Bid Tabulations for the Letting of 6/12/2019 LA DOTD Headquarters

Proposal:H.011278.6
Parish:Livingston
Routes:I-12
Description:I-12: MEDIAN CABLE BARRIER
Type Construction:CABLE BARRIER SYSTEM AND RELATED WORK.
Estimated Construction Cost:$4,385,395.50
154896Magee Excavation & Development LLC$4,297,473.40
257931KCR CONTRACTORS, LLC$4,317,987.13
339462JB JAMES CONSTRUCTION LLC$4,438,976.00
448896Command Construction Industries LLC$4,542,546.79


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Magee Excavation & Development LLC
- 2 -
KCR CONTRACTORS, LLC
- 3 -
JB JAMES CONSTRUCTION LLC
- 4 -
Command Construction Industries LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001203-07-00100Borrow (Vehicular Measurement) 9,777     CUYD15.00146,655.0021.61211,280.975.0048,885.000.0197.77
0002204-02-00100Temporary Hay Bales 562     EACH12.006,744.0022.4112,594.4225.0014,050.0010.005,620.00
0003713-01-00100Temporary Signs and Barricades 1     LUMP169,000.00169,000.0040,250.0040,250.00275,000.00275,000.00150,000.00150,000.00
0004713-11-00100Portable Changeable Message Signs 6     EACH11,000.0066,000.005,750.0034,500.007,500.0045,000.002,500.0015,000.00
0005720-01-01000Erosion Control System (Slope Protection) (Type A) 66,352     SQYD0.5033,176.001.2079,622.400.7549,764.000.01663.52
0006721-01-00100Mowing 4     CYCL14,000.0056,000.005,750.0023,000.0024,000.0096,000.0010,000.0040,000.00
0007727-01-00100Mobilization 1     LUMP175,000.00175,000.00108,003.41108,003.41440,000.00440,000.00450,000.00450,000.00
0008739-01-00100Hydro-Seeding 27.4   ACRE2,000.0054,800.001,485.6840,707.631,000.0027,400.001,500.0041,100.00
0009740-01-00100Construction Layout 1     LUMP23,000.0023,000.005,000.005,000.0070,000.0070,000.00150,000.00150,000.00
0010NS-704-00001High Tension Cable Barrier 58,093     LNFT7.30424,078.907.69446,735.179.00522,837.008.00464,744.00
0011NS-704-00002Cable Barrier Gated End Terminal 56     EACH3,400.00190,400.001,790.36100,260.163,500.00196,000.002,500.00140,000.00
0012NS-704-00003Concrete Strip 66,351     SQYD44.502,952,619.5048.473,216,032.9740.002,654,040.0046.503,085,321.50
             
  CONTRACTOR TOTAL   4,297,473.40 4,317,987.13 4,438,976.00 4,542,546.79