Proposal:H.013742.6
Parish:Tensas
Routes:LA 575
Description:LA 575: LA 4 - LA 888
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,139,931.14
| Rank | License | Bidder | Construction Bid |
| 1 | 05789 | D & J CONSTRUCTION CO., LLC | $2,247,445.55 |
| 2 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $2,718,705.53 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $2,839,616.55 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - D & J CONSTRUCTION CO., LLC | - 2 - GILCHRIST CONSTRUCTION CO. LLC | - 3 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) APPROX. 8.149 ACRES | 8.149 | LUMP | 24,000.00 | 24,000.00 | 36,500.00 | 36,500.00 | 33,000.00 | 33,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,000.00 | 1,000.00 | 10,000.00 | 10,000.00 | 12,500.00 | 12,500.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" RCP/24"/30" | 28 | LNFT | 10.00 | 280.00 | 100.00 | 2,800.00 | 80.00 | 2,240.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 80 | CUYD | 20.00 | 1,600.00 | 60.00 | 4,800.00 | 17.50 | 1,400.00 | | 0005 | 203-10-00100 | Cleaning Existing Ditches | 50 | LNFT | 10.00 | 500.00 | 45.00 | 2,250.00 | 20.00 | 1,000.00 | | 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,172 | CUYD | 65.00 | 141,180.00 | 120.00 | 260,640.00 | 90.00 | 195,480.00 | | 0007 | 502-01-00100 | Asphalt Concrete | 11,966 | TON | 95.00 | 1,136,770.00 | 100.00 | 1,196,600.00 | 120.00 | 1,435,920.00 | | 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 435.1 | TON | 95.00 | 41,334.50 | 100.00 | 43,510.00 | 220.00 | 95,722.00 | | 0009 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 32,278 | GAL | 2.70 | 87,150.60 | 2.75 | 88,764.50 | 2.90 | 93,606.20 | | 0010 | 507-02-00300 | Aggregate (S3) CRUSHED STONE ONLY | 104,125 | SQYD | 1.05 | 109,331.25 | 0.85 | 88,506.25 | 1.15 | 119,743.75 | | 0011 | 509-01-00100 | Milling Asphalt Pavement | 1,877 | SQYD | 6.00 | 11,262.00 | 13.00 | 24,401.00 | 10.00 | 18,770.00 | | 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -64 | CUYD | 1.00 | -64.00 | 1.00 | -64.00 | 1.00 | -64.00 | | 0013 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 3,600 | SQYD | 120.00 | 432,000.00 | 100.00 | 360,000.00 | 120.00 | 432,000.00 | | 0014 | 701-08-00100 | Relaying Pipe 24" RCP | 8 | LNFT | 110.00 | 880.00 | 700.00 | 5,600.00 | 180.00 | 1,440.00 | | 0015 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 48 | LNFT | 120.00 | 5,760.00 | 500.00 | 24,000.00 | 300.00 | 14,400.00 | | 0016 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 8 | LNFT | 130.00 | 1,040.00 | 550.00 | 4,400.00 | 300.00 | 2,400.00 | | 0017 | 701-15-00100 | Concrete Collar | 8 | EACH | 750.00 | 6,000.00 | 2,500.00 | 20,000.00 | 1,000.00 | 8,000.00 | | 0018 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 20 | SQYD | 80.00 | 1,600.00 | 125.00 | 2,500.00 | 125.00 | 2,500.00 | | 0019 | 711-04-00100 | Geotextile Fabric | 20 | SQYD | 3.00 | 60.00 | 30.00 | 600.00 | 6.00 | 120.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 75,000.00 | 75,000.00 | 30,000.00 | 30,000.00 | | 0021 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 8.876 | MILE | 200.00 | 1,775.20 | 200.00 | 1,775.20 | 170.00 | 1,508.92 | | 0022 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 14.866 | MILE | 200.00 | 2,973.20 | 550.00 | 8,176.30 | 500.00 | 7,433.00 | | 0023 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 43.617 | MILE | 200.00 | 8,723.40 | 800.00 | 34,893.60 | 825.00 | 35,984.03 | | 0024 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 2,342 | EACH | 2.00 | 4,684.00 | 2.25 | 5,269.50 | 2.20 | 5,152.40 | | 0025 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 10 | SQYD | 15.00 | 150.00 | 20.00 | 200.00 | 6.00 | 60.00 | | 0026 | 726-01-00100 | Bedding Material | 28.4 | CUYD | 100.00 | 2,840.00 | 170.00 | 4,828.00 | 135.00 | 3,834.00 | | 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 92,000.00 | 92,000.00 | 270,000.00 | 270,000.00 | 155,000.00 | 155,000.00 | | 0028 | 729-16-00200 | Object Marker Assembly (Type 2) | 37 | EACH | 100.00 | 3,700.00 | 80.00 | 2,960.00 | 65.00 | 2,405.00 | | 0029 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,361 | EACH | 6.00 | 8,166.00 | 7.00 | 9,527.00 | 6.00 | 8,166.00 | | 0030 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 0.086 | LNFT | 1,000.00 | 86.00 | 30.00 | 2.58 | 1,700.00 | 146.20 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 21.808 | MILE | 3,800.00 | 82,870.40 | 3,600.00 | 78,508.80 | 4,300.00 | 93,774.40 | | 0032 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 7.433 | MILE | 1,000.00 | 7,433.00 | 1,600.00 | 11,892.80 | 1,050.00 | 7,804.65 | | 0033 | 735-01-00100 | Mailboxes | 12 | EACH | 5.00 | 60.00 | 22.00 | 264.00 | 10.00 | 120.00 | | 0034 | 735-02-00100 | Mailbox Supports (Single) | 12 | EACH | 150.00 | 1,800.00 | 200.00 | 2,400.00 | 200.00 | 2,400.00 | | 0035 | 739-01-00100 | Hydro-Seeding | 0.1 | ACRE | 15,000.00 | 1,500.00 | 22,000.00 | 2,200.00 | 6,500.00 | 650.00 | | 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,000.00 | 7,000.00 | 35,000.00 | 35,000.00 | 15,000.00 | 15,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,247,445.55 | | 2,718,705.53 | | 2,839,616.55 |
|