Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - La Contracting Enterprise LLC | - 2 - Barriere Construction Co., LLC | - 3 - Forby Contracting, Inc. |
Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount |
0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 164 | SQYD | 12.00 | 1,968.00 | 28.00 | 4,592.00 | 10.00 | 1,640.00 |
0002 | 202-02-06140 | Removal of Curbs (Concrete) | 318 | LNFT | 9.00 | 2,862.00 | 28.00 | 8,904.00 | 8.10 | 2,575.80 |
0003 | 202-02-14500 | Removal of Guard Rail | 232 | LNFT | 17.00 | 3,944.00 | 18.00 | 4,176.00 | 10.25 | 2,378.00 |
0004 | 202-02-38300 | Removal of Sign and U-Channel Post | 5 | EACH | 11.00 | 55.00 | 12.00 | 60.00 | 25.00 | 125.00 |
0005 | 203-01-00100 | General Excavation | 120 | CUYD | 35.00 | 4,200.00 | 28.00 | 3,360.00 | 30.00 | 3,600.00 |
0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 80 | CUYD | 55.00 | 4,400.00 | 100.00 | 8,000.00 | 45.00 | 3,600.00 |
0007 | 204-06-00100 | Temporary Silt Fencing | 350 | LNFT | 6.00 | 2,100.00 | 1.20 | 420.00 | 2.00 | 700.00 |
0008 | 502-01-00100 | Asphalt Concrete | 1,922 | TON | 127.00 | 244,094.00 | 93.50 | 179,707.00 | 106.00 | 203,732.00 |
0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 481.5 | TON | 218.00 | 104,967.00 | 175.00 | 84,262.50 | 180.00 | 86,670.00 |
0010 | 509-01-00100 | Milling Asphalt Pavement | 17,685 | SQYD | 3.50 | 61,897.50 | 3.25 | 57,476.25 | 3.00 | 53,055.00 |
0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -737 | CUYD | 0.01 | -7.37 | 0.01 | -7.37 | 0.01 | -7.37 |
0012 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 163 | SQYD | 155.00 | 25,265.00 | 125.00 | 20,375.00 | 130.00 | 21,190.00 |
0013 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 11,220 | LNFT | 1.00 | 11,220.00 | 2.50 | 28,050.00 | 2.15 | 24,123.00 |
0014 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 17,952 | LNFT | 1.00 | 17,952.00 | 2.50 | 44,880.00 | 2.25 | 40,392.00 |
0015 | 602-03-00100 | Cleaning and Sealing Random cracks | 500 | LNFT | 2.20 | 1,100.00 | 3.50 | 1,750.00 | 3.95 | 1,975.00 |
0016 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 1,315 | SQYD | 171.00 | 224,865.00 | 195.00 | 256,425.00 | 210.00 | 276,150.00 |
0017 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 2,235 | SQYD | 159.00 | 355,365.00 | 180.00 | 402,300.00 | 190.00 | 424,650.00 |
0018 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 325 | SQYD | 154.00 | 50,050.00 | 175.00 | 56,875.00 | 170.00 | 55,250.00 |
0019 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 3 | EACH | 3,100.00 | 9,300.00 | 2,500.00 | 7,500.00 | 1,500.00 | 4,500.00 |
0020 | 702-04-00200 | Adjusting Catch Basins | 2 | EACH | 2,600.00 | 5,200.00 | 8,700.00 | 17,400.00 | 750.00 | 1,500.00 |
0021 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 237.5 | LNFT | 31.00 | 7,362.50 | 18.00 | 4,275.00 | 30.00 | 7,125.00 |
0022 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 130.00 | 6,500.00 | 125.00 | 6,250.00 | 107.00 | 5,350.00 |
0023 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 2 | EACH | 3,550.00 | 7,100.00 | 3,500.00 | 7,000.00 | 3,400.00 | 6,800.00 |
0024 | 706-01-00100 | Concrete Walk (4" Thick) | 16 | SQYD | 85.00 | 1,360.00 | 105.00 | 1,680.00 | 73.00 | 1,168.00 |
0025 | 706-04-00100 | Handicapped Curb Ramps TYPE 3 | 2 | EACH | 1,700.00 | 3,400.00 | 3,600.00 | 7,200.00 | 1,650.00 | 3,300.00 |
0026 | 706-04-00100 | Handicapped Curb Ramps TYPE 4 | 16 | EACH | 1,700.00 | 27,200.00 | 3,800.00 | 60,800.00 | 1,550.00 | 24,800.00 |
0027 | 706-04-00100 | Handicapped Curb Ramps TYPE 7 | 7 | EACH | 1,500.00 | 10,500.00 | 2,750.00 | 19,250.00 | 1,550.00 | 10,850.00 |
0028 | 707-01-00100 | Concrete Curb | 210 | LNFT | 20.00 | 4,200.00 | 45.00 | 9,450.00 | 17.50 | 3,675.00 |
0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 135,000.00 | 135,000.00 | 145,000.00 | 145,000.00 | 60,000.00 | 60,000.00 |
0030 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,218 | LNFT | 1.00 | 1,218.00 | 2.25 | 2,740.50 | 5.00 | 6,090.00 |
0031 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 6.042 | MILE | 1.00 | 6.04 | 225.00 | 1,359.45 | 650.00 | 3,927.30 |
0032 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.917 | MILE | 1.00 | 3.92 | 500.00 | 1,958.50 | 650.00 | 2,546.05 |
0033 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 7.8 | MILE | 1.00 | 7.80 | 715.00 | 5,577.00 | 1,750.00 | 13,650.00 |
0034 | 713-05-00500 | Temporary Pavement Legends & Symbols (SCHOOL CROSSING) | 4 | EACH | 1.00 | 4.00 | 1.00 | 4.00 | 200.00 | 800.00 |
0035 | 717-01-00100 | Seeding | 50 | LB | 26.00 | 1,300.00 | 8.75 | 437.50 | 20.00 | 1,000.00 |
0036 | 718-01-00100 | Fertilizer | 1,650 | LB | 1.00 | 1,650.00 | 0.65 | 1,072.50 | 1.00 | 1,650.00 |
0037 | 727-01-00100 | Mobilization | 1 | LUMP | 160,000.00 | 160,000.00 | 100,000.00 | 100,000.00 | 115,000.00 | 115,000.00 |
0038 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 110.00 | 440.00 | 105.00 | 420.00 | 75.00 | 300.00 |
0039 | 729-19-00300 | Dead End Road Installations (Type C) | 1 | EACH | 2,125.00 | 2,125.00 | 2,100.00 | 2,100.00 | 900.00 | 900.00 |
0040 | 731-02-00100 | Reflectorized Raised Pavement Markers | 398 | EACH | 24.00 | 9,552.00 | 22.00 | 8,756.00 | 13.00 | 5,174.00 |
0041 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 471 | LNFT | 28.00 | 13,188.00 | 28.00 | 13,188.00 | 14.00 | 6,594.00 |
0042 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 138 | LNFT | 28.00 | 3,864.00 | 28.00 | 3,864.00 | 15.00 | 2,070.00 |
0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.017 | MILE | 6,400.00 | 38,508.80 | 6,100.00 | 36,703.70 | 6,000.00 | 36,102.00 |
0044 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.021 | MILE | 2,800.00 | 8,458.80 | 2,800.00 | 8,458.80 | 4,000.00 | 12,084.00 |
0045 | 732-04-19020 | Plastic Pavement Legends and Symbols (SCHOOL ZONE) | 2 | EACH | 1,125.00 | 2,250.00 | 110.00 | 220.00 | 2,000.00 | 4,000.00 |
0046 | 732-05-00100 | Removal of Existing Markings | 2.125 | MILE | 2,500.00 | 5,312.50 | 17,500.00 | 37,187.50 | 18,000.00 | 38,250.00 |
0047 | 735-01-00100 | Mailboxes | 79 | EACH | 36.00 | 2,844.00 | 1.25 | 98.75 | 20.00 | 1,580.00 |
0048 | 735-02-00100 | Mailbox Supports (Single) | 77 | EACH | 212.00 | 16,324.00 | 210.00 | 16,170.00 | 175.00 | 13,475.00 |
0049 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 615.00 | 615.00 | 600.00 | 600.00 | 345.00 | 345.00 |
0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 |
0051 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 9,000 | LNFT | 2.30 | 20,700.00 | 1.65 | 14,850.00 | 1.25 | 11,250.00 |
0052 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 9,500 | LNFT | 3.15 | 29,925.00 | 1.65 | 15,675.00 | 1.25 | 11,875.00 |
0053 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 18,500 | LNFT | 0.60 | 11,100.00 | 0.65 | 12,025.00 | 0.95 | 17,575.00 |
0054 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,200 | INLF | 0.75 | 900.00 | 0.75 | 900.00 | 95.00 | 114,000.00 |
0055 | NS-719-00002 | Tree Trimming | 1 | LUMP | 10,283.51 | 10,283.51 | 13,500.00 | 13,500.00 | 30,000.00 | 30,000.00 |
| | | | | | | | | | |
| | CONTRACTOR TOTAL | | | | 1,689,000.00 | | 1,755,276.58 | | 1,786,103.78 |