Bid Tabulations for the Letting of 6/13/2018 LA DOTD Headquarters

Proposal:H.012377.6
Parish:Lafourche, Terrebonne
Routes:US 90
Description:US 90: MEDIAN CABLE BARRIER
Type Construction:GRADING, HIGH TENSION CABLE BARRIER, CONCRETE STRIP, AND RELATED WORK.
Estimated Construction Cost:$3,647,664.50
148896Command Construction Industries LLC$3,623,662.00
212198Byron E. Talbot Contractor, Inc.$3,874,599.05
330774Progressive Construction Co., LLC$4,148,575.50
443371Rmd Holdings LTD$4,430,255.29
539462JB JAMES CONSTRUCTION LLC$4,796,633.70


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Command Construction Industries LLC
- 2 -
Byron E. Talbot Contractor, Inc.
- 3 -
Progressive Construction Co., LLC
- 4 -
Rmd Holdings LTD
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-02-38300Removal of Sign and U-Channel Post 14     EACH100.001,400.00110.001,540.0025.00350.00111.111,555.54
0002202-03-38000Relocation of Sign (TYPE A)2     EACH100.00200.0030.0060.00100.00200.0027.7855.56
0003202-03-38020Relocation of Sign Pole (TYPE A)2     EACH100.00200.0082.50165.00100.00200.00166.67333.34
0004203-05-00100Excavation and Embankment 1     LUMP10,000.0010,000.00170,000.00170,000.0050,000.0050,000.0022,222.2222,222.22
0005203-07-00100Borrow (Vehicular Measurement) 5,575     CUYD10.0055,750.0015.6587,248.7520.00111,500.0061.39342,249.25
0006204-06-00100Temporary Silt Fencing 105,879     LNFT0.011,058.791.45153,524.551.20127,054.801.11117,525.69
0007401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 21     CUYD200.004,200.00150.003,150.00100.002,100.00388.898,166.69
0008713-01-00100Temporary Signs and Barricades 1     LUMP150,000.00150,000.00120,000.00120,000.00250,000.00250,000.00309,800.00309,800.00
0009727-01-00100Mobilization 1     LUMP350,264.71350,264.7171,000.0071,000.00296,000.00296,000.00354,244.44354,244.44
0010739-01-00100Hydro-Seeding 59.9   ACRE100.005,990.001,300.0077,870.001,200.0071,880.003,194.44191,346.96
0011740-01-00100Construction Layout 1     LUMP150,000.00150,000.0040,000.0040,000.00100,000.00100,000.0022,222.2222,222.22
0012NS-704-00001High Tension Cable Barrier 105,879     LNFT6.50688,213.508.75926,441.258.10857,619.908.46895,736.34
0013NS-704-00002Cable Barrier Gated End Terminal 52     EACH1,000.0052,000.004,500.00234,000.003,600.00187,200.003,832.78199,304.56
0014NS-704-00003Concrete Strip 47,653     SQYD45.002,144,385.0041.501,977,599.5043.602,077,670.8041.201,963,303.60
0015NS-713-00009Portable Changeable Message Sign (with communications) 2     EACH5,000.0010,000.006,000.0012,000.008,400.0016,800.001,094.442,188.88
             
  CONTRACTOR TOTAL   3,623,662.00 3,874,599.05 4,148,575.50 4,430,255.29



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
JB JAMES CONSTRUCTION LLC
Unit PriceTotal
Amount
0001202-02-38300Removal of Sign and U-Channel Post 14     EACH250.003,500.00
0002202-03-38000Relocation of Sign (TYPE A)2     EACH1,200.002,400.00
0003202-03-38020Relocation of Sign Pole (TYPE A)2     EACH1,200.002,400.00
0004203-05-00100Excavation and Embankment 1     LUMP300,000.00300,000.00
0005203-07-00100Borrow (Vehicular Measurement) 5,575     CUYD25.00139,375.00
0006204-06-00100Temporary Silt Fencing 105,879     LNFT2.80296,461.20
0007401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 21     CUYD200.004,200.00
0008713-01-00100Temporary Signs and Barricades 1     LUMP200,000.00200,000.00
0009727-01-00100Mobilization 1     LUMP460,000.00460,000.00
0010739-01-00100Hydro-Seeding 59.9   ACRE3,000.00179,700.00
0011740-01-00100Construction Layout 1     LUMP60,000.0060,000.00
0012NS-704-00001High Tension Cable Barrier 105,879     LNFT8.50899,971.50
0013NS-704-00002Cable Barrier Gated End Terminal 52     EACH3,600.00187,200.00
0014NS-704-00003Concrete Strip 47,653     SQYD42.002,001,426.00
0015NS-713-00009Portable Changeable Message Sign (with communications) 2     EACH30,000.0060,000.00
       
  CONTRACTOR TOTAL   4,796,633.70