Bid Tabulations for the Letting of 7/8/2020 LA DOTD Headquarters
Proposal:H.013750.6
Parish:LaSalle
Routes:LA 126, LA 8, US 84
Description:US 84, LA 8 & LA 126: AST & OVERLAY
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,462,457.31
Rank | License | Bidder | Construction Bid |
1 | 05789 | D & J CONSTRUCTION CO., LLC | $1,685,408.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - D & J CONSTRUCTION CO., LLC |
Unit Price | Total Amount |
0001 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 593 | CUYD | 60.00 | 35,580.00 |
0002 | 501-01-00100 | Thin Asphalt Concrete (Dense Mix) | 3,437 | TON | 124.00 | 426,188.00 |
0003 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 22.9 | TON | 140.00 | 3,206.00 |
0004 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 115,732 | GAL | 2.90 | 335,622.80 |
0005 | 507-02-00300 | Aggregate (S3) CRUSHED STONE ONLY | 373,318 | SQYD | 0.90 | 335,986.20 |
0006 | 509-01-00100 | Milling Asphalt Pavement | 444 | SQYD | 25.00 | 11,100.00 |
0007 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -6 | CUYD | 1.00 | -6.00 |
0008 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 20 | SQYD | 130.00 | 2,600.00 |
0009 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 350 | SQYD | 150.00 | 52,500.00 |
0010 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 455 | SQYD | 180.00 | 81,900.00 |
0011 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 45,000.00 | 45,000.00 |
0012 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 4.912 | MILE | 200.00 | 982.40 |
0013 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 10.585 | MILE | 500.00 | 5,292.50 |
0014 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 78.003 | MILE | 650.00 | 50,701.95 |
0015 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 4,883 | EACH | 2.15 | 10,498.45 |
0016 | 727-01-00100 | Mobilization | 1 | LUMP | 115,000.00 | 115,000.00 |
0017 | 731-02-00100 | Reflectorized Raised Pavement Markers | 4,783 | EACH | 5.50 | 26,306.50 |
0018 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 18.774 | MILE | 3,500.00 | 65,709.00 |
0019 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.776 | MILE | 1,000.00 | 776.00 |
0020 | 735-01-00100 | Mailboxes | 6 | EACH | 25.00 | 150.00 |
0021 | 735-02-00100 | Mailbox Supports (Single) | 6 | EACH | 200.00 | 1,200.00 |
0022 | 737-01-00100 | Painted Traffic Striping (Solid Line) (4" Width) | 59.229 | MILE | 1,000.00 | 59,229.00 |
0023 | 737-02-00100 | Painted Traffic Striping (Broken Line) (4" Width) | 9.809 | MILE | 600.00 | 5,885.40 |
0024 | 740-01-00100 | Construction Layout | 1 | LUMP | 14,000.00 | 14,000.00 |
| | | | | | |
| | CONTRACTOR TOTAL | | | | 1,685,408.20 |