Bid Tabulations for the Letting of 10/21/2020 LA DOTD Headquarters
Proposal:H.012473.6
Parish:Orleans
Description:MARCONI DR SHARED-USE PATH
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, SHARED-USE PATH, RAISED BOARD WALK, AND RELATED WORK.
Estimated Construction Cost:$724,172.00
Rank | License | Bidder | Construction Bid |
2 | 24901 | Hard Rock Construction LLC | $598,447.00 |
3 | 36961 | Cycle Construction Co. L.L.C. | $633,147.60 |
4 | 57835 | Roubion Roads & Streets LLC | $636,576.14 |
5 | 69714 | Roadwrxx, LLC | $656,665.00 |
6 | 61575 | La Pequena Construction LLC | $698,597.50 |
7 | 28190 | Buck Town Contractors & Co. | $703,362.60 |
8 | 04674 | Durr Heavy Construction L.L.C. | $721,500.00 |
9 | 14914 | Kass Bros. Inc. | $771,735.60 |
10 | 48896 | Command Construction Industries LLC | $856,938.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 2 - Hard Rock Construction LLC | - 3 - Cycle Construction Co. L.L.C. | - 4 - Roubion Roads & Streets LLC | - 5 - Roadwrxx, LLC |
Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount |
0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 1,000.00 | 1,000.00 | 31,000.00 | 31,000.00 | 2,852.38 | 2,852.38 | 5,000.00 | 5,000.00 |
0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 99.20 | 99.20 | 1,500.00 | 1,500.00 | 2,178.86 | 2,178.86 | 1,000.00 | 1,000.00 |
0003 | 202-02-00010 | Removal of Parking Bollard | 72 | EACH | 25.00 | 1,800.00 | 35.00 | 2,520.00 | 57.33 | 4,127.76 | 30.00 | 2,160.00 |
0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 3 | SQYD | 45.00 | 135.00 | 195.00 | 585.00 | 44.79 | 134.37 | 100.00 | 300.00 |
0005 | 202-02-06140 | Removal of Curbs (Concrete) | 52 | LNFT | 30.00 | 1,560.00 | 23.00 | 1,196.00 | 6.81 | 354.12 | 25.00 | 1,300.00 |
0006 | 202-02-38240 | Removal of Signs and Supports (Concrete Foundation 42"x10"x36") | 1 | EACH | 600.00 | 600.00 | 1,100.00 | 1,100.00 | 637.83 | 637.83 | 500.00 | 500.00 |
0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 30,000.00 | 30,000.00 | 45,000.00 | 45,000.00 | 11,170.91 | 11,170.91 | 30,000.00 | 30,000.00 |
0008 | 204-06-00100 | Temporary Silt Fencing | 6,400 | LNFT | 2.10 | 13,440.00 | 2.00 | 12,800.00 | 3.32 | 21,248.00 | 1.00 | 6,400.00 |
0009 | 701-16-01000 | Plastic Pipe (Extension) (12" RPVCP) | 13 | LNFT | 160.00 | 2,080.00 | 65.00 | 845.00 | 70.70 | 919.10 | 25.00 | 325.00 |
0010 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 1 | EACH | 1,400.00 | 1,400.00 | 1,900.00 | 1,900.00 | 1,788.31 | 1,788.31 | 500.00 | 500.00 |
0011 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 700.00 | 1,400.00 | 1,000.00 | 2,000.00 | 473.58 | 947.16 | 500.00 | 1,000.00 |
0012 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 700.00 | 700.00 | 1,000.00 | 1,000.00 | 373.23 | 373.23 | 500.00 | 500.00 |
0013 | 706-04-00100 | Handicapped Curb Ramps | 6 | EACH | 3,100.00 | 18,600.00 | 2,000.00 | 12,000.00 | 1,146.85 | 6,881.10 | 2,000.00 | 12,000.00 |
0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | 7,526.66 | 7,526.66 | 5,000.00 | 5,000.00 |
0015 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 1,434 | SQYD | 9.00 | 12,906.00 | 8.00 | 11,472.00 | 14.43 | 20,692.62 | 10.00 | 14,340.00 |
0016 | 726-01-00100 | Bedding Material | 0.5 | CUYD | 600.00 | 300.00 | 300.00 | 150.00 | 136.44 | 68.22 | 100.00 | 50.00 |
0017 | 727-01-00100 | Mobilization | 1 | LUMP | 41,000.00 | 41,000.00 | 74,000.00 | 74,000.00 | 16,607.23 | 16,607.23 | 65,000.00 | 65,000.00 |
0018 | 729-01-00100 | Sign (Type A) | 49 | SQFT | 24.00 | 1,176.00 | 27.00 | 1,323.00 | 60.14 | 2,946.86 | 30.00 | 1,470.00 |
0019 | 729-21-00100 | U-Channel Post | 10 | EACH | 105.00 | 1,050.00 | 139.00 | 1,390.00 | 83.25 | 832.50 | 100.00 | 1,000.00 |
0020 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 581 | LNFT | 16.50 | 9,586.50 | 17.00 | 9,877.00 | 18.04 | 10,481.24 | 20.00 | 11,620.00 |
0021 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.447 | MILE | 3,900.00 | 1,743.30 | 3,800.00 | 1,698.60 | 3,006.81 | 1,344.04 | 5,000.00 | 2,235.00 |
0022 | 732-04-19100 | Plastic Pavement Legends and Symbols (STOP AHEAD) | 2 | EACH | 1,100.00 | 2,200.00 | 1,100.00 | 2,200.00 | 601.36 | 1,202.72 | 3,000.00 | 6,000.00 |
0023 | 732-05-00100 | Removal of Existing Markings | 0.014 | MILE | 16,500.00 | 231.00 | 17,000.00 | 238.00 | 36,081.76 | 505.14 | 75,000.00 | 1,050.00 |
0024 | 739-01-00100 | Hydro-Seeding | 0.45 | ACRE | 4,500.00 | 2,025.00 | 6,100.00 | 2,745.00 | 5,773.08 | 2,597.89 | 5,000.00 | 2,250.00 |
0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 11,000.00 | 11,000.00 | 10,000.00 | 10,000.00 | 9,928.26 | 9,928.26 | 1,000.00 | 1,000.00 |
0026 | NS-700-00100 | Trench Drains concrete w/ metal plate | 6 | EACH | 1,900.00 | 11,400.00 | 5,600.00 | 33,600.00 | 1,694.16 | 10,164.96 | 3,500.00 | 21,000.00 |
0027 | NS-706-00440 | Shared-Use Path (Portland Cement Concrete) (6" Thick) | 2,629 | SQYD | 60.00 | 157,740.00 | 52.00 | 136,708.00 | 64.20 | 168,781.80 | 85.00 | 223,465.00 |
0028 | NS-719-00001 | Tree Protection Fencing | 1 | LUMP | 9,500.00 | 9,500.00 | 5,000.00 | 5,000.00 | 9,031.99 | 9,031.99 | 5,000.00 | 5,000.00 |
0029 | NS-719-00003 | Root Pruning | 1 | LUMP | 9,500.00 | 9,500.00 | 7,500.00 | 7,500.00 | 8,419.08 | 8,419.08 | 5,000.00 | 5,000.00 |
0030 | TS-700-02080 | Bollard Wooden | 95 | EACH | 165.00 | 15,675.00 | 200.00 | 19,000.00 | 174.40 | 16,568.00 | 160.00 | 15,200.00 |
0031 | TS-700-03010 | Boardwalk Raised,10' Wide | 860 | LF | 260.00 | 223,600.00 | 230.00 | 197,800.00 | 343.33 | 295,263.80 | 250.00 | 215,000.00 |
| | | | | | | | | | | | |
| | CONTRACTOR TOTAL | | | | 598,447.00 | | 633,147.60 | | 636,576.14 | | 656,665.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 6 - La Pequena Construction LLC | - 7 - Buck Town Contractors & Co. | - 8 - Durr Heavy Construction L.L.C. | - 9 - Kass Bros. Inc. |
Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount |
0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 40,000.00 | 40,000.00 | 9,300.00 | 9,300.00 | 5,000.00 | 5,000.00 | 22,650.00 | 22,650.00 |
0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 500.00 | 500.00 | 200.00 | 200.00 | 4,600.00 | 4,600.00 |
0003 | 202-02-00010 | Removal of Parking Bollard | 72 | EACH | 100.00 | 7,200.00 | 20.00 | 1,440.00 | 9.00 | 648.00 | 53.50 | 3,852.00 |
0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 3 | SQYD | 17.00 | 51.00 | 30.00 | 90.00 | 400.00 | 1,200.00 | 350.00 | 1,050.00 |
0005 | 202-02-06140 | Removal of Curbs (Concrete) | 52 | LNFT | 11.00 | 572.00 | 8.00 | 416.00 | 2.00 | 104.00 | 41.00 | 2,132.00 |
0006 | 202-02-38240 | Removal of Signs and Supports (Concrete Foundation 42"x10"x36") | 1 | EACH | 300.00 | 300.00 | 800.00 | 800.00 | 50.00 | 50.00 | 675.00 | 675.00 |
0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 60,000.00 | 60,000.00 | 18,000.00 | 18,000.00 | 7,000.00 | 7,000.00 | 61,000.00 | 61,000.00 |
0008 | 204-06-00100 | Temporary Silt Fencing | 6,400 | LNFT | 1.00 | 6,400.00 | 1.00 | 6,400.00 | 1.85 | 11,840.00 | 2.00 | 12,800.00 |
0009 | 701-16-01000 | Plastic Pipe (Extension) (12" RPVCP) | 13 | LNFT | 150.00 | 1,950.00 | 100.00 | 1,300.00 | 90.00 | 1,170.00 | 225.00 | 2,925.00 |
0010 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 1 | EACH | 4,500.00 | 4,500.00 | 2,200.00 | 2,200.00 | 1,400.00 | 1,400.00 | 2,000.00 | 2,000.00 |
0011 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 900.00 | 1,800.00 | 1,600.00 | 3,200.00 | 700.00 | 1,400.00 | 625.00 | 1,250.00 |
0012 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 900.00 | 900.00 | 1,300.00 | 1,300.00 | 700.00 | 700.00 | 1,150.00 | 1,150.00 |
0013 | 706-04-00100 | Handicapped Curb Ramps | 6 | EACH | 3,000.00 | 18,000.00 | 2,100.00 | 12,600.00 | 3,475.00 | 20,850.00 | 4,650.00 | 27,900.00 |
0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,000.00 | 5,000.00 | 6,000.00 | 6,000.00 | 5,000.00 | 5,000.00 | 11,100.00 | 11,100.00 |
0015 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 1,434 | SQYD | 1.00 | 1,434.00 | 10.00 | 14,340.00 | 9.25 | 13,264.50 | 20.00 | 28,680.00 |
0016 | 726-01-00100 | Bedding Material | 0.5 | CUYD | 150.00 | 75.00 | 1,660.00 | 830.00 | 150.00 | 75.00 | 195.00 | 97.50 |
0017 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 | 45,500.00 | 45,500.00 | 111,026.10 | 111,026.10 | 75,000.00 | 75,000.00 |
0018 | 729-01-00100 | Sign (Type A) | 49 | SQFT | 90.00 | 4,410.00 | 25.00 | 1,225.00 | 25.00 | 1,225.00 | 27.00 | 1,323.00 |
0019 | 729-21-00100 | U-Channel Post | 10 | EACH | 15.00 | 150.00 | 110.00 | 1,100.00 | 110.00 | 1,100.00 | 116.50 | 1,165.00 |
0020 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 581 | LNFT | 20.00 | 11,620.00 | 14.50 | 8,424.50 | 14.90 | 8,656.90 | 18.50 | 10,748.50 |
0021 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.447 | MILE | 2,500.00 | 1,117.50 | 4,700.00 | 2,100.90 | 4,901.00 | 2,190.75 | 4,300.00 | 1,922.10 |
0022 | 732-04-19100 | Plastic Pavement Legends and Symbols (STOP AHEAD) | 2 | EACH | 300.00 | 600.00 | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 | 1,250.00 | 2,500.00 |
0023 | 732-05-00100 | Removal of Existing Markings | 0.014 | MILE | 50,000.00 | 700.00 | 28,800.00 | 403.20 | 30,000.00 | 420.00 | 18,500.00 | 259.00 |
0024 | 739-01-00100 | Hydro-Seeding | 0.45 | ACRE | 2,500.00 | 1,125.00 | 4,000.00 | 1,800.00 | 7,777.78 | 3,500.00 | 7,400.00 | 3,330.00 |
0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 27,000.00 | 27,000.00 | 15,600.00 | 15,600.00 |
0026 | NS-700-00100 | Trench Drains concrete w/ metal plate | 6 | EACH | 1,200.00 | 7,200.00 | 2,550.00 | 15,300.00 | 4,700.00 | 28,200.00 | 2,175.00 | 13,050.00 |
0027 | NS-706-00440 | Shared-Use Path (Portland Cement Concrete) (6" Thick) | 2,629 | SQYD | 67.00 | 176,143.00 | 62.00 | 162,998.00 | 72.75 | 191,259.75 | 68.50 | 180,086.50 |
0028 | NS-719-00001 | Tree Protection Fencing | 1 | LUMP | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 27,000.00 | 27,000.00 |
0029 | NS-719-00003 | Root Pruning | 1 | LUMP | 10,000.00 | 10,000.00 | 24,600.00 | 24,600.00 | 8,000.00 | 8,000.00 | 8,500.00 | 8,500.00 |
0030 | TS-700-02080 | Bollard Wooden | 95 | EACH | 250.00 | 23,750.00 | 165.00 | 15,675.00 | 160.00 | 15,200.00 | 178.00 | 16,910.00 |
0031 | TS-700-03010 | Boardwalk Raised,10' Wide | 860 | LF | 260.00 | 223,600.00 | 382.00 | 328,520.00 | 287.00 | 246,820.00 | 268.00 | 230,480.00 |
| | | | | | | | | | | | |
| | CONTRACTOR TOTAL | | | | 698,597.50 | | 703,362.60 | | 721,500.00 | | 771,735.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 10 - Command Construction Industries LLC |
Unit Price | Total Amount |
0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 50,000.00 | 50,000.00 |
0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 |
0003 | 202-02-00010 | Removal of Parking Bollard | 72 | EACH | 25.00 | 1,800.00 |
0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 3 | SQYD | 25.00 | 75.00 |
0005 | 202-02-06140 | Removal of Curbs (Concrete) | 52 | LNFT | 25.00 | 1,300.00 |
0006 | 202-02-38240 | Removal of Signs and Supports (Concrete Foundation 42"x10"x36") | 1 | EACH | 250.00 | 250.00 |
0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 25,000.00 | 25,000.00 |
0008 | 204-06-00100 | Temporary Silt Fencing | 6,400 | LNFT | 0.01 | 64.00 |
0009 | 701-16-01000 | Plastic Pipe (Extension) (12" RPVCP) | 13 | LNFT | 250.00 | 3,250.00 |
0010 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 1 | EACH | 2,500.00 | 2,500.00 |
0011 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 2,500.00 | 5,000.00 |
0012 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 2,500.00 | 2,500.00 |
0013 | 706-04-00100 | Handicapped Curb Ramps | 6 | EACH | 1,000.00 | 6,000.00 |
0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 |
0015 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 1,434 | SQYD | 5.00 | 7,170.00 |
0016 | 726-01-00100 | Bedding Material | 0.5 | CUYD | 250.00 | 125.00 |
0017 | 727-01-00100 | Mobilization | 1 | LUMP | 80,000.00 | 80,000.00 |
0018 | 729-01-00100 | Sign (Type A) | 49 | SQFT | 25.00 | 1,225.00 |
0019 | 729-21-00100 | U-Channel Post | 10 | EACH | 250.00 | 2,500.00 |
0020 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 581 | LNFT | 15.00 | 8,715.00 |
0021 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.447 | MILE | 4,000.00 | 1,788.00 |
0022 | 732-04-19100 | Plastic Pavement Legends and Symbols (STOP AHEAD) | 2 | EACH | 1,000.00 | 2,000.00 |
0023 | 732-05-00100 | Removal of Existing Markings | 0.014 | MILE | 25,000.00 | 350.00 |
0024 | 739-01-00100 | Hydro-Seeding | 0.45 | ACRE | 7,500.00 | 3,375.00 |
0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 |
0026 | NS-700-00100 | Trench Drains concrete w/ metal plate | 6 | EACH | 1,250.00 | 7,500.00 |
0027 | NS-706-00440 | Shared-Use Path (Portland Cement Concrete) (6" Thick) | 2,629 | SQYD | 50.00 | 131,450.00 |
0028 | NS-719-00001 | Tree Protection Fencing | 1 | LUMP | 25,000.00 | 25,000.00 |
0029 | NS-719-00003 | Root Pruning | 1 | LUMP | 1.00 | 1.00 |
0030 | TS-700-02080 | Bollard Wooden | 95 | EACH | 200.00 | 19,000.00 |
0031 | TS-700-03010 | Boardwalk Raised,10' Wide | 860 | LF | 400.00 | 344,000.00 |
| | | | | | |
| | CONTRACTOR TOTAL | | | | 856,938.00 |