Proposal:H.013071.6
Parish:Livingston
Description:N. RIVER ROAD - BRIDGE REPLACEMENT
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, DRAINAGE STRUCTURES, ASPHALT CONCRETE PAVEMENT, CLASS II BASE COURSE, PRECAST REINFORCED CONCRETE BOX CULVERTS, AND RELATED WORK.
Estimated Construction Cost:$190,145.10
| Rank | License | Bidder | Construction Bid |
| 1 | 12198 | Byron E. Talbot Contractor, Inc. | $202,848.63 |
| 2 | 14807 | Richard Price Contracting Co, Llc | $206,355.25 |
| 3 | 57931 | KCR CONTRACTORS, LLC | $210,627.06 |
| 4 | 55505 | MERRICK, LLC | $226,341.04 |
| 5 | 38466 | Gulf States Contractors LLC | $232,434.50 |
| 6 | 02109 | Chambers Construction Co, Inc. | $238,285.00 |
| 7 | 12487 | Diamond B Construction Co., L.L.C. | $256,555.30 |
| 8 | 48896 | Command Construction Industries LLC | $257,532.76 |
| 9 | 08503 | RIVER/ROAD CONSTRUCTION, INC. | $294,855.00 |
| 10 | 05693 | Industrial Enterprises, Inc. | $320,359.45 |
| 11 | 35629 | Mack's Trucking of Independence LLC | $344,614.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Byron E. Talbot Contractor, Inc. | - 2 - Richard Price Contracting Co, Llc | - 3 - KCR CONTRACTORS, LLC | - 4 - MERRICK, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 5,500.00 | 5,500.00 | 2,500.00 | 2,500.00 | 5,375.97 | 5,375.97 | 10,000.00 | 10,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 9,500.00 | 9,500.00 | 3,000.00 | 3,000.00 | 1,725.00 | 1,725.00 | 1,000.00 | 1,000.00 | | 0003 | 202-02-04500 | Removal of Bridge Sta 10+64 | 530 | SQFT | 22.65 | 12,004.50 | 11.50 | 6,095.00 | 13.94 | 7,388.20 | 4.50 | 2,385.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 79.4 | LNFT | 12.75 | 1,012.35 | 55.00 | 4,367.00 | 5.79 | 459.73 | 10.00 | 794.00 | | 0005 | 202-02-32120 | Removal of Pipe (Side Drain) 18" CMP | 24 | LNFT | 40.00 | 960.00 | 24.00 | 576.00 | 9.20 | 220.80 | 25.00 | 600.00 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 230.3 | SQYD | 5.25 | 1,209.08 | 7.50 | 1,727.25 | 8.63 | 1,987.49 | 6.00 | 1,381.80 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 8,500.00 | 8,500.00 | 17,000.00 | 17,000.00 | 14,660.00 | 14,660.00 | 12,000.00 | 12,000.00 | | 0008 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 2 | EACH | 600.00 | 1,200.00 | 815.00 | 1,630.00 | 575.00 | 1,150.00 | 700.00 | 1,400.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 176 | LNFT | 10.60 | 1,865.60 | 4.00 | 704.00 | 10.29 | 1,811.04 | 1.69 | 297.44 | | 0010 | 302-02-12000 | Class II Base Course (12" Thick) | 302.2 | SQYD | 38.00 | 11,483.60 | 40.00 | 12,088.00 | 66.24 | 20,017.73 | 38.00 | 11,483.60 | | 0011 | 502-01-00100 | Asphalt Concrete | 55.6 | TON | 300.00 | 16,680.00 | 385.00 | 21,406.00 | 279.37 | 15,532.97 | 325.00 | 18,070.00 | | 0012 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 20 | LNFT | 100.00 | 2,000.00 | 66.00 | 1,320.00 | 63.25 | 1,265.00 | 90.00 | 1,800.00 | | 0013 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 80 | LNFT | 22.15 | 1,772.00 | 200.00 | 16,000.00 | 14.38 | 1,150.40 | 15.00 | 1,200.00 | | 0014 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 3,100.00 | 3,100.00 | 3,250.00 | 3,250.00 | 2,760.00 | 2,760.00 | 2,500.00 | 2,500.00 | | 0015 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 47 | SQYD | 110.00 | 5,170.00 | 81.00 | 3,807.00 | 74.02 | 3,478.94 | 100.00 | 4,700.00 | | 0016 | 711-04-00100 | Geotextile Fabric | 47 | SQYD | 5.00 | 235.00 | 12.00 | 564.00 | 2.00 | 94.00 | 2.00 | 94.00 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 3,000.00 | 3,000.00 | 12,000.00 | 12,000.00 | 4,170.00 | 4,170.00 | 15,000.00 | 15,000.00 | | 0018 | 726-01-00100 | Bedding Material | 49 | CUYD | 86.00 | 4,214.00 | 41.00 | 2,009.00 | 91.51 | 4,483.99 | 110.00 | 5,390.00 | | 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 11,500.00 | 11,500.00 | 12,000.00 | 12,000.00 | 13,200.00 | 13,200.00 | 20,000.00 | 20,000.00 | | 0020 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 170.00 | 680.00 | 102.00 | 408.00 | 115.00 | 460.00 | 140.00 | 560.00 | | 0021 | 739-01-00100 | Hydro-Seeding | 0.03 | ACRE | 55,000.00 | 1,650.00 | 100,000.00 | 3,000.00 | 51,750.00 | 1,552.50 | 20,000.00 | 600.00 | | 0022 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,000.00 | 4,000.00 | 7,000.00 | 7,000.00 | 7,935.00 | 7,935.00 | 15,000.00 | 15,000.00 | | 0023 | 805-15-00800 | Reinforced Concrete Box Culverts (Precast) (7' x 5') (ASTM C1577) | 80 | LNFT | 701.00 | 56,080.00 | 585.00 | 46,800.00 | 938.23 | 75,058.40 | 650.00 | 52,000.00 | | 0024 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Headwall | 2 | EACH | 19,500.00 | 39,000.00 | 12,700.00 | 25,400.00 | 12,100.00 | 24,200.00 | 24,000.00 | 48,000.00 | | 0025 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 426 | INLF | 1.25 | 532.50 | 4.00 | 1,704.00 | 1.15 | 489.90 | 0.20 | 85.20 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 202,848.63 | | 206,355.25 | | 210,627.06 | | 226,341.04 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Gulf States Contractors LLC | - 6 - Chambers Construction Co, Inc. | - 7 - Diamond B Construction Co., L.L.C. | - 8 - Command Construction Industries LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 7,500.00 | 7,500.00 | 5,607.60 | 5,607.60 | 6,000.00 | 6,000.00 | 25,000.00 | 25,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 3,500.00 | 3,500.00 | 4,094.10 | 4,094.10 | 5,000.00 | 5,000.00 | 1.00 | 1.00 | | 0003 | 202-02-04500 | Removal of Bridge Sta 10+64 | 530 | SQFT | 20.00 | 10,600.00 | 11.52 | 6,105.60 | 15.00 | 7,950.00 | 50.00 | 26,500.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 79.4 | LNFT | 10.00 | 794.00 | 11.90 | 944.86 | 15.00 | 1,191.00 | 25.00 | 1,985.00 | | 0005 | 202-02-32120 | Removal of Pipe (Side Drain) 18" CMP | 24 | LNFT | 7.00 | 168.00 | 55.20 | 1,324.80 | 20.00 | 480.00 | 25.00 | 600.00 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 230.3 | SQYD | 15.00 | 3,454.50 | 21.30 | 4,905.39 | 18.00 | 4,145.40 | 25.00 | 5,757.50 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 15,000.00 | 15,000.00 | 19,822.80 | 19,822.80 | 15,000.00 | 15,000.00 | 1,000.00 | 1,000.00 | | 0008 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 2 | EACH | 750.00 | 1,500.00 | 491.80 | 983.60 | 750.00 | 1,500.00 | 100.00 | 200.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 176 | LNFT | 2.50 | 440.00 | 4.80 | 844.80 | 4.00 | 704.00 | 5.00 | 880.00 | | 0010 | 302-02-12000 | Class II Base Course (12" Thick) | 302.2 | SQYD | 40.00 | 12,088.00 | 42.41 | 12,816.30 | 52.00 | 15,714.40 | 50.00 | 15,110.00 | | 0011 | 502-01-00100 | Asphalt Concrete | 55.6 | TON | 320.00 | 17,792.00 | 424.00 | 23,574.40 | 240.00 | 13,344.00 | 300.00 | 16,680.00 | | 0012 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 20 | LNFT | 100.00 | 2,000.00 | 148.00 | 2,960.00 | 120.00 | 2,400.00 | 100.00 | 2,000.00 | | 0013 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 80 | LNFT | 1.00 | 80.00 | 19.00 | 1,520.00 | 1.00 | 80.00 | 1.00 | 80.00 | | 0014 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 3,200.00 | 3,200.00 | 3,275.90 | 3,275.90 | 4,000.00 | 4,000.00 | 3,000.00 | 3,000.00 | | 0015 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 47 | SQYD | 100.00 | 4,700.00 | 66.70 | 3,134.90 | 120.00 | 5,640.00 | 100.00 | 4,700.00 | | 0016 | 711-04-00100 | Geotextile Fabric | 47 | SQYD | 4.00 | 188.00 | 20.60 | 968.20 | 2.00 | 94.00 | 5.00 | 235.00 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 10,616.80 | 10,616.80 | 9,400.00 | 9,400.00 | 1,000.00 | 1,000.00 | | 0018 | 726-01-00100 | Bedding Material | 49 | CUYD | 75.00 | 3,675.00 | 113.90 | 5,581.10 | 130.00 | 6,370.00 | 100.00 | 4,900.00 | | 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 15,000.00 | 15,000.00 | 22,984.97 | 22,984.97 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | | 0020 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 85.00 | 340.00 | 127.20 | 508.80 | 90.00 | 360.00 | 100.00 | 400.00 | | 0021 | 739-01-00100 | Hydro-Seeding | 0.03 | ACRE | 45,000.00 | 1,350.00 | 57,233.40 | 1,717.00 | 55,000.00 | 1,650.00 | 50,000.00 | 1,500.00 | | 0022 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 4,451.50 | 4,451.50 | 3,000.00 | 3,000.00 | 1,000.00 | 1,000.00 | | 0023 | 805-15-00800 | Reinforced Concrete Box Culverts (Precast) (7' x 5') (ASTM C1577) | 80 | LNFT | 900.00 | 72,000.00 | 734.70 | 58,776.00 | 850.00 | 68,000.00 | 1,000.00 | 80,000.00 | | 0024 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Headwall | 2 | EACH | 18,000.00 | 36,000.00 | 19,971.70 | 39,943.40 | 29,500.00 | 59,000.00 | 20,000.00 | 40,000.00 | | 0025 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 426 | INLF | 2.50 | 1,065.00 | 1.93 | 822.18 | 1.25 | 532.50 | 0.01 | 4.26 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 232,434.50 | | 238,285.00 | | 256,555.30 | | 257,532.76 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - RIVER/ROAD CONSTRUCTION, INC. | - 10 - Industrial Enterprises, Inc. | - 11 - Mack's Trucking of Independence LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 14,000.00 | 14,000.00 | 5,750.00 | 5,750.00 | 10,000.00 | 10,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 4,500.00 | 4,500.00 | 32,200.00 | 32,200.00 | 2,300.00 | 2,300.00 | | 0003 | 202-02-04500 | Removal of Bridge Sta 10+64 | 530 | SQFT | 20.00 | 10,600.00 | 16.10 | 8,533.00 | 17.00 | 9,010.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 79.4 | LNFT | 50.00 | 3,970.00 | 11.50 | 913.10 | 20.00 | 1,588.00 | | 0005 | 202-02-32120 | Removal of Pipe (Side Drain) 18" CMP | 24 | LNFT | 60.00 | 1,440.00 | 11.50 | 276.00 | 69.00 | 1,656.00 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 230.3 | SQYD | 10.00 | 2,303.00 | 11.50 | 2,648.45 | 20.00 | 4,606.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 12,000.00 | 12,000.00 | 39,100.00 | 39,100.00 | 12,000.00 | 12,000.00 | | 0008 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 2 | EACH | 3,000.00 | 6,000.00 | 460.00 | 920.00 | 1,500.00 | 3,000.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 176 | LNFT | 6.00 | 1,056.00 | 3.45 | 607.20 | 12.00 | 2,112.00 | | 0010 | 302-02-12000 | Class II Base Course (12" Thick) | 302.2 | SQYD | 60.00 | 18,132.00 | 52.64 | 15,907.81 | 85.00 | 25,687.00 | | 0011 | 502-01-00100 | Asphalt Concrete | 55.6 | TON | 410.00 | 22,796.00 | 261.63 | 14,546.63 | 555.00 | 30,858.00 | | 0012 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 20 | LNFT | 200.00 | 4,000.00 | 95.24 | 1,904.80 | 100.00 | 2,000.00 | | 0013 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 80 | LNFT | 20.00 | 1,600.00 | 23.00 | 1,840.00 | 80.00 | 6,400.00 | | 0014 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 3,400.00 | 3,400.00 | 4,111.25 | 4,111.25 | 2,600.00 | 2,600.00 | | 0015 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 47 | SQYD | 200.00 | 9,400.00 | 86.25 | 4,053.75 | 175.50 | 8,248.50 | | 0016 | 711-04-00100 | Geotextile Fabric | 47 | SQYD | 8.00 | 376.00 | 2.88 | 135.36 | 14.00 | 658.00 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 12,800.00 | 12,800.00 | 11,500.00 | 11,500.00 | 6,500.00 | 6,500.00 | | 0018 | 726-01-00100 | Bedding Material | 49 | CUYD | 400.00 | 19,600.00 | 115.00 | 5,635.00 | 65.00 | 3,185.00 | | 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 14,000.00 | 14,000.00 | 17,825.00 | 17,825.00 | 35,000.00 | 35,000.00 | | 0020 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 600.00 | 2,400.00 | 97.75 | 391.00 | 100.00 | 400.00 | | 0021 | 739-01-00100 | Hydro-Seeding | 0.03 | ACRE | 70,000.00 | 2,100.00 | 51,750.00 | 1,552.50 | 146,000.00 | 4,380.00 | | 0022 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 2,300.00 | 2,300.00 | 8,000.00 | 8,000.00 | | 0023 | 805-15-00800 | Reinforced Concrete Box Culverts (Precast) (7' x 5') (ASTM C1577) | 80 | LNFT | 830.00 | 66,400.00 | 1,165.96 | 93,276.80 | 1,550.00 | 124,000.00 | | 0024 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Headwall | 2 | EACH | 22,000.00 | 44,000.00 | 26,970.95 | 53,941.90 | 20,000.00 | 40,000.00 | | 0025 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 426 | INLF | 7.00 | 2,982.00 | 1.15 | 489.90 | 1.00 | 426.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 294,855.00 | | 320,359.45 | | 344,614.50 |
|