Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-14500 | Removal of Guard Rail | LNFT | 584 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 528 |
| 0003 | 203-10-00100 | Cleaning Existing Ditches | LNFT | 1,600 |
| 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 105 |
| 0005 | 204-06-00100 | Temporary Silt Fencing | LNFT | 25,662 |
| 0006 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | SQYD | 68,432 |
| 0007 | 303-02-00100 | Removal of Existing Patches | SQYD | 929 |
| 0008 | 304-01-00100 | Lime | TON | 970.02 |
| 0009 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | SQYD | 68,432 |
| 0010 | 309-01-12000 | In-Place Cement Treated Subgrade (12" Thick) | SQYD | 34,216 |
| 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 135 |
| 0012 | 502-01-00100 | Asphalt Concrete | TON | 41,186.5 |
| 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 414 |
| 0014 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 240,770 |
| 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -15,735 |
| 0016 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | SQYD | 122 |
| 0017 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | INLF | 1,320 |
| 0018 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 112.5 |
| 0019 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | LNFT | 50 |
| 0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 100 |
| 0021 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | EACH | 4 |
| 0022 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0023 | 713-02-00300 | Temporary Pavement Markings (8" Width) | LNFT | 7,730 |
| 0024 | 713-02-00500 | Temporary Pavement Markings (24" Width) | LNFT | 6,896 |
| 0025 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 21.95 |
| 0026 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 23.697 |
| 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 47.806 |
| 0028 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | EACH | 4 |
| 0029 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | EACH | 2 |
| 0030 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | EACH | 4 |
| 0031 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | EACH | 16 |
| 0032 | 713-05-00240 | Temporary Pavement Legends & Symbols (Arrow - Merge) | EACH | 28 |
| 0033 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | EACH | 2 |
| 0034 | 713-05-00600 | Temporary Pavement Legends & Symbols (U-Turn) | EACH | 28 |
| 0035 | 722-02-00100 | Project Site Laboratory (Equipped) | EACH | 1 |
| 0036 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | MILE | 18.464 |
| 0037 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0038 | 729-16-00200 | Object Marker Assembly (Type 2) | EACH | 36 |
| 0039 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 4 |
| 0040 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 2,914 |
| 0041 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | LNFT | 3,865 |
| 0042 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | LNFT | 3,448 |
| 0043 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 114 |
| 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 19.375 |
| 0045 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 8.545 |
| 0046 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | MILE | 0.121 |
| 0047 | 732-03-02012 | Plastic Pavement Striping (Dotted Line)(4" W)(3' L)(Thermo 90 mil) | MILE | 1.281 |
| 0048 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | MILE | 0.795 |
| 0049 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | MILE | 0.631 |
| 0050 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | EACH | 2 |
| 0051 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | EACH | 1 |
| 0052 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | EACH | 2 |
| 0053 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | EACH | 8 |
| 0054 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | EACH | 14 |
| 0055 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | EACH | 14 |
| 0056 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | EACH | 1 |
| 0057 | 732-05-00100 | Removal of Existing Markings | MILE | 0.027 |
| 0058 | 739-01-00100 | Hydro-Seeding | ACRE | 0.104 |
| 0059 | 740-01-00100 | Construction Layout | LUMP | 1 |