Bid Tabulations for the Letting of 3/11/2020 LA DOTD Headquarters

Proposal:H.009481.6
Parish:St. James
Routes:LA 20
Description:LA 20 BAYOU CHEVREUIL BRIDGE
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, PRECAST PRESTRESSED CONCRETE GIRDER SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$11,172,631.50
163897TL Hawk, LLC$11,690,767.39
202179Boh Bros. Construction Co., LLC.$13,939,822.10
334567James Construction Group LLC$15,438,091.16
439462JB JAMES CONSTRUCTION LLC$16,282,097.86


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
TL Hawk, LLC
- 2 -
Boh Bros. Construction Co., LLC.
- 3 -
James Construction Group LLC
- 4 -
JB JAMES CONSTRUCTION LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 6     LUMP54,000.0054,000.0070,000.0070,000.00400,000.00400,000.001,500,000.001,500,000.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP9,550.009,550.005,000.005,000.0036,000.0036,000.0024,000.0024,000.00
0003202-02-02020Removal of Asphalt Pavement 2,640.5   SQYD8.0021,124.003.007,921.509.0023,764.506.0015,843.00
0004202-02-03010Removal of Base – Recycled PCC or Stone 2,421.7   SQYD8.0019,373.605.0012,108.5015.0036,325.507.0016,951.90
0005202-02-04501Removal of Bridge STA 111+18, 24'X349' STEEL I-BEAM (ROLLED) - REMOVABLE SPAN BRIDGE1     LUMP505,000.00505,000.00350,000.00350,000.00280,000.00280,000.002,200,000.002,200,000.00
0006202-02-14500Removal of Guard Rail 952     LNFT6.005,712.008.007,616.0010.009,520.006.005,712.00
0007203-01-00100General Excavation 386     CUYD20.007,720.0015.005,790.0050.0019,300.0050.0019,300.00
0008203-02-00100Drainage Excavation 630     CUYD20.0012,600.0015.009,450.0035.0022,050.0020.0012,600.00
0009203-03-00100Embankment 3,290     CUYD40.00131,600.0035.00115,150.0030.0098,700.0042.00138,180.00
0010203-04-00200Nonplastic Embankment (Sand) 6,382     CUYD38.00242,516.0030.00191,460.0040.00255,280.0027.00172,314.00
0011203-08-00220Geotextile Fabric (High Strength) (Type 3) 21,627     SQYD11.00237,897.0012.00259,524.0015.00324,405.008.50183,829.50
0012204-05-00100Temporary Sediment Check Dams (Hay) 7     EACH255.001,785.00155.001,085.00300.002,100.00150.001,050.00
0013204-06-00100Temporary Silt Fencing 4,330     LNFT2.7511,907.502.008,660.003.0012,990.002.5010,825.00
0014302-02-12070Class II Base Course (12" Thick) (Crushed Stone or Recycled Portland Cement Concrete) 2,760.9   SQYD35.0096,631.5025.0069,022.5040.00110,436.0040.00110,436.00
0015401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 415     CUYD95.0039,425.0065.0026,975.00100.0041,500.0075.0031,125.00
0016402-02-00100Mainline Traffic Maintenance Surfacing (Hard) 400     SQYD200.0080,000.0035.0014,000.0080.0032,000.0020.008,000.00
0017402-03-00100Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 350     CUYD15.005,250.0050.0017,500.00115.0040,250.00100.0035,000.00
0018502-01-00100Asphalt Concrete 2,016.2   TON115.73233,334.83130.00262,106.00125.00252,025.00115.00231,863.00
0019502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 121.3   TON143.7517,436.88145.0017,588.50225.0027,292.50185.0022,440.50
0020509-01-00100Milling Asphalt Pavement 1,066     SQYD10.0010,660.0010.0010,660.008.008,528.005.505,863.00
0021509-02-00100Contractor Retained Reclaimed Asphalt Pavement -59     CUYD0.01-0.591.00-59.000.01-0.590.01-0.59
0022510-01-00250Pavement Patching (14 inch Minimum Thickness) 102     SQYD143.5314,640.06150.0015,300.00150.0015,300.00110.0011,220.00
0023701-05-01061Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) CMP Not Allowed60     LNFT75.004,500.00150.009,000.0075.004,500.0090.005,400.00
0024702-08-00100Side Drain Safety End (Type 1) 1     EACH2,500.002,500.003,500.003,500.003,500.003,500.003,000.003,000.00
0025704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 275     LNFT20.005,500.0022.006,050.0026.007,150.0020.005,500.00
0026704-07-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT90.009,000.00115.0011,500.0085.008,500.0090.009,000.00
0027704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) 4     EACH2,600.0010,400.003,200.0012,800.003,500.0014,000.003,200.0012,800.00
0028708-01-00100Right-of-Way Monument 7     EACH410.002,870.001.007.00275.001,925.00280.001,960.00
0029708-02-00100Right-of-Way Monument Witness Post 7     EACH160.001,120.00600.004,200.00275.001,925.00280.001,960.00
0030712-04-00100Flexible Revetment 525     SQYD80.0042,000.00100.0052,500.00140.0073,500.0070.0036,750.00
0031713-01-00100Temporary Signs and Barricades 1     LUMP15,000.0015,000.00135,000.00135,000.0035,000.0035,000.00100,000.00100,000.00
0032713-04-01020Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) 5.301 MILE6,985.4737,029.988,000.0042,408.008,750.0046,383.758,500.0045,058.50
0033713-06-00100Temporary Reflectorized Raised Pavement Markers 351     EACH4.501,579.505.001,755.006.502,281.506.502,281.50
0034713-11-00100Portable Changeable Message Signs 2     EACH13,100.0026,200.0015,000.0030,000.0018,500.0037,000.0018,000.0036,000.00
0035722-02-00100Project Site Laboratory (Equipped) 1     EACH39,000.0039,000.0020,000.0020,000.0035,000.0035,000.0055,000.0055,000.00
0036724-01-00100Rumble Strips (Centerline) 0.268 MILE310.4583.204,500.001,206.00300.0080.40320.0085.76
0037724-02-00100Rumble Strips (Shoulder/Edge) 0.537 MILE315.83169.604,500.002,416.50300.00161.10320.00171.84
0038725-01-00100Temporary Detour Roads 3,973.5   SQYD124.00492,714.00130.00516,555.00170.00675,495.00135.00536,422.50
0039727-01-00100Mobilization 1     LUMP1,150,000.001,150,000.001,500,000.001,500,000.001,543,800.001,543,800.001,350,000.001,350,000.00
0040729-16-00300Object Marker Assembly (Type 3) 4     EACH85.00340.0090.00360.0050.00200.0080.00320.00
0041731-02-00100Reflectorized Raised Pavement Markers 102     EACH5.50561.006.50663.006.00612.006.50663.00
0042732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 1.654 MILE2,910.524,814.003,300.005,458.203,500.005,789.003,500.005,789.00
0043732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.114 MILE1,061.40121.001,200.00136.801,500.00171.001,575.00179.55
0044732-05-00100Removal of Existing Markings 0.5   MILE4,900.002,450.005,500.002,750.005,000.002,500.005,000.002,500.00
0045739-01-00100Hydro-Seeding 3.3   ACRE1,741.635,747.382,000.006,600.001,700.005,610.002,500.008,250.00
0046740-01-00100Construction Layout 1     LUMP150,000.00150,000.00325,000.00325,000.00165,000.00165,000.00110,000.00110,000.00
0047804-01-00600Precast Concrete Piles (24") 5,480     LNFT110.00602,800.00135.00739,800.00125.00685,000.00140.00767,200.00
0048804-01-00700Precast Concrete Piles (30") 5,920     LNFT190.001,124,800.00224.001,326,080.00233.001,379,360.00195.001,154,400.00
0049804-05-00600Precast Concrete Test Piles (24") 2     EACH40,000.0080,000.0051,800.00103,600.0042,000.0084,000.0040,000.0080,000.00
0050804-05-00700Precast Concrete Test Piles (30") 1     EACH50,000.0050,000.0060,500.0060,500.0052,000.0052,000.0050,000.0050,000.00
0051804-14-00100Dynamic Monitoring Assistance 21     EACH1,500.0031,500.002,520.0052,920.002,500.0052,500.002,000.0042,000.00
0052805-01-00100Class A1 Concrete (Slab Span) 554.72  CUYD675.00374,436.00900.00499,248.001,200.00665,664.00775.00429,908.00
0053805-01-00200Class A1 Concrete (Deck) 678.58  CUYD650.00441,077.00900.00610,722.00800.00542,864.001,000.00678,580.00
0054805-01-00300Class A1 Concrete (Bent Cap) 378.65  CUYD825.00312,386.251,500.00567,975.001,350.00511,177.501,600.00605,840.00
0055805-08-01200Precast-Prestressed Concrete Girder (Type LG-36) 2,753     LNFT300.00825,900.00320.00880,960.00350.00963,550.00315.00867,195.00
0056805-18-00100Concrete Finish (Class 2 Rubbed Finish) 11,084     SQFT1.2513,855.001.0011,084.002.0022,168.001.0011,084.00
0057805-18-00200Concrete Finish (Class 3 Special Finish) 11,084     SQFT1.1512,746.600.758,313.001.0011,084.001.0011,084.00
0058806-01-00100Deformed Reinforcing Steel 330,404     LB1.15379,964.601.10363,444.401.00330,404.001.25413,005.00
0059807-04-00100Structural Metalwork (Threaded Rods in Diaphragms)390     LUMP3,000.003,000.003,500.003,500.007,000.007,000.0015,000.0015,000.00
0060810-01-00120Concrete Bridge Railing (36 inch Height) 1,670     LNFT98.00163,660.00125.00208,750.0065.00108,550.00100.00167,000.00
0061813-01-00100Concrete Approach Slabs (Cast-in-Place) 3,200     SQFT62.00198,400.0070.00224,000.0080.00256,000.0060.00192,000.00
0062814-01-00100Elastomeric Bearing Pads (Non-Reinforced) 420     SFIN70.0029,400.0060.0025,200.00100.0042,000.0095.0039,900.00
0063814-02-00100Elastomeric Bearing Pads (Reinforced) 300     SFIN70.0021,000.00130.0039,000.00100.0030,000.0085.0025,500.00
0064815-02-00100Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) 425     LNFT285.00121,125.00300.00127,500.00350.00148,750.00500.00212,500.00
0065815-03-00300Joint Seal (Poured) 595     LNFT20.0011,900.0010.005,950.0010.005,950.0010.005,950.00
0066816-02-00100Bridge End Drain System (Open Drain) 4     EACH5,500.0022,000.0020,000.0080,000.0010,000.0040,000.0010,000.0040,000.00
0067817-01-00200Temporary Detour Bridge (Steel Truss) 19,672     SQFT155.003,049,160.00193.003,796,696.00240.004,721,280.00170.003,344,240.00
0068NS-300-00060Geogrid 5,342     SQYD1.759,348.500.904,807.803.0016,026.002.2512,019.50
0069NS-500-00240Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay 240     LNFT10.002,400.0020.004,800.0020.004,800.0020.004,800.00
0070NS-500-00260Sawcuts in Asphalt Concrete Lifts 400     LNFT3.001,200.003.751,500.003.001,200.003.751,500.00
0071NS-500-00340Saw Cutting Asphalt Concrete Pavement 17,914     INLF2.0035,828.000.6010,748.401.0017,914.000.6010,748.40
0072NS-700-00810Impact Attenuator (Construction Zone)(Test Level 3) 2     EACH5,509.0011,018.008,000.0016,000.0010,500.0021,000.007,500.0015,000.00
             
  CONTRACTOR TOTAL   11,690,767.39 13,939,822.10 15,438,091.16 16,282,097.86