Proposal:H.012408.6
Parish:Bienville, Desoto, Webster
Routes:I-20, LA 175, US 371
Description:DISTRICT 04 BRIDGE HEADER REPAIR
Type Construction:EMBANKMENT, RIPRAP, FOWABLE FILL AND RELATED WORK.
Estimated Construction Cost:$655,086.76
| Rank | License | Bidder | Construction Bid |
| 1 | 49239 | WL Bass Construction Inc. | $423,794.65 |
| 2 | 30774 | Progressive Construction Co., LLC | $449,841.85 |
| 3 | 40615 | SPECIALTY TRACKHOE & DOZER SERV.INC | $466,521.50 |
| 4 | 35849 | T.L. CONSTRUCTION LLC | $512,434.80 |
| 5 | 34567 | James Construction Group LLC | $619,973.50 |
| 6 | 39462 | JB JAMES CONSTRUCTION LLC | $693,798.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - WL Bass Construction Inc. | - 2 - Progressive Construction Co., LLC | - 3 - SPECIALTY TRACKHOE & DOZER SERV.INC | - 4 - T.L. CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,000.00 | 2,000.00 | 20,000.00 | 20,000.00 | 35,000.00 | 35,000.00 | 12,500.00 | 12,500.00 | | 0002 | 202-02-06090 | Removal of Concrete Revetment | 1 | LUMP | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 | 12,500.00 | 12,500.00 | | 0003 | 202-02-32120 | Removal of Pipe (Side Drain) 24" CMP | 16 | LNFT | 60.00 | 960.00 | 58.00 | 928.00 | 50.00 | 800.00 | 75.00 | 1,200.00 | | 0004 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 55 | SQYD | 38.00 | 2,090.00 | 28.00 | 1,540.00 | 50.00 | 2,750.00 | 50.00 | 2,750.00 | | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 39,800.00 | 39,800.00 | 51,000.00 | 51,000.00 | 35,000.00 | 35,000.00 | 50,000.00 | 50,000.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,875 | CUYD | 25.00 | 46,875.00 | 35.00 | 65,625.00 | 40.00 | 75,000.00 | 30.00 | 56,250.00 | | 0007 | 204-02-00100 | Temporary Hay Bales | 150 | EACH | 10.00 | 1,500.00 | 17.50 | 2,625.00 | 15.00 | 2,250.00 | 25.00 | 3,750.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 1,200 | LNFT | 1.65 | 1,980.00 | 3.00 | 3,600.00 | 3.00 | 3,600.00 | 2.00 | 2,400.00 | | 0009 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 55 | SQYD | 238.00 | 13,090.00 | 135.00 | 7,425.00 | 275.00 | 15,125.00 | 113.00 | 6,215.00 | | 0010 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 16 | EACH | 600.00 | 9,600.00 | 313.00 | 5,008.00 | 250.00 | 4,000.00 | 400.00 | 6,400.00 | | 0011 | 710-01-00100 | Flowable Fill | 45 | CUYD | 273.00 | 12,285.00 | 248.00 | 11,160.00 | 275.00 | 12,375.00 | 225.00 | 10,125.00 | | 0012 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,454 | SQYD | 92.00 | 133,768.00 | 78.00 | 113,412.00 | 80.00 | 116,320.00 | 100.00 | 145,400.00 | | 0013 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 502 | SQYD | 132.00 | 66,264.00 | 126.00 | 63,252.00 | 110.00 | 55,220.00 | 125.00 | 62,750.00 | | 0014 | 711-04-00100 | Geotextile Fabric | 1,956 | SQYD | 4.00 | 7,824.00 | 3.00 | 5,868.00 | 2.00 | 3,912.00 | 3.60 | 7,041.60 | | 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 13,000.00 | 13,000.00 | 25,000.00 | 25,000.00 | 35,000.00 | 35,000.00 | | 0016 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 4,400.00 | 8,800.00 | 3,175.00 | 6,350.00 | 2,000.00 | 4,000.00 | 4,500.00 | 9,000.00 | | 0017 | 716-01-00100 | Mulch (Vegetative) | 1.394 | TON | 1,000.00 | 1,394.00 | 3,600.00 | 5,018.40 | 3,500.00 | 4,879.00 | 1,300.00 | 1,812.20 | | 0018 | 717-01-00100 | Seeding | 41.5 | LB | 15.00 | 622.50 | 13.30 | 551.95 | 30.00 | 1,245.00 | 18.00 | 747.00 | | 0019 | 718-01-00100 | Fertilizer | 697 | LB | 0.95 | 662.15 | 0.50 | 348.50 | 1.50 | 1,045.50 | 2.00 | 1,394.00 | | 0020 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 200 | SQYD | 1.40 | 280.00 | 5.15 | 1,030.00 | 5.00 | 1,000.00 | 6.00 | 1,200.00 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 42,000.00 | 42,000.00 | 44,000.00 | 44,000.00 | 40,000.00 | 40,000.00 | 80,000.00 | 80,000.00 | | 0022 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,000.00 | 7,000.00 | 3,100.00 | 3,100.00 | 13,000.00 | 13,000.00 | 4,000.00 | 4,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 423,794.65 | | 449,841.85 | | 466,521.50 | | 512,434.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - James Construction Group LLC | - 6 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 60,000.00 | 60,000.00 | 80,000.00 | 80,000.00 | | 0002 | 202-02-06090 | Removal of Concrete Revetment | 1 | LUMP | 25,000.00 | 25,000.00 | 40,000.00 | 40,000.00 | | 0003 | 202-02-32120 | Removal of Pipe (Side Drain) 24" CMP | 16 | LNFT | 120.00 | 1,920.00 | 60.00 | 960.00 | | 0004 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 55 | SQYD | 90.00 | 4,950.00 | 30.00 | 1,650.00 | | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 12,500.00 | 12,500.00 | 20,000.00 | 20,000.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,875 | CUYD | 90.00 | 168,750.00 | 80.00 | 150,000.00 | | 0007 | 204-02-00100 | Temporary Hay Bales | 150 | EACH | 20.00 | 3,000.00 | 50.00 | 7,500.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 1,200 | LNFT | 2.00 | 2,400.00 | 7.00 | 8,400.00 | | 0009 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 55 | SQYD | 100.00 | 5,500.00 | 300.00 | 16,500.00 | | 0010 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 16 | EACH | 300.00 | 4,800.00 | 150.00 | 2,400.00 | | 0011 | 710-01-00100 | Flowable Fill | 45 | CUYD | 500.00 | 22,500.00 | 300.00 | 13,500.00 | | 0012 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,454 | SQYD | 105.00 | 152,670.00 | 90.00 | 130,860.00 | | 0013 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 502 | SQYD | 120.00 | 60,240.00 | 125.00 | 62,750.00 | | 0014 | 711-04-00100 | Geotextile Fabric | 1,956 | SQYD | 8.00 | 15,648.00 | 4.00 | 7,824.00 | | 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 8,000.00 | 8,000.00 | 55,000.00 | 55,000.00 | | 0016 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 1,250.00 | 2,500.00 | 3,750.00 | 7,500.00 | | 0017 | 716-01-00100 | Mulch (Vegetative) | 1.394 | TON | 4,000.00 | 5,576.00 | 2,500.00 | 3,485.00 | | 0018 | 717-01-00100 | Seeding | 41.5 | LB | 15.00 | 622.50 | 50.00 | 2,075.00 | | 0019 | 718-01-00100 | Fertilizer | 697 | LB | 1.00 | 697.00 | 2.00 | 1,394.00 | | 0020 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 200 | SQYD | 1.00 | 200.00 | 5.00 | 1,000.00 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 60,000.00 | 60,000.00 | 61,000.00 | 61,000.00 | | 0022 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,500.00 | 2,500.00 | 20,000.00 | 20,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 619,973.50 | | 693,798.00 |
|