Bid Tabulations for the Letting of 7/14/2021 LA DOTD Headquarters

Proposal:H.013743.6
Parish:Natchitoches
Routes:LA 493
Description:LA 493: MONTROSE RD. TO LA 1
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, LIME TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, IN-PLACE CEMENT TREATED SUBGRADE, ASHPALT SURFACE TREATMENT, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$2,522,431.54
108584Madden Contracting Co., LLC$2,197,292.70
212487Diamond B Construction Co., L.L.C.$2,216,371.89
312312GILCHRIST CONSTRUCTION COMPANY, LLC$2,442,121.16


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Madden Contracting Co., LLC
- 2 -
Diamond B Construction Co., L.L.C.
- 3 -
GILCHRIST CONSTRUCTION COMPANY, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-02-32100Removal of Pipe (Cross Drain) 18" RCP100     LNFT15.001,500.0011.001,100.005.00500.00
0002202-02-32100Removal of Pipe (Cross Drain) 24" RCP4     LNFT15.0060.00300.001,200.005.0020.00
0003203-07-00100Borrow (Vehicular Measurement) 1,701     CUYD20.0034,020.0010.0017,010.0023.0039,123.00
0004303-01-00200In-Place Cement Stabilized Base Course (8-1/2" Thick) 40,879     SQYD7.40302,504.607.35300,460.658.00327,032.00
0005304-01-00100Lime 386.3   TON260.00100,438.00250.0096,575.00265.00102,369.50
0006304-03-00400Lime Treatment (Type C) (12" Thick) 40,879     SQYD3.00122,637.002.2089,933.803.15128,768.85
0007309-01-12000In-Place Cement Treated Subgrade (12" Thick) 40,879     SQYD7.30298,416.707.95324,988.057.50306,592.50
0008401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 1,142     CUYD24.0027,408.0042.0047,964.0050.0057,100.00
0009402-01-00100Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 8.9   CUYD85.00756.50110.00979.00120.001,068.00
0010502-01-00100Asphalt Concrete 7,625.4   TON90.00686,286.0082.00625,282.8097.00739,663.80
0011502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 469.1   TON50.0023,455.0088.0041,280.8097.0045,502.70
0012507-01-00100Asphalt Material (CRS-2P Emulsion) 27,638     GAL2.5069,095.002.8578,768.303.0082,914.00
0013507-02-00200Aggregate (S2) 40,644     SQYD1.8976,817.161.7571,127.001.5562,998.20
0014507-02-00300Aggregate (S3) 40,644     SQYD1.6868,281.921.4558,933.801.3554,869.40
0015509-01-00100Milling Asphalt Pavement 35,680     SQYD2.5089,200.003.25115,960.003.00107,040.00
0016509-02-00100Contractor Retained Reclaimed Asphalt Pavement -3,111     CUYD0.01-31.111.00-3,111.001.00-3,111.00
0017701-02-01000Cross Drain Pipe Arch (24" Equiv. RCPA) 104     LNFT185.0019,240.00315.0032,760.00225.0023,400.00
0018701-08-00100Relaying Pipe 30" RCP12     LNFT150.001,800.00340.004,080.00160.001,920.00
0019701-15-00100Concrete Collar 2     EACH745.001,490.002,200.004,400.001,200.002,400.00
0020713-01-00100Temporary Signs and Barricades 1     LUMP89,500.0089,500.0022,000.0022,000.0026,000.0026,000.00
0021713-02-00500Temporary Pavement Markings (24" Width) 48     LNFT1.0048.001.0048.002.0096.00
0022713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 9.052 MILE350.003,168.20154.001,394.01250.002,263.00
0023713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 6.159 MILE1.006.16850.005,235.151.006.16
0024713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 33.354 MILE1.0033.351,075.0035,855.551.0033.35
0025713-05-00400Temporary Pavement Legends & Symbols (RR Crossing) 8     EACH1.008.0052.00416.001.008.00
0026713-06-00200Temporary Reflectorized Raised Pavement Markers (Tabs) 797     EACH2.001,594.002.001,594.003.002,391.00
0027716-01-00100Mulch (Vegetative) 8.8   TON650.005,720.00655.005,764.00700.006,160.00
0028717-01-00100Seeding 132     LB15.001,980.0016.002,112.0016.002,112.00
0029718-01-00100Fertilizer 4,400     LB0.502,200.000.552,420.000.552,420.00
0030722-02-00100Project Site Laboratory (Equipped) 1     EACH3,000.003,000.004,500.004,500.003,500.003,500.00
0031726-01-00100Bedding Material 25.8   CUYD102.002,631.6096.002,476.80100.002,580.00
0032727-01-00100Mobilization 1     LUMP89,500.0089,500.00151,250.00151,250.00240,000.00240,000.00
0033729-16-00200Object Marker Assembly (Type 2) 7     EACH75.00525.00155.001,085.00110.00770.00
0034731-02-00100Reflectorized Raised Pavement Markers 588     EACH9.005,292.009.005,292.0010.005,880.00
0035732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 12     LNFT20.00240.0021.00252.0021.00252.00
0036732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 9.847 MILE3,960.0038,994.124,025.0039,634.184,100.0040,372.70
0037732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 1.54  MILE1,375.002,117.501,400.002,156.001,400.002,156.00
0038732-04-18000Plastic Pavement Legends and Symbols (RR Crossing) 2     EACH1,100.002,200.001,100.002,200.001,200.002,400.00
0039735-01-00100Mailboxes 35     EACH5.00175.001.0035.001.0035.00
0040735-02-00100Mailbox Supports (Single) 31     EACH145.004,495.00180.005,580.00165.005,115.00
0041735-03-00100Mailbox Supports (Double) 2     EACH245.00490.00190.00380.00200.00400.00
0042740-01-00100Construction Layout 1     LUMP20,000.0020,000.0015,000.0015,000.0017,000.0017,000.00
           
  CONTRACTOR TOTAL   2,197,292.70 2,216,371.89 2,442,121.16