Bridge Design Technical Memorandum No. 88 - New Bridge Railing Due to Bridge Widening
Monday, March 16, 2020 at 12:48:45 PM
Attention Consultant Community:
Please be advised that the following Bridge Design Technical Memorandum (BDTM) has been approved by the Bridge Design Engineer Administrator and published on the DOTD Bridge Design Section website (http://wwwsp.dotd.la.gov/Inside_LaDOTD/Divisions/Engineering/Bridge_Design/Pages/Technical-Memoranda.aspx) for implementation. The BDTM index has been updated and posted as well.
BDTM.88 – New Bridge Railing Due To Bridge Widening
This BDTM revises the policy for replacing bridge railings when a bridge widening project is involved, as specified in the Bridge Design and Evaluation Manual, Part I, Chapter 6, Section 6.3.
Adam Lancaster, P.E.
LA Dept. of Transportation & Development HQ
Section 25 - Bridge Design, 606D
(225) 379-1015
Please do not reply to this e-mail from MyDOTD. The originating e-mail account is not monitored by Consultant Contract Services (CCS). If you need assistance with the information in this email, please contact Adam Lancaster directly.