Proposal:H.010962.6-R1
Parish:Acadia, Lafayette
Routes:I-10
Description:I-10: CABLE BARRIER (LAFAYETTE/ACADIA)
Type Construction:GRADING, DRAINAGE STRUCTURES, HIGH TENSION CABLE BARRIER, CONCRETE STRIP, AND RELATED WORK.
Estimated Construction Cost:$10,562,121.00
| Rank | License | Bidder | Construction Bid |
| 1 | 64986 | Patriot Construction and Industrial, LLC | $14,077,250.23 |
| 2 | 39462 | JB JAMES CONSTRUCTION LLC | $14,582,566.20 |
| 3 | 57931 | KCR CONTRACTORS, LLC | $14,852,247.69 |
| 4 | 30774 | Progressive Construction Co., LLC | $15,490,211.15 |
| 5 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $17,384,253.25 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Patriot Construction and Industrial, LLC | - 2 - JB JAMES CONSTRUCTION LLC | - 3 - KCR CONTRACTORS, LLC | - 4 - Progressive Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of Safety End Treatment | 43 | EACH | 635.15 | 27,311.45 | 400.00 | 17,200.00 | 582.76 | 25,058.68 | 800.00 | 34,400.00 | | 0002 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 1,442.05 | 2,884.10 | 550.00 | 1,100.00 | 735.00 | 1,470.00 | 1,400.00 | 2,800.00 | | 0003 | 202-02-32120 | Removal of Pipe (Side Drain) 15" RCP | 56 | LNFT | 98.50 | 5,516.00 | 30.00 | 1,680.00 | 21.39 | 1,197.84 | 68.00 | 3,808.00 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) 18" RCP | 25 | LNFT | 98.88 | 2,472.00 | 40.00 | 1,000.00 | 24.15 | 603.75 | 67.00 | 1,675.00 | | 0005 | 203-01-00100 | General Excavation | 16,159 | CUYD | 6.50 | 105,033.50 | 5.00 | 80,795.00 | 19.14 | 309,283.26 | 9.00 | 145,431.00 | | 0006 | 203-03-00100 | Embankment | 63,094 | CUYD | 21.54 | 1,359,044.76 | 26.00 | 1,640,444.00 | 28.22 | 1,780,512.68 | 45.00 | 2,839,230.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 313 | EACH | 79.56 | 24,902.28 | 115.00 | 35,995.00 | 123.63 | 38,696.19 | 150.00 | 46,950.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 1,306 | LNFT | 3.15 | 4,113.90 | 4.00 | 5,224.00 | 3.22 | 4,205.32 | 4.00 | 5,224.00 | | 0009 | 204-07-00100 | Temporary Stone Construction Entrance | 22 | EACH | 7,895.05 | 173,691.10 | 4,000.00 | 88,000.00 | 3,759.54 | 82,709.88 | 2,200.00 | 48,400.00 | | 0010 | 701-05-01046 | Side Drain Pipe (18" RCP/RPVCP) | 496 | LNFT | 101.48 | 50,334.08 | 110.00 | 54,560.00 | 47.69 | 23,654.24 | 215.00 | 106,640.00 | | 0011 | 701-10-01020 | Reinforced Concrete Pipe (Extension) (15") | 69 | LNFT | 81.00 | 5,589.00 | 125.00 | 8,625.00 | 72.69 | 5,015.61 | 500.00 | 34,500.00 | | 0012 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 248 | LNFT | 87.50 | 21,700.00 | 150.00 | 37,200.00 | 49.30 | 12,226.40 | 441.00 | 109,368.00 | | 0013 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 103 | LNFT | 79.30 | 8,167.90 | 175.00 | 18,025.00 | 93.87 | 9,668.61 | 417.00 | 42,951.00 | | 0014 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 10 | LNFT | 568.02 | 5,680.20 | 200.00 | 2,000.00 | 171.41 | 1,714.10 | 900.00 | 9,000.00 | | 0015 | 701-15-00100 | Concrete Collar | 37 | EACH | 1,404.26 | 51,957.62 | 1,700.00 | 62,900.00 | 1,093.08 | 40,443.96 | 1,800.00 | 66,600.00 | | 0016 | 702-03-00100 | Catch Basins (CB-01) | 36 | EACH | 3,243.01 | 116,748.36 | 3,950.00 | 142,200.00 | 2,892.43 | 104,127.48 | 4,000.00 | 144,000.00 | | 0017 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 1 | EACH | 3,883.10 | 3,883.10 | 8,500.00 | 8,500.00 | 525.00 | 525.00 | 1,800.00 | 1,800.00 | | 0018 | 702-04-00200 | Adjusting Catch Basins | 20 | EACH | 2,838.49 | 56,769.80 | 2,850.00 | 57,000.00 | 1,774.99 | 35,499.80 | 4,430.00 | 88,600.00 | | 0019 | 702-07-00100 | Cross Drain Safety End (Type 1) | 2 | EACH | 2,999.57 | 5,999.14 | 3,700.00 | 7,400.00 | 2,138.60 | 4,277.20 | 5,900.00 | 11,800.00 | | 0020 | 702-08-00100 | Side Drain Safety End (Type 1) | 58 | EACH | 2,705.48 | 156,917.84 | 2,450.00 | 142,100.00 | 2,615.22 | 151,682.76 | 2,400.00 | 139,200.00 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 1,208,653.00 | 1,208,653.00 | 600,000.00 | 600,000.00 | 576,912.24 | 576,912.24 | 900,000.00 | 900,000.00 | | 0022 | 716-01-00100 | Mulch (Vegetative) | 253.4 | TON | 525.00 | 133,035.00 | 600.00 | 152,040.00 | 537.50 | 136,202.50 | 600.00 | 152,040.00 | | 0023 | 717-01-00100 | Seeding | 5,366 | LB | 11.29 | 60,582.14 | 11.50 | 61,709.00 | 11.56 | 62,030.96 | 13.50 | 72,441.00 | | 0024 | 718-01-00100 | Fertilizer | 178,804 | LB | 0.58 | 103,706.32 | 0.50 | 89,402.00 | 0.59 | 105,494.36 | 0.65 | 116,222.60 | | 0025 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 36,018 | SQYD | 2.74 | 98,689.32 | 1.25 | 45,022.50 | 1.59 | 57,268.62 | 1.60 | 57,628.80 | | 0026 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 10,229 | SQYD | 3.02 | 30,891.58 | 1.30 | 13,297.70 | 1.88 | 19,230.52 | 1.75 | 17,900.75 | | 0027 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 171 | SQYD | 3.02 | 516.42 | 1.50 | 256.50 | 1.88 | 321.48 | 2.40 | 410.40 | | 0028 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 247 | SQYD | 2.97 | 733.59 | 1.50 | 370.50 | 1.88 | 464.36 | 1.80 | 444.60 | | 0029 | 726-01-00100 | Bedding Material | 128.5 | CUYD | 209.38 | 26,905.33 | 100.00 | 12,850.00 | 73.50 | 9,444.75 | 136.00 | 17,476.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 293,461.00 | 293,461.00 | 1,400,000.00 | 1,400,000.00 | 1,271,300.00 | 1,271,300.00 | 1,200,000.00 | 1,200,000.00 | | 0031 | 740-01-00100 | Construction Layout | 1 | LUMP | 21,671.10 | 21,671.10 | 120,000.00 | 120,000.00 | 89,775.00 | 89,775.00 | 185,000.00 | 185,000.00 | | 0032 | NS-704-00001 | High Tension Cable Barrier | 205,258 | LNFT | 13.13 | 2,695,037.54 | 12.00 | 2,463,096.00 | 9.97 | 2,046,422.26 | 10.00 | 2,052,580.00 | | 0033 | NS-704-00002 | Cable Barrier Gated End Terminal | 138 | EACH | 8,925.00 | 1,231,650.00 | 4,500.00 | 621,000.00 | 4,452.26 | 614,411.88 | 4,100.00 | 565,800.00 | | 0034 | NS-704-00003 | Concrete Strip | 136,842 | SQYD | 43.28 | 5,922,521.76 | 47.00 | 6,431,574.00 | 52.40 | 7,170,520.80 | 45.00 | 6,157,890.00 | | 0035 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 8 | EACH | 7,560.00 | 60,480.00 | 20,000.00 | 160,000.00 | 7,484.40 | 59,875.20 | 14,000.00 | 112,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 14,077,250.23 | | 14,582,566.20 | | 14,852,247.69 | | 15,490,211.15 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - GILCHRIST CONSTRUCTION COMPANY, LLC | | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of Safety End Treatment | 43 | EACH | 800.00 | 34,400.00 | | 0002 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 1,600.00 | 3,200.00 | | 0003 | 202-02-32120 | Removal of Pipe (Side Drain) 15" RCP | 56 | LNFT | 30.00 | 1,680.00 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) 18" RCP | 25 | LNFT | 30.00 | 750.00 | | 0005 | 203-01-00100 | General Excavation | 16,159 | CUYD | 7.00 | 113,113.00 | | 0006 | 203-03-00100 | Embankment | 63,094 | CUYD | 31.00 | 1,955,914.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 313 | EACH | 135.00 | 42,255.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 1,306 | LNFT | 5.00 | 6,530.00 | | 0009 | 204-07-00100 | Temporary Stone Construction Entrance | 22 | EACH | 4,000.00 | 88,000.00 | | 0010 | 701-05-01046 | Side Drain Pipe (18" RCP/RPVCP) | 496 | LNFT | 250.00 | 124,000.00 | | 0011 | 701-10-01020 | Reinforced Concrete Pipe (Extension) (15") | 69 | LNFT | 250.00 | 17,250.00 | | 0012 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 248 | LNFT | 250.00 | 62,000.00 | | 0013 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 103 | LNFT | 250.00 | 25,750.00 | | 0014 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 10 | LNFT | 550.00 | 5,500.00 | | 0015 | 701-15-00100 | Concrete Collar | 37 | EACH | 2,000.00 | 74,000.00 | | 0016 | 702-03-00100 | Catch Basins (CB-01) | 36 | EACH | 4,800.00 | 172,800.00 | | 0017 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 1 | EACH | 10,000.00 | 10,000.00 | | 0018 | 702-04-00200 | Adjusting Catch Basins | 20 | EACH | 10,000.00 | 200,000.00 | | 0019 | 702-07-00100 | Cross Drain Safety End (Type 1) | 2 | EACH | 6,000.00 | 12,000.00 | | 0020 | 702-08-00100 | Side Drain Safety End (Type 1) | 58 | EACH | 4,000.00 | 232,000.00 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 1,000,000.00 | 1,000,000.00 | | 0022 | 716-01-00100 | Mulch (Vegetative) | 253.4 | TON | 350.00 | 88,690.00 | | 0023 | 717-01-00100 | Seeding | 5,366 | LB | 12.00 | 64,392.00 | | 0024 | 718-01-00100 | Fertilizer | 178,804 | LB | 0.50 | 89,402.00 | | 0025 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 36,018 | SQYD | 1.35 | 48,624.30 | | 0026 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 10,229 | SQYD | 1.35 | 13,809.15 | | 0027 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 171 | SQYD | 1.60 | 273.60 | | 0028 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 247 | SQYD | 1.60 | 395.20 | | 0029 | 726-01-00100 | Bedding Material | 128.5 | CUYD | 200.00 | 25,700.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 1,730,000.00 | 1,730,000.00 | | 0031 | 740-01-00100 | Construction Layout | 1 | LUMP | 815,000.00 | 815,000.00 | | 0032 | NS-704-00001 | High Tension Cable Barrier | 205,258 | LNFT | 12.50 | 2,565,725.00 | | 0033 | NS-704-00002 | Cable Barrier Gated End Terminal | 138 | EACH | 5,500.00 | 759,000.00 | | 0034 | NS-704-00003 | Concrete Strip | 136,842 | SQYD | 50.00 | 6,842,100.00 | | 0035 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 8 | EACH | 20,000.00 | 160,000.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 17,384,253.25 |
|