Proposal:H.001172.6-R1
Parish:Caddo
Routes:LA 1
Description:VIVIAN SCENIC GATEWAYS
Type Construction:CLEARING AND GRUBBING, GRADING, LIGHTING, GATEWAY SIGNS, LANDSCAPING, AND RELATED WORK.
Estimated Construction Cost:$148,708.00
| Rank | License | Bidder | Construction Bid |
| 1 | 60022 | D. O'BRIAN CONSTRUCTION, LLC | $227,818.00 |
| 2 | 35849 | T.L. CONSTRUCTION LLC | $248,506.00 |
| 3 | 18546 | C W & W Contractors, Inc. | $273,145.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - D. O'BRIAN CONSTRUCTION, LLC | - 2 - T.L. CONSTRUCTION LLC | - 3 - C W & W Contractors, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.33 | LUMP | 23,000.00 | 23,000.00 | 5,500.00 | 5,500.00 | 20,000.00 | 20,000.00 | | 0002 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 22,000.00 | 22,000.00 | 7,500.00 | 7,500.00 | 20,000.00 | 20,000.00 | | 0003 | 204-02-00100 | Temporary Hay or Straw Bales | 10 | EACH | 35.00 | 350.00 | 56.00 | 560.00 | 30.00 | 300.00 | | 0004 | 204-06-00100 | Temporary Silt Fencing | 290 | LNFT | 6.00 | 1,740.00 | 4.00 | 1,160.00 | 5.00 | 1,450.00 | | 0005 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 34,500.00 | 34,500.00 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | | 0006 | 714-01-00500 | Slab Sodding (Common Bermuda) Cynodon Dactylon | 192 | SQYD | 15.00 | 2,880.00 | 12.50 | 2,400.00 | 12.00 | 2,304.00 | | 0007 | 719-01-01020 | Plants (Tree) (Balled and Burlapped) (1-1/2 inch cal) Crape Myrtle, Lagerstroemia Indica Variety "Muskogee", 10'-12' Ht, Min 6' Spread, Min 3 Canes, 1 1/2" Cal per Cane | 6 | EACH | 750.00 | 4,500.00 | 700.00 | 4,200.00 | 650.00 | 3,900.00 | | 0008 | 719-01-01300 | Plants (Tree) (Balled and Burlapped) (Specimen) Eastern Red Bud, Cercis Canadensis, 8'-10' Ht, Min 5' Spread, Min 3 Canes, 1 1/2" Cal/Cane | 4 | EACH | 550.00 | 2,200.00 | 430.00 | 1,720.00 | 400.00 | 1,600.00 | | 0009 | 719-01-06000 | Plants (Plant) (Container) (4 inch) Liriope, Liriope Muscari Variety "Big Blue", 7-12 Bibbs per pot, Plant 12" O.C. | 688 | EACH | 6.00 | 4,128.00 | 4.00 | 2,752.00 | 3.00 | 2,064.00 | | 0010 | 719-01-06020 | Plants (Plant) (Container) (1 gallon) Daylily, Hemerocallis Fulva Variety Hyperion Yellow, Full | 42 | EACH | 12.00 | 504.00 | 11.00 | 462.00 | 10.00 | 420.00 | | 0011 | 719-01-06060 | Plants (Plant) (Container) (3 gallon) Knockout Rose, Rosa Species Variety Pink, Min 18" Ht, Min 18" Spread | 46 | EACH | 30.00 | 1,380.00 | 30.00 | 1,380.00 | 27.00 | 1,242.00 | | 0012 | 719-01-06060 | Plants (Plant) (Container) (3 gallon) Loropetalum,Loropetalum Chinense Variety Plum Delight, Min 24" Ht, 24" Spread | 34 | EACH | 24.00 | 816.00 | 24.00 | 816.00 | 25.00 | 850.00 | | 0013 | 719-01-06060 | Plants (Plant) (Container) (3 gallon) Pink Muhly Grass, Muhlenbergia Capillaris, Full | 48 | EACH | 25.00 | 1,200.00 | 25.00 | 1,200.00 | 25.00 | 1,200.00 | | 0014 | 719-02-00100 | Top Dressing Mulch (3 inch Depth) Brown Cypress | 236 | SQYD | 25.00 | 5,900.00 | 15.00 | 3,540.00 | 15.00 | 3,540.00 | | 0015 | 719-03-00300 | Bed Preparation (10 inch Depth) | 236 | SQYD | 15.00 | 3,540.00 | 18.00 | 4,248.00 | 20.00 | 4,720.00 | | 0016 | 727-01-00100 | Mobilization | 1 | LUMP | 38,500.00 | 38,500.00 | 35,000.00 | 35,000.00 | 30,000.00 | 30,000.00 | | 0017 | 730-01-00100 | Trenching and Backfilling | 240 | LNFT | 8.00 | 1,920.00 | 24.00 | 5,760.00 | 22.00 | 5,280.00 | | 0018 | 730-02-01040 | Conduit with Conductors (PVC/HDPE) (1") 2-#10 THHN, 1-#10 Bare Solid Grnd., Sch. 40 PVC/HDPE UDG. | 240 | LNFT | 18.00 | 4,320.00 | 13.00 | 3,120.00 | 12.00 | 2,880.00 | | 0019 | 730-02-03100 | Conduit with Conductors (Rigid Galvanized Steel) (2") 2-#4 AWG THHN, 1-#8 Green Ground, Above Ground | 20 | LNFT | 24.00 | 480.00 | 68.50 | 1,370.00 | 63.00 | 1,260.00 | | 0020 | 730-07-06020 | Luminaire (400 Watt) (Metal Halide) | 2 | EACH | 1,200.00 | 2,400.00 | 1,300.00 | 2,600.00 | 1,200.00 | 2,400.00 | | 0021 | 730-08-00200 | Electrical Service Point (Structure) | 2 | EACH | 14,800.00 | 29,600.00 | 1,320.00 | 2,640.00 | 1,250.00 | 2,500.00 | | 0022 | 730-09-00100 | Electrical System | 1 | LUMP | 4,800.00 | 4,800.00 | 6,500.00 | 6,500.00 | 6,500.00 | 6,500.00 | | 0023 | 730-18-00100 | Service Pole | 2 | EACH | 2,400.00 | 4,800.00 | 1,000.00 | 2,000.00 | 900.00 | 1,800.00 | | 0024 | 730-22-00220 | Underground Marker Tape (3")(Detectable) | 240 | LNFT | 3.75 | 900.00 | 1.30 | 312.00 | 1.25 | 300.00 | | 0025 | 739-01-00100 | Hydro-Seeding | 0.33 | ACRE | 2,000.00 | 660.00 | 10,200.00 | 3,366.00 | 9,500.00 | 3,135.00 | | 0026 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,500.00 | 5,500.00 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | | 0027 | NS-ENH-09000 | Irrigation System Furnished and Installed | 1 | LUMP | 11,000.00 | 11,000.00 | 12,000.00 | 12,000.00 | 10,500.00 | 10,500.00 | | 0028 | NS-ENH-19100 | Sign (Gateway) Furnished and Installed | 2 | EACH | 5,500.00 | 11,000.00 | 60,000.00 | 120,000.00 | 52,000.00 | 104,000.00 | | 0029 | NS-ENH-23120 | Water Valve and Meter Box (New Installation) (Furnished and Installed)(Includes Two Hose Bibb Risers) | 2 | EACH | 1,650.00 | 3,300.00 | 3,200.00 | 6,400.00 | 4,500.00 | 9,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 227,818.00 | | 248,506.00 | | 273,145.00 |
|