Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - JB Group of LA, LLC dba Infrastructure Solutions Group, LLC | - 2 - Diamond Electrical Co., Inc. | - 3 - Jack B. Harper Electrical LLC |
Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount |
0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 9,420.00 | 9,420.00 | 16,269.00 | 16,269.00 | 20,000.00 | 20,000.00 |
0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 497 | SQYD | 35.15 | 17,469.55 | 37.50 | 18,637.50 | 67.50 | 33,547.50 |
0003 | 202-02-06140 | Removal of Curbs (Concrete) | 216 | LNFT | 17.58 | 3,797.28 | 18.75 | 4,050.00 | 20.25 | 4,374.00 |
0004 | 202-02-38240 | Removal of Signs and Supports | 2 | EACH | 117.00 | 234.00 | 181.00 | 362.00 | 9,000.00 | 18,000.00 |
0005 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 9,420.00 | 9,420.00 | 23,485.00 | 23,485.00 | 25,000.00 | 25,000.00 |
0006 | 202-03-38000 | Relocation of Sign (Street & Traffic) | 163 | EACH | 205.03 | 33,419.89 | 90.33 | 14,723.79 | 500.00 | 81,500.00 |
0007 | 204-02-00100 | Temporary Hay Bales | 1,080 | EACH | 19.55 | 21,114.00 | 22.30 | 24,084.00 | 50.00 | 54,000.00 |
0008 | 702-04-00100 | Adjusting Manholes | 4 | EACH | 1,757.00 | 7,028.00 | 1,875.00 | 7,500.00 | 2,500.00 | 10,000.00 |
0009 | 702-04-00300 | Adjusting Junction Boxes | 1 | EACH | 226.00 | 226.00 | 361.00 | 361.00 | 3,250.00 | 3,250.00 |
0010 | 706-01-00100 | Concrete Walk (4" Thick) | 282.7 | SQYD | 146.45 | 41,401.42 | 156.25 | 44,171.88 | 202.50 | 57,246.75 |
0011 | 706-04-00100 | Handicapped Curb Ramps | 23 | EACH | 3,222.00 | 74,106.00 | 3,438.00 | 79,074.00 | 4,000.00 | 92,000.00 |
0012 | 707-01-00100 | Concrete Curb | 104 | LNFT | 35.15 | 3,655.60 | 47.50 | 4,940.00 | 55.00 | 5,720.00 |
0013 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 33,605.00 | 33,605.00 | 81,820.00 | 81,820.00 | 150,000.00 | 150,000.00 |
0014 | 727-01-00100 | Mobilization | 1 | LUMP | 265,863.00 | 265,863.00 | 216,574.00 | 216,574.00 | 450,000.00 | 450,000.00 |
0015 | 729-01-00100 | Sign (Type A) | 266.3 | SQFT | 19.91 | 5,302.03 | 45.68 | 12,164.58 | 110.00 | 29,293.00 |
0016 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 16 | EACH | 146.00 | 2,336.00 | 387.00 | 6,192.00 | 4,700.00 | 75,200.00 |
0017 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 64 | LNFT | 6.00 | 384.00 | 5.00 | 320.00 | 7.00 | 448.00 |
0018 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 4,130 | LNFT | 4.69 | 19,369.70 | 5.00 | 20,650.00 | 5.50 | 22,715.00 |
0019 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 19,704 | LNFT | 14.06 | 277,038.24 | 15.00 | 295,560.00 | 16.50 | 325,116.00 |
0020 | 732-05-00100 | Removal of Existing Markings | 1.047 | MILE | 41,005.00 | 42,932.24 | 43,750.00 | 45,806.25 | 47,355.00 | 49,580.69 |
0021 | 736-01-00100 | Trenching and Backfilling | 1,854 | LNFT | 3.77 | 6,989.58 | 4.51 | 8,361.54 | 19.65 | 36,431.10 |
0022 | 736-03-00100 | Jacking or Boring | 8,497 | LNFT | 23.72 | 201,548.84 | 25.31 | 215,059.07 | 36.00 | 305,892.00 |
0023 | 736-04-00001 | Signal Pole (Pedestal Pole) | 31 | EACH | 1,018.00 | 31,558.00 | 782.00 | 24,242.00 | 1,650.00 | 51,150.00 |
0024 | 736-05-30002 | Signal Heads (3 Section, 12 inch Optically Programmed Lens, R, Y, G) | 17 | EACH | 3,586.00 | 60,962.00 | 4,095.00 | 69,615.00 | 6,350.00 | 107,950.00 |
0025 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 11 | EACH | 6,720.00 | 73,920.00 | 4,561.00 | 50,171.00 | 8,150.00 | 89,650.00 |
0026 | 736-10-00300 | Underground Junction Box (Type F) | 141 | EACH | 637.06 | 89,825.46 | 787.55 | 111,044.55 | 1,300.00 | 183,300.00 |
0027 | 736-10-00400 | Underground Junction Box (Type G) | 11 | EACH | 968.00 | 10,648.00 | 1,263.00 | 13,893.00 | 1,500.00 | 16,500.00 |
0028 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 11,872 | LNFT | 5.64 | 66,958.08 | 8.14 | 96,638.08 | 12.50 | 148,400.00 |
0029 | 736-12-02014 | Conductor (2c, #14 awg) | 25,037 | LNFT | 1.20 | 30,044.40 | 1.33 | 33,299.21 | 2.35 | 58,836.95 |
0030 | 736-12-06014 | Conductor (6c, #14 awg) | 30,384 | LNFT | 1.98 | 60,160.32 | 2.00 | 60,768.00 | 2.50 | 75,960.00 |
0031 | 736-12-10014 | Conductor (10c, #14 awg) | 2,734 | LNFT | 2.80 | 7,655.20 | 2.74 | 7,491.16 | 3.25 | 8,885.50 |
0032 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 31 | EACH | 1,170.00 | 36,270.00 | 952.00 | 29,512.00 | 1,050.00 | 32,550.00 |
0033 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 402 | EACH | 690.08 | 277,412.16 | 655.03 | 263,322.06 | 950.00 | 381,900.00 |
0034 | 740-01-00100 | Construction Layout | 1 | LUMP | 21,342.00 | 21,342.00 | 23,266.00 | 23,266.00 | 7,500.00 | 7,500.00 |
0035 | 822-02-01500 | Conduit w Conductors (Rigid Alum) (2") (Retrofit) | 170 | LNFT | 15.91 | 2,704.70 | 25.53 | 4,340.10 | 45.00 | 7,650.00 |
0036 | NS-736-00130 | TS-2 Traffic Signal Cabinet (Ground Mounted) | 11 | EACH | 20,685.00 | 227,535.00 | 19,734.00 | 217,074.00 | 23,000.00 | 253,000.00 |
0037 | NS-736-00135 | 2-Wire Accessible Pedestrian Pushbutton Detectors | 402 | EACH | 706.07 | 283,840.14 | 842.94 | 338,861.88 | 950.00 | 381,900.00 |
0038 | NS-736-00136 | 2-Wire Accessible Pedestrian Pushbutton Cabinet Control | 11 | EACH | 2,749.00 | 30,239.00 | 2,890.00 | 31,790.00 | 3,900.00 | 42,900.00 |
0039 | NS-736-00200 | Rectangular Rapid Flashing Beacon Assembly Pair (Single Sided) | 14 | EACH | 4,160.00 | 58,240.00 | 4,767.00 | 66,738.00 | 9,725.00 | 136,150.00 |
0040 | NS-736-00210 | Rectangular Rapid Flashing Beacon Assembly Pair (Double Sided) | 2 | EACH | 5,139.00 | 10,278.00 | 5,689.00 | 11,378.00 | 10,750.00 | 21,500.00 |
0041 | NS-ITS-04290 | Fiber Optic Patch Cord, SM, 2 Strand, Furnish & Install | 22 | EACH | 179.00 | 3,938.00 | 64.00 | 1,408.00 | 85.00 | 1,870.00 |
0042 | NS-ITS-09080 | Local Ethernet Switch, Furnish & Install | 11 | EACH | 2,038.00 | 22,418.00 | 3,000.00 | 33,000.00 | 3,690.00 | 40,590.00 |
0043 | NS-MSC-00080 | Detectable Warning System Retrofit for Curb Ramps | 19 | EACH | 234.00 | 4,446.00 | 250.00 | 4,750.00 | 2,450.00 | 46,550.00 |
0044 | TS-706-03000 | Concrete Paver Sidewalk (Brick) | 37 | SQYD | 293.00 | 10,841.00 | 313.00 | 11,581.00 | 540.00 | 19,980.00 |
0045 | TS-736-00005 | Traffic Controller Unit Re-Programming | 33 | EACH | 830.00 | 27,390.00 | 688.00 | 22,704.00 | 850.00 | 28,050.00 |
0046 | TS-736-00110 | Pedestrian Signal Cable (5c #14 AWG) | 41,840 | LNFT | 1.71 | 71,546.40 | 1.84 | 76,985.60 | 2.75 | 115,060.00 |
0047 | TS-736-00350 | Pulling Cable Through Existing Conduit | 3,140 | LNFT | 1.88 | 5,903.20 | 0.91 | 2,857.40 | 31.00 | 97,340.00 |
| | | | | | | | | | |
| | CONTRACTOR TOTAL | | | | 2,602,735.43 | | 2,746,895.65 | | 4,204,436.49 |