Bid Tabulations for the Letting of 5/8/2019 LA DOTD Headquarters
Proposal:H.009751.6
Parish:Calcasieu
Routes:LA 14
Description:BELL CITY SCHOOL SIDEWALK
Type Construction:DRAINAGE STRUCTURES, SIDEWALK, AND RELATED WORK.
Estimated Construction Cost:$60,104.50
Rank | License | Bidder | Construction Bid |
1 | 56330 | Credence Construction LLC | $58,032.40 |
2 | 30774 | Progressive Construction Co., LLC | $58,057.40 |
3 | 36384 | JOHN BAILEY, INC. | $65,633.50 |
4 | 65305 | McCoy Group, LLC | $77,067.09 |
5 | 39001 | JD's Rebar & Construction Inc. | $77,496.32 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Credence Construction LLC | - 2 - Progressive Construction Co., LLC | - 3 - JOHN BAILEY, INC. | - 4 - McCoy Group, LLC |
Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount |
0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 8.6 | SQYD | 40.00 | 344.00 | 50.00 | 430.00 | 100.00 | 860.00 | 157.61 | 1,355.45 |
0002 | 202-02-32120 | Removal of Pipe (Side Drain) (12" Metal Pipe) | 8 | LNFT | 50.25 | 402.00 | 50.00 | 400.00 | 25.00 | 200.00 | 338.87 | 2,710.96 |
0003 | 204-02-00100 | Temporary Hay Bales | 8 | EACH | 38.50 | 308.00 | 50.00 | 400.00 | 35.00 | 280.00 | 229.89 | 1,839.12 |
0004 | 204-06-00100 | Temporary Silt Fencing | 548 | LNFT | 2.25 | 1,233.00 | 2.00 | 1,096.00 | 5.00 | 2,740.00 | 3.47 | 1,901.56 |
0005 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 24 | LNFT | 121.25 | 2,910.00 | 100.00 | 2,400.00 | 95.00 | 2,280.00 | 473.56 | 11,365.44 |
0006 | 706-01-00100 | Concrete Walk (4" Thick) | 298.3 | SQYD | 98.00 | 29,233.40 | 108.00 | 32,216.40 | 95.00 | 28,338.50 | 72.23 | 21,546.21 |
0007 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 3,500.00 | 3,500.00 | 6,000.00 | 6,000.00 | 6,500.00 | 6,500.00 | 13,410.66 | 13,410.66 |
0008 | 726-01-00100 | Bedding Material | 13 | CUYD | 134.75 | 1,751.75 | 60.00 | 780.00 | 150.00 | 1,950.00 | 183.46 | 2,384.98 |
0009 | 727-01-00100 | Mobilization | 1 | LUMP | 10,000.00 | 10,000.00 | 6,100.00 | 6,100.00 | 15,000.00 | 15,000.00 | 7,982.00 | 7,982.00 |
0010 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 69 | LNFT | 19.00 | 1,311.00 | 35.00 | 2,415.00 | 15.00 | 1,035.00 | 28.79 | 1,986.51 |
0011 | 739-01-00100 | Hydro-Seeding | 0.13 | ACRE | 17,225.00 | 2,239.25 | 14,000.00 | 1,820.00 | 20,000.00 | 2,600.00 | 16,862.03 | 2,192.06 |
0012 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,500.00 | 1,500.00 | 2,500.00 | 2,500.00 | 1,500.00 | 1,500.00 | 5,000.00 | 5,000.00 |
0013 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 80 | INLF | 8.00 | 640.00 | 5.00 | 400.00 | 10.00 | 800.00 | 3.09 | 247.20 |
0014 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 20 | INLF | 8.00 | 160.00 | 5.00 | 100.00 | 20.00 | 400.00 | 3.09 | 61.80 |
0015 | NS-700-00100 | Trench Drains to be installed in 5' wide sidewalk | 1 | EACH | 2,500.00 | 2,500.00 | 1,000.00 | 1,000.00 | 1,150.00 | 1,150.00 | 3,083.14 | 3,083.14 |
| | | | | | | | | | | | |
| | CONTRACTOR TOTAL | | | | 58,032.40 | | 58,057.40 | | 65,633.50 | | 77,067.09 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - JD's Rebar & Construction Inc. |
Unit Price | Total Amount |
0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 8.6 | SQYD | 127.22 | 1,094.09 |
0002 | 202-02-32120 | Removal of Pipe (Side Drain) (12" Metal Pipe) | 8 | LNFT | 91.18 | 729.44 |
0003 | 204-02-00100 | Temporary Hay Bales | 8 | EACH | 65.60 | 524.80 |
0004 | 204-06-00100 | Temporary Silt Fencing | 548 | LNFT | 1.18 | 646.64 |
0005 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 24 | LNFT | 107.87 | 2,588.88 |
0006 | 706-01-00100 | Concrete Walk (4" Thick) | 298.3 | SQYD | 61.54 | 18,357.38 |
0007 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,803.11 | 5,803.11 |
0008 | 726-01-00100 | Bedding Material | 13 | CUYD | 229.66 | 2,985.58 |
0009 | 727-01-00100 | Mobilization | 1 | LUMP | 29,015.54 | 29,015.54 |
0010 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 69 | LNFT | 75.44 | 5,205.36 |
0011 | 739-01-00100 | Hydro-Seeding | 0.13 | ACRE | 24,373.08 | 3,168.50 |
0012 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,481.86 | 3,481.86 |
0013 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 80 | INLF | 2.00 | 160.00 |
0014 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 20 | INLF | 18.56 | 371.20 |
0015 | NS-700-00100 | Trench Drains to be installed in 5' wide sidewalk | 1 | EACH | 3,363.94 | 3,363.94 |
| | | | | | |
| | CONTRACTOR TOTAL | | | | 77,496.32 |