Bid Tabulations for the Letting of 11/14/2018 LA DOTD Headquarters

Proposal:H.013432.6
Parish:St. Charles
Routes:I-310
Description:I-310: CONCRETE PATCH AT SB MM 9
Type Construction:MILLING ASPHALT PAVEMENT, HIGH EARLY STRENGTH CONCRETE PAVEMENT, ASPHALT CONCRETE SHOULDER, AND RELATED WORK.
Estimated Construction Cost:$239,221.50
121982Forby Contracting, Inc.$129,452.40
224901Hard Rock Construction LLC$157,911.65
338610Three C's Properties Inc., The$178,408.00
402179Boh Bros. Construction Co., LLC.$186,615.00


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Forby Contracting, Inc.
- 2 -
Hard Rock Construction LLC
- 3 -
Three C's Properties Inc., The
- 4 -
Boh Bros. Construction Co., LLC.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001502-01-00100Asphalt Concrete 5.2   TON1,550.008,060.00900.004,680.00300.001,560.001,500.007,800.00
0002509-01-00100Milling Asphalt Pavement 62.2   SQYD88.005,473.60148.009,205.6025.001,555.00100.006,220.00
0003509-02-00100Contractor Retained Reclaimed Asphalt Pavement -3     CUYD0.10-0.301.00-3.001.00-3.001.00-3.00
0004602-16-00100High Early Strength (HES) Concrete Pavement Full and Partial Depth Patching (12" Thick)240     SQYD275.0066,000.00230.0055,200.00350.0084,000.00372.0089,280.00
0005713-01-00100Temporary Signs and Barricades 1     LUMP10,000.0010,000.0018,000.0018,000.0018,000.0018,000.0014,000.0014,000.00
0006713-02-00100Temporary Pavement Markings (4" Width) 4,210     LNFT0.20842.001.004,210.000.502,105.000.20842.00
0007713-07-00100Temporary Precast Concrete Barrier (Contractor Furnished) 28     EACH150.004,200.00880.0024,640.00350.009,800.00700.0019,600.00
0008713-10-00100Temporary Precast Concrete Barrier Movement 28     EACH50.001,400.00450.0012,600.00700.0019,600.00200.005,600.00
0009713-11-00100Portable Changeable Message Signs 1     EACH1,000.001,000.001,500.001,500.001,600.001,600.002,000.002,000.00
0010724-02-00100Rumble Strips (Shoulder/Edge) 0.174 MILE400.0069.60425.0073.9530,000.005,220.0011,000.001,914.00
0011727-01-00100Mobilization 1     LUMP25,000.0025,000.0015,000.0015,000.0023,500.0023,500.0030,000.0030,000.00
0012731-02-00100Reflectorized Raised Pavement Markers 2     EACH25.0050.0022.0044.0025.0050.0029.0058.00
0013732-01-01000Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) 1,750     LNFT0.751,312.502.003,500.001.001,750.001.001,750.00
0014732-03-02101Plastic Pavement Striping (Broken Line) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black Contrast) 0.015 MILE20,000.00300.0041,000.00615.0042,000.00630.0024,000.00360.00
0015732-05-00100Removal of Existing Markings 0.949 MILE5,000.004,745.008,900.008,446.109,000.008,541.006,000.005,694.00
0016740-01-00100Construction Layout 1     LUMP1,000.001,000.00200.00200.00500.00500.001,500.001,500.00
             
  CONTRACTOR TOTAL   129,452.40 157,911.65 178,408.00 186,615.00