in-house and consultant bridge designers.
This email notification is copied to those copied on the BDTM, and to Consultant Contracts Services staff in order to distribute the e-mail and BDTM to consultant firms on the DOTD solicitation list. If you are listed as the Principle-In-Charge for a consultant firm, please inform your design staff of this BDTM. Thank you.
Thanks,
Kelly M. Kemp, P.E.
Bridge and Structural Design Section
LA Dept. of Transportation and Development
Office: (225) 379-1809
Quick Dial (Internal): 3-1809