Proposal:H.011363.6
Parish:East Baton Rouge
Description:SHERWOOD (AIRLINE HWY TO OLD HAMMOND)
Type Construction:MILLING ASPHALT CONCRETE, ASPHALT CONCRETE OVERLAY, CONCRETE PAVEMENT PATCHING, TRAFFIC SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$3,336,360.84
| Rank | License | Bidder | Construction Bid |
| 1 | 21982 | Forby Contracting, Inc. | $2,781,390.36 |
| 2 | 24901 | Hard Rock Construction LLC | $2,941,352.13 |
| 3 | 48896 | Command Construction Industries LLC | $3,182,562.34 |
| 4 | 00046 | Barber Bros. Contracting Co., L.L.C | $3,256,202.65 |
| 5 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $3,537,154.84 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Forby Contracting, Inc. | - 2 - Hard Rock Construction LLC | - 3 - Command Construction Industries LLC | - 4 - Barber Bros. Contracting Co., L.L.C | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 2,100 | SQYD | 15.00 | 31,500.00 | 12.00 | 25,200.00 | 15.00 | 31,500.00 | 14.00 | 29,400.00 | | 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 1,320 | LNFT | 5.00 | 6,600.00 | 7.00 | 9,240.00 | 5.00 | 6,600.00 | 10.00 | 13,200.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 100 | CUYD | 30.00 | 3,000.00 | 25.00 | 2,500.00 | 25.00 | 2,500.00 | 55.00 | 5,500.00 | | 0004 | 502-01-00100 | Asphalt Concrete | 9,371 | TON | 85.50 | 801,220.50 | 95.00 | 890,245.00 | 90.00 | 843,390.00 | 94.00 | 880,874.00 | | 0005 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 263.9 | TON | 145.00 | 38,265.50 | 158.00 | 41,696.20 | 200.00 | 52,780.00 | 140.00 | 36,946.00 | | 0006 | 509-01-00100 | Milling Asphalt Pavement | 87,590 | SQYD | 2.25 | 197,077.50 | 2.50 | 218,975.00 | 1.50 | 131,385.00 | 2.00 | 175,180.00 | | 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -4,866 | CUYD | 25.50 | -124,083.00 | 32.00 | -155,712.00 | 0.01 | -48.66 | 0.00 | 0.00 | | 0008 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 90,000 | LNFT | 2.00 | 180,000.00 | 1.75 | 157,500.00 | 1.75 | 157,500.00 | 2.00 | 180,000.00 | | 0009 | 602-03-00100 | Cleaning and Sealing Random cracks | 2,500 | LNFT | 3.00 | 7,500.00 | 3.50 | 8,750.00 | 5.00 | 12,500.00 | 3.00 | 7,500.00 | | 0010 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 1,012 | SQYD | 165.00 | 166,980.00 | 138.00 | 139,656.00 | 250.00 | 253,000.00 | 170.00 | 172,040.00 | | 0011 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 1,552 | SQYD | 145.00 | 225,040.00 | 138.00 | 214,176.00 | 150.00 | 232,800.00 | 160.00 | 248,320.00 | | 0012 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 2,757 | SQYD | 125.00 | 344,625.00 | 138.00 | 380,466.00 | 100.00 | 275,700.00 | 150.00 | 413,550.00 | | 0013 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 10 | EACH | 130.00 | 1,300.00 | 250.00 | 2,500.00 | 250.00 | 2,500.00 | 250.00 | 2,500.00 | | 0014 | 702-04-00200 | Adjusting Catch Basins | 5 | EACH | 1,000.00 | 5,000.00 | 4,200.00 | 21,000.00 | 550.00 | 2,750.00 | 3,000.00 | 15,000.00 | | 0015 | 706-01-00100 | Concrete Walk (4" Thick) | 1,500 | SQYD | 65.00 | 97,500.00 | 92.00 | 138,000.00 | 75.00 | 112,500.00 | 60.00 | 90,000.00 | | 0016 | 706-02-00200 | Concrete Drive (6" Thick) | 600 | SQYD | 75.00 | 45,000.00 | 77.00 | 46,200.00 | 95.00 | 57,000.00 | 75.00 | 45,000.00 | | 0017 | 706-04-00100 | Handicapped Curb Ramps | 40 | EACH | 2,000.00 | 80,000.00 | 1,248.00 | 49,920.00 | 1,200.00 | 48,000.00 | 2,000.00 | 80,000.00 | | 0018 | 707-01-00100 | Concrete Curb | 5,280 | LNFT | 15.00 | 79,200.00 | 12.00 | 63,360.00 | 30.00 | 158,400.00 | 20.00 | 105,600.00 | | 0019 | 710-01-00100 | Flowable Fill | 20 | CUYD | 150.00 | 3,000.00 | 280.00 | 5,600.00 | 150.00 | 3,000.00 | 350.00 | 7,000.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 75,400.00 | 75,400.00 | 1,000.00 | 1,000.00 | 70,000.00 | 70,000.00 | | 0021 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 13,600 | LNFT | 0.05 | 680.00 | 1.00 | 13,600.00 | 0.10 | 1,360.00 | 0.05 | 680.00 | | 0022 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,424 | LNFT | 0.50 | 712.00 | 2.50 | 3,560.00 | 0.75 | 1,068.00 | 0.50 | 712.00 | | 0023 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 12.78 | MILE | 350.00 | 4,473.00 | 380.00 | 4,856.40 | 75.00 | 958.50 | 350.00 | 4,473.00 | | 0024 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 12.78 | MILE | 75.00 | 958.50 | 407.00 | 5,201.46 | 75.00 | 958.50 | 75.00 | 958.50 | | 0025 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 21.595 | MILE | 100.00 | 2,159.50 | 706.00 | 15,246.07 | 100.00 | 2,159.50 | 100.00 | 2,159.50 | | 0026 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 188 | EACH | 5.00 | 940.00 | 38.00 | 7,144.00 | 5.00 | 940.00 | 5.00 | 940.00 | | 0027 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 100 | EACH | 5.00 | 500.00 | 49.00 | 4,900.00 | 5.00 | 500.00 | 5.00 | 500.00 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 140,000.00 | 140,000.00 | 157,000.00 | 157,000.00 | 300,000.00 | 300,000.00 | 220,000.00 | 220,000.00 | | 0029 | 731-02-00100 | Reflectorized Raised Pavement Markers | 4,866 | EACH | 5.50 | 26,763.00 | 5.00 | 24,330.00 | 7.00 | 34,062.00 | 6.00 | 29,196.00 | | 0030 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 712 | LNFT | 7.00 | 4,984.00 | 6.50 | 4,628.00 | 7.00 | 4,984.00 | 7.50 | 5,340.00 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.797 | MILE | 3,000.00 | 32,391.00 | 2,900.00 | 31,311.30 | 3,500.00 | 37,789.50 | 3,200.00 | 34,550.40 | | 0032 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 1.284 | MILE | 6,000.00 | 7,704.00 | 4,500.00 | 5,778.00 | 6,500.00 | 8,346.00 | 6,500.00 | 8,346.00 | | 0033 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 6.39 | MILE | 1,000.00 | 6,390.00 | 980.00 | 6,262.20 | 1,500.00 | 9,585.00 | 1,100.00 | 7,029.00 | | 0034 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 220.00 | 440.00 | 163.00 | 326.00 | 250.00 | 500.00 | 240.00 | 480.00 | | 0035 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 86 | EACH | 220.00 | 18,920.00 | 163.00 | 14,018.00 | 250.00 | 21,500.00 | 240.00 | 20,640.00 | | 0036 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 6 | EACH | 220.00 | 1,320.00 | 163.00 | 978.00 | 250.00 | 1,500.00 | 240.00 | 1,440.00 | | 0037 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 50 | EACH | 240.00 | 12,000.00 | 190.00 | 9,500.00 | 250.00 | 12,500.00 | 260.00 | 13,000.00 | | 0038 | 736-09-00100 | Loop Detector | 3,900 | LNFT | 14.95 | 58,305.00 | 16.00 | 62,400.00 | 25.00 | 97,500.00 | 16.00 | 62,400.00 | | 0039 | 736-10-00200 | Underground Junction Box (Type E) | 6 | EACH | 482.31 | 2,893.86 | 525.00 | 3,150.00 | 1,000.00 | 6,000.00 | 500.00 | 3,000.00 | | 0040 | 737-04-00001 | Painted Curbs and Islands | 88 | SQYD | 22.00 | 1,936.00 | 16.00 | 1,408.00 | 25.00 | 2,200.00 | 24.00 | 2,112.00 | | 0041 | 737-05-00001 | Painted Curbs and Islands | 4,965 | LNFT | 3.00 | 14,895.00 | 0.50 | 2,482.50 | 3.00 | 14,895.00 | 3.25 | 16,136.25 | | 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 9,100.00 | 9,100.00 | 1,000.00 | 1,000.00 | 12,000.00 | 12,000.00 | | 0043 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 50,000 | LNFT | 1.15 | 57,500.00 | 1.50 | 75,000.00 | 1.75 | 87,500.00 | 1.75 | 87,500.00 | | 0044 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 40,000 | LNFT | 1.25 | 50,000.00 | 1.50 | 60,000.00 | 1.75 | 70,000.00 | 1.75 | 70,000.00 | | 0045 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 90,000 | LNFT | 1.05 | 94,500.00 | 0.80 | 72,000.00 | 0.75 | 67,500.00 | 0.75 | 67,500.00 | | 0046 | NS-602-00001 | Milling Concrete Pavement | 500 | SQYD | 22.60 | 11,300.00 | 25.00 | 12,500.00 | 25.00 | 12,500.00 | 15.00 | 7,500.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,781,390.36 | | 2,941,352.13 | | 3,182,562.34 | | 3,256,202.65 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - KORT's CONSTRUCTION SERVICES, INC. | | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 2,100 | SQYD | 24.00 | 50,400.00 | | 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 1,320 | LNFT | 16.00 | 21,120.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 100 | CUYD | 35.00 | 3,500.00 | | 0004 | 502-01-00100 | Asphalt Concrete | 9,371 | TON | 99.00 | 927,729.00 | | 0005 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 263.9 | TON | 255.00 | 67,294.50 | | 0006 | 509-01-00100 | Milling Asphalt Pavement | 87,590 | SQYD | 1.25 | 109,487.50 | | 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -4,866 | CUYD | 0.01 | -48.66 | | 0008 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 90,000 | LNFT | 2.50 | 225,000.00 | | 0009 | 602-03-00100 | Cleaning and Sealing Random cracks | 2,500 | LNFT | 3.50 | 8,750.00 | | 0010 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 1,012 | SQYD | 165.00 | 166,980.00 | | 0011 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 1,552 | SQYD | 155.00 | 240,560.00 | | 0012 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 2,757 | SQYD | 150.00 | 413,550.00 | | 0013 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 10 | EACH | 350.00 | 3,500.00 | | 0014 | 702-04-00200 | Adjusting Catch Basins | 5 | EACH | 1,500.00 | 7,500.00 | | 0015 | 706-01-00100 | Concrete Walk (4" Thick) | 1,500 | SQYD | 55.00 | 82,500.00 | | 0016 | 706-02-00200 | Concrete Drive (6" Thick) | 600 | SQYD | 65.00 | 39,000.00 | | 0017 | 706-04-00100 | Handicapped Curb Ramps | 40 | EACH | 1,800.00 | 72,000.00 | | 0018 | 707-01-00100 | Concrete Curb | 5,280 | LNFT | 19.00 | 100,320.00 | | 0019 | 710-01-00100 | Flowable Fill | 20 | CUYD | 200.00 | 4,000.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 200,000.00 | 200,000.00 | | 0021 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 13,600 | LNFT | 0.06 | 816.00 | | 0022 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,424 | LNFT | 0.65 | 925.60 | | 0023 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 12.78 | MILE | 95.00 | 1,214.10 | | 0024 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 12.78 | MILE | 95.00 | 1,214.10 | | 0025 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 21.595 | MILE | 125.00 | 2,699.38 | | 0026 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 188 | EACH | 6.50 | 1,222.00 | | 0027 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 100 | EACH | 6.50 | 650.00 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 300,000.00 | 300,000.00 | | 0029 | 731-02-00100 | Reflectorized Raised Pavement Markers | 4,866 | EACH | 5.80 | 28,222.80 | | 0030 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 712 | LNFT | 7.35 | 5,233.20 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.797 | MILE | 3,150.00 | 34,010.55 | | 0032 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 1.284 | MILE | 6,280.00 | 8,063.52 | | 0033 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 6.39 | MILE | 1,050.00 | 6,709.50 | | 0034 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 235.00 | 470.00 | | 0035 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 86 | EACH | 235.00 | 20,210.00 | | 0036 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 6 | EACH | 235.00 | 1,410.00 | | 0037 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 50 | EACH | 255.00 | 12,750.00 | | 0038 | 736-09-00100 | Loop Detector | 3,900 | LNFT | 17.00 | 66,300.00 | | 0039 | 736-10-00200 | Underground Junction Box (Type E) | 6 | EACH | 510.00 | 3,060.00 | | 0040 | 737-04-00001 | Painted Curbs and Islands | 88 | SQYD | 27.75 | 2,442.00 | | 0041 | 737-05-00001 | Painted Curbs and Islands | 4,965 | LNFT | 3.15 | 15,639.75 | | 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | | 0043 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 50,000 | LNFT | 1.25 | 62,500.00 | | 0044 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 40,000 | LNFT | 1.50 | 60,000.00 | | 0045 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 90,000 | LNFT | 1.25 | 112,500.00 | | 0046 | NS-602-00001 | Milling Concrete Pavement | 500 | SQYD | 31.50 | 15,750.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,537,154.84 |
|