Proposal:H.009658.6
Parish:Lafourche
Routes:US 90
Description:US 90: LA 182 - LA 1
Type Construction:MILLING ASPHALT CONCRETE, MILLING CONCRETE PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$3,539,886.88
Rank | License | Bidder | Construction Bid |
1 | 00481 | COASTAL BRIDGE CO., L.L.C. | $2,667,113.30 |
2 | 06276 | Barriere Construction Co., LLC | $2,969,240.05 |
3 | 62139 | HUEY P. STOCKSTILL, LLC | $3,186,170.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - COASTAL BRIDGE CO., L.L.C. | - 2 - Barriere Construction Co., LLC | - 3 - HUEY P. STOCKSTILL, LLC | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | 0001 | 202-02-14500 | Removal of Guard Rail | 3,125 | LNFT | 7.75 | 24,218.75 | 2.00 | 6,250.00 | 7.50 | 23,437.50 | 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,366.2 | CUYD | 5.00 | 11,831.00 | 20.00 | 47,324.00 | 24.00 | 56,788.80 | 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 51.9 | CUYD | 50.00 | 2,595.00 | 50.00 | 2,595.00 | 80.00 | 4,152.00 | 0004 | 701-14-00100 | Cleaning Existing Pipes | 510 | LNFT | 15.00 | 7,650.00 | 7.00 | 3,570.00 | 16.00 | 8,160.00 | 0005 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 62.5 | LNFT | 40.00 | 2,500.00 | 30.00 | 1,875.00 | 35.00 | 2,187.50 | 0006 | 704-03-00100 | Blocked Out Guard Rail | 2,268.75 | LNFT | 18.00 | 40,837.50 | 20.00 | 45,375.00 | 20.00 | 45,375.00 | 0007 | 704-06-00200 | Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) | 6.25 | LNFT | 95.00 | 593.75 | 100.00 | 625.00 | 100.00 | 625.00 | 0008 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 25 | LNFT | 30.00 | 750.00 | 38.00 | 950.00 | 35.00 | 875.00 | 0009 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 400 | LNFT | 75.00 | 30,000.00 | 65.00 | 26,000.00 | 60.00 | 24,000.00 | 0010 | 704-11-00100 | Guard Rail End Treatment (Flared) | 17 | EACH | 2,300.00 | 39,100.00 | 2,500.00 | 42,500.00 | 2,500.00 | 42,500.00 | 0011 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 290,000.00 | 290,000.00 | 49,000.00 | 49,000.00 | 0012 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 5,860 | LNFT | 0.35 | 2,051.00 | 0.05 | 293.00 | 0.35 | 2,051.00 | 0013 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 35.2 | MILE | 125.00 | 4,400.00 | 150.00 | 5,280.00 | 200.00 | 7,040.00 | 0014 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 8.8 | MILE | 500.00 | 4,400.00 | 5.00 | 44.00 | 500.00 | 4,400.00 | 0015 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 35.2 | MILE | 1.00 | 35.20 | 5.00 | 176.00 | 625.00 | 22,000.00 | 0016 | 717-01-00100 | Seeding | 384 | LB | 3.00 | 1,152.00 | 5.00 | 1,920.00 | 15.00 | 5,760.00 | 0017 | 718-01-00100 | Fertilizer | 12,800 | LB | 0.40 | 5,120.00 | 0.25 | 3,200.00 | 0.45 | 5,760.00 | 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 200,000.00 | 200,000.00 | 295,000.00 | 295,000.00 | 198,000.00 | 198,000.00 | 0019 | 729-16-00300 | Object Marker Assembly (Type 3) | 18 | EACH | 85.00 | 1,530.00 | 70.00 | 1,260.00 | 75.00 | 1,350.00 | 0020 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,435 | EACH | 7.50 | 10,762.50 | 6.00 | 8,610.00 | 8.00 | 11,480.00 | 0021 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 2,930 | LNFT | 3.00 | 8,790.00 | 2.00 | 5,860.00 | 3.00 | 8,790.00 | 0022 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 463 | LNFT | 17.50 | 8,102.50 | 15.00 | 6,945.00 | 18.00 | 8,334.00 | 0023 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 17.6 | MILE | 3,900.00 | 68,640.00 | 4,000.00 | 70,400.00 | 4,030.00 | 70,928.00 | 0024 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 8.8 | MILE | 9.50 | 83.60 | 750.00 | 6,600.00 | 1,000.00 | 8,800.00 | 0025 | 732-03-02001 | Plast Pave Striping (Broken Line) (4" Width) (Thermo 90 mil)(Blk Cont) | 0.409 | MILE | 2,500.00 | 1,022.50 | 2,000.00 | 818.00 | 2,600.00 | 1,063.40 | 0026 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.246 | MILE | 5,000.00 | 1,230.00 | 4,000.00 | 984.00 | 5,100.00 | 1,254.60 | 0027 | 732-05-00100 | Removal of Existing Markings | 0.409 | MILE | 7,500.00 | 3,067.50 | 6,000.00 | 2,454.00 | 8,000.00 | 3,272.00 | 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 13,000.00 | 13,000.00 | 0029 | NS-502-01000 | Asphalt Concrete | 26,605.1 | TON | 50.00 | 1,330,255.00 | 65.00 | 1,729,331.50 | 78.00 | 2,075,197.80 | 0030 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,066.4 | TON | 5.00 | 5,332.00 | 65.00 | 69,316.00 | 130.00 | 138,632.00 | 0031 | NS-509-01000 | Milling Asphalt Pavement | 210,540 | SQYD | 3.50 | 736,890.00 | 1.00 | 210,540.00 | 1.50 | 315,810.00 | 0032 | NS-509-02000 | Contractor Retained Reclaimed Asphalt Pavement | -5,848.7 | CUYD | 20.00 | -116,974.00 | 1.00 | -5,848.70 | 10.00 | -58,487.00 | 0033 | NS-510-01100 | Pavement Patching (6" Minimum Thickness) | 234 | SQYD | 150.00 | 35,100.00 | 50.00 | 11,700.00 | 55.00 | 12,870.00 | 0034 | NS-510-01500 | Pavement Patching (14" Minimum Thickness) | 700 | SQYD | 190.00 | 133,000.00 | 80.00 | 56,000.00 | 83.00 | 58,100.00 | 0035 | NS-602-00001 | Milling Concrete Pavement | 675.5 | SQYD | 25.00 | 16,887.50 | 1.50 | 1,013.25 | 7.20 | 4,863.60 | 0036 | NS-724-00005 | Rumble Strips (Shoulder) | 17.6 | MILE | 350.00 | 6,160.00 | 300.00 | 5,280.00 | 500.00 | 8,800.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,667,113.30 | | 2,969,240.05 | | 3,186,170.20 |
|