Proposal:H.000506.6
Parish:St. Tammany
Routes:LA 22
Description:LA 22 (DALWILL DR - US 190)
Type Construction:GRADING, REMOVAL OF SURFACING AND STABILIZED BASE, CLASS II BASE COURSE, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE DRIVES, AND RELATED WORK.
Estimated Construction Cost:$4,549,791.59
Rank | License | Bidder | Construction Bid |
1 | 54896 | Magee Excavation & Development LLC | $2,585,000.00 |
2 | 06276 | Barriere Construction Co., LLC | $2,737,042.48 |
3 | 12487 | Diamond B Construction Co., L.L.C. | $5,213,027.98 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Magee Excavation & Development LLC | - 2 - Barriere Construction Co., LLC | - 3 - Diamond B Construction Co., L.L.C. | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,093.5 | SQYD | 10.00 | 10,935.00 | 15.00 | 16,402.50 | 42.50 | 46,473.75 | 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 853 | LNFT | 3.00 | 2,559.00 | 8.00 | 6,824.00 | 44.50 | 37,958.50 | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 30" EQ. CMPA CROSS DRAIN STA 28+33 | 69 | LNFT | 4.00 | 276.00 | 25.00 | 1,725.00 | 17.50 | 1,207.50 | 0004 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 16,608.5 | SQYD | 15.00 | 249,127.50 | 15.00 | 249,127.50 | 29.65 | 492,442.03 | 0005 | 202-03-38000 | Relocation of Sign SIGNS TO BE MOVED FOR CONSTRUCTION THEN REPLACED UPON COMPLETION. | 5 | EACH | 223.00 | 1,115.00 | 300.00 | 1,500.00 | 1,900.00 | 9,500.00 | 0006 | 203-01-00100 | General Excavation | 16,469 | CUYD | 20.00 | 329,380.00 | 8.00 | 131,752.00 | 23.50 | 387,021.50 | 0007 | 203-04-00200 | Nonplastic Embankment (Sand) | 12,557.1 | CUYD | 15.00 | 188,356.50 | 15.00 | 188,356.50 | 45.00 | 565,069.50 | 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 500 | CUYD | 10.50 | 5,250.00 | 25.00 | 12,500.00 | 45.00 | 22,500.00 | 0009 | 203-08-00100 | Geotextile Fabric | 20,347.9 | SQYD | 1.00 | 20,347.90 | 1.00 | 20,347.90 | 1.25 | 25,434.88 | 0010 | 204-02-00100 | Temporary Hay Bales | 8 | EACH | 10.00 | 80.00 | 25.00 | 200.00 | 59.00 | 472.00 | 0011 | 204-06-00100 | Temporary Silt Fencing | 5,752 | LNFT | 1.00 | 5,752.00 | 2.00 | 11,504.00 | 2.25 | 12,942.00 | 0012 | 302-02-10000 | Class II Base Course (10" Thick) | 19,069.7 | SQYD | 16.00 | 305,115.20 | 25.00 | 476,742.50 | 69.25 | 1,320,576.73 | 0013 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 52.6 | SQYD | 11.25 | 591.75 | 60.00 | 3,156.00 | 242.00 | 12,729.20 | 0014 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 2,500 | CUYD | 43.75 | 109,375.00 | 1.00 | 2,500.00 | 78.00 | 195,000.00 | 0015 | 502-01-00100 | Asphalt Concrete | 9,081.5 | TON | 99.00 | 899,068.50 | 89.00 | 808,253.50 | 126.00 | 1,144,269.00 | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 24.3 | TON | 220.00 | 5,346.00 | 200.00 | 4,860.00 | 530.00 | 12,879.00 | 0017 | 509-01-00100 | Milling Asphalt Pavement | 2,379.2 | SQYD | 3.10 | 7,375.52 | 2.75 | 6,542.80 | 9.35 | 22,245.52 | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -132 | CUYD | 0.01 | -1.32 | 1.00 | -132.00 | 1.00 | -132.00 | 0019 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 69 | LNFT | 116.00 | 8,004.00 | 200.00 | 13,800.00 | 350.00 | 24,150.00 | 0020 | 701-15-00100 | Concrete Collar | 2 | EACH | 550.00 | 1,100.00 | 1,500.00 | 3,000.00 | 3,200.00 | 6,400.00 | 0021 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 4,020.00 | 4,020.00 | 3,500.00 | 3,500.00 | 14,000.00 | 14,000.00 | 0022 | 706-02-00200 | Concrete Drive (6" Thick) | 837.5 | SQYD | 57.00 | 47,737.50 | 70.00 | 58,625.00 | 120.00 | 100,500.00 | 0023 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 120 | SQYD | 53.00 | 6,360.00 | 50.00 | 6,000.00 | 170.00 | 20,400.00 | 0024 | 707-03-00100 | Combination Concrete Curb and Gutter | 3,192 | LNFT | 14.00 | 44,688.00 | 35.00 | 111,720.00 | 53.00 | 169,176.00 | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,933.22 | 30,933.22 | 120,000.00 | 120,000.00 | 38,500.00 | 38,500.00 | 0026 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 3,760 | LNFT | 0.39 | 1,466.40 | 0.58 | 2,180.80 | 0.40 | 1,504.00 | 0027 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 222 | LNFT | 1.23 | 273.06 | 1.16 | 257.52 | 1.00 | 222.00 | 0028 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 2.669 | MILE | 390.00 | 1,040.91 | 115.57 | 308.46 | 154.00 | 411.03 | 0029 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 8.908 | MILE | 725.75 | 6,464.98 | 115.57 | 1,029.50 | 1.00 | 8.91 | 0030 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 66 | EACH | 36.85 | 2,432.10 | 15.00 | 990.00 | 25.00 | 1,650.00 | 0031 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 1 | EACH | 50.00 | 50.00 | 30.00 | 30.00 | 60.00 | 60.00 | 0032 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 2 | EACH | 50.00 | 100.00 | 30.00 | 60.00 | 50.00 | 100.00 | 0033 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 156 | EACH | 4.50 | 702.00 | 3.00 | 468.00 | 7.00 | 1,092.00 | 0034 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 4,800.00 | 19,200.00 | 6,000.00 | 24,000.00 | 4,000.00 | 16,000.00 | 0035 | 726-01-00100 | Bedding Material | 18.3 | CUYD | 103.50 | 1,894.05 | 100.00 | 1,830.00 | 130.00 | 2,379.00 | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 72,783.00 | 72,783.00 | 270,000.00 | 270,000.00 | 250,000.00 | 250,000.00 | 0037 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 25 | SQFT | 33.50 | 837.50 | 30.00 | 750.00 | 35.00 | 875.00 | 0038 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 4 | EACH | 500.00 | 2,000.00 | 600.00 | 2,400.00 | 525.00 | 2,100.00 | 0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | 580 | EACH | 6.20 | 3,596.00 | 7.00 | 4,060.00 | 6.50 | 3,770.00 | 0040 | 732-01-02000 | Plastic Pavement Striping (4" Width) (Thermoplastic 125 mil) | 6,766 | LNFT | 0.90 | 6,089.40 | 0.70 | 4,736.20 | 0.75 | 5,074.50 | 0041 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 795 | LNFT | 2.23 | 1,772.85 | 2.50 | 1,987.50 | 2.15 | 1,709.25 | 0042 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 306 | LNFT | 6.70 | 2,050.20 | 9.00 | 2,754.00 | 10.00 | 3,060.00 | 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.471 | MILE | 3,182.00 | 4,680.72 | 3,200.00 | 4,707.20 | 3,500.00 | 5,148.50 | 0044 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.969 | MILE | 1,116.00 | 1,081.40 | 1,200.00 | 1,162.80 | 975.00 | 944.78 | 0045 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.072 | MILE | 3,350.00 | 241.20 | 4,200.00 | 302.40 | 2,150.00 | 154.80 | 0046 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.131 | MILE | 4,700.00 | 615.70 | 6,200.00 | 812.20 | 3,450.00 | 451.95 | 0047 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 280.00 | 280.00 | 350.00 | 350.00 | 325.00 | 325.00 | 0048 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 18 | EACH | 185.00 | 3,330.00 | 240.00 | 4,320.00 | 255.00 | 4,590.00 | 0049 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 185.00 | 555.00 | 240.00 | 720.00 | 290.00 | 870.00 | 0050 | 732-05-00100 | Removal of Existing Markings | 0.847 | MILE | 5,895.00 | 4,993.07 | 6,000.00 | 5,082.00 | 5,750.00 | 4,870.25 | 0051 | 736-16-00000 | Temporary Traffic Signal Installation (Intersection) | 1 | EACH | 38,500.00 | 38,500.00 | 90,000.00 | 90,000.00 | 45,000.00 | 45,000.00 | 0052 | 739-01-00100 | Hydro-Seeding | 0.4 | ACRE | 5,582.00 | 2,232.80 | 5,000.00 | 2,000.00 | 7,255.00 | 2,902.00 | 0053 | 740-01-00100 | Construction Layout | 1 | LUMP | 19,991.39 | 19,991.39 | 37,000.00 | 37,000.00 | 14,500.00 | 14,500.00 | 0054 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) STA 28+36 | 2 | EACH | 1,400.00 | 2,800.00 | 3,000.00 | 6,000.00 | 5,300.00 | 10,600.00 | 0055 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 84,374 | INLF | 1.00 | 84,374.00 | 0.05 | 4,218.70 | 1.35 | 113,904.90 | 0056 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 12,180 | INLF | 1.00 | 12,180.00 | 0.10 | 1,218.00 | 2.00 | 24,360.00 | 0057 | NS-MSC-00120 | Drainage Structure TYPE 1 - PAVED GUTTER DRAIN | 1 | EACH | 3,500.00 | 3,500.00 | 2,500.00 | 2,500.00 | 12,675.00 | 12,675.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,585,000.00 | | 2,737,042.48 | | 5,213,027.98 |
|