Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Brown Industrial Construction, LLC | - 2 - Boone Services LLC | - 3 - D. O'BRIAN CONSTRUCTION, LLC |
Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount |
0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 67,000.00 | 67,000.00 | 58,000.00 | 58,000.00 | 23,000.00 | 23,000.00 |
0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 8,500.00 | 8,500.00 | 5,135.00 | 5,135.00 | 24,000.00 | 24,000.00 |
0003 | 202-02-00010 | Removal of (Light Pole on slab, Sta 116+00 West Lee RT) | 1 | EACH | 4,000.00 | 4,000.00 | 3,195.00 | 3,195.00 | 8,000.00 | 8,000.00 |
0004 | 202-02-00010 | Removal of (Light Pole on slab, Sta 48+75 RT) | 1 | EACH | 4,000.00 | 4,000.00 | 3,195.00 | 3,195.00 | 6,000.00 | 6,000.00 |
0005 | 202-02-00010 | Removal of (Light Pole on slab, Sta 49+30 RT) | 1 | EACH | 4,000.00 | 4,000.00 | 3,195.00 | 3,195.00 | 8,000.00 | 8,000.00 |
0006 | 202-02-00010 | Removal of Flag pole (Sta 61+89 RT, metal pole on slab) | 1 | EACH | 1,000.00 | 1,000.00 | 375.00 | 375.00 | 5,000.00 | 5,000.00 |
0007 | 202-02-00010 | Removal of Flag Pole (Sta 61+91 RT, metal pole on slab) | 1 | EACH | 1,000.00 | 1,000.00 | 375.00 | 375.00 | 5,000.00 | 5,000.00 |
0008 | 202-02-00010 | Removal of Flag Pole (Sta 61+93 RT, metal pole on slab) | 1 | EACH | 1,000.00 | 1,000.00 | 375.00 | 375.00 | 5,000.00 | 5,000.00 |
0009 | 202-02-00010 | Removal of Lamp Post (Sta 61+95 RT, metal pole on slab) | 1 | EACH | 4,000.00 | 4,000.00 | 3,195.00 | 3,195.00 | 4,000.00 | 4,000.00 |
0010 | 202-02-00010 | Removal of Lamp Post (Sta 61+98 RT, metal pole on slab) | 1 | EACH | 4,000.00 | 4,000.00 | 3,195.00 | 3,195.00 | 6,000.00 | 6,000.00 |
0011 | 202-02-05000 | Removal of Building (Sta 61+89 RT 8ft x 15ft metal on slab)(bus stop canopy) | 1 | EACH | 1,500.00 | 1,500.00 | 1,905.00 | 1,905.00 | 18,000.00 | 18,000.00 |
0012 | 202-02-06100 | Removal of Concrete Walks and Drives | 593 | SQYD | 20.00 | 11,860.00 | 13.75 | 8,153.75 | 16.00 | 9,488.00 |
0013 | 202-02-38200 | Removal of Signs (Sta 117+20 West Lee Drive, 3ft x 6ft wood frame on dirt) | 1 | EACH | 3,000.00 | 3,000.00 | 485.00 | 485.00 | 1,200.00 | 1,200.00 |
0014 | 202-02-38200 | Removal of Signs (Sta 118+70 West Lee LT, 3ft x 6ft wood frame on dirt) | 1 | EACH | 1,000.00 | 1,000.00 | 485.00 | 485.00 | 1,200.00 | 1,200.00 |
0015 | 202-02-38200 | Removal of Signs (Sta 118+80 West Lee Drive RT, 20ft x 40ft, metal sign on slab) | 1 | EACH | 1,500.00 | 1,500.00 | 3,340.00 | 3,340.00 | 22,000.00 | 22,000.00 |
0016 | 202-02-38200 | Removal of Signs (Sta 42+88 RT, 6ft x 8ft on slab) | 1 | EACH | 1,500.00 | 1,500.00 | 2,615.00 | 2,615.00 | 4,500.00 | 4,500.00 |
0017 | 202-02-38200 | Removal of Signs (Sta 48+10 RT, 10ft x 16ft on slab)(Michelin, etc) | 1 | EACH | 3,000.00 | 3,000.00 | 3,475.00 | 3,475.00 | 6,500.00 | 6,500.00 |
0018 | 202-02-38200 | Removal of Signs (Sta 49+70 RT, 10ft x 15ft on slab)(Circle K) | 1 | EACH | 3,000.00 | 3,000.00 | 3,475.00 | 3,475.00 | 4,000.00 | 4,000.00 |
0019 | 202-02-38200 | Removal of Signs (Sta 57+65 RT, 7ft x 12ft brick veneer on slab) | 1 | EACH | 1,500.00 | 1,500.00 | 2,435.00 | 2,435.00 | 4,500.00 | 4,500.00 |
0020 | 202-02-38200 | Removal of Signs (Sta 57+85 RT 7ft x 12 ft brick veneer on slab) | 1 | EACH | 1,500.00 | 1,500.00 | 2,435.00 | 2,435.00 | 2,500.00 | 2,500.00 |
0021 | 202-02-38200 | Removal of Signs (Sta 60+00 RT 6ft x 12ft wood frame on dirt) | 1 | EACH | 1,500.00 | 1,500.00 | 485.00 | 485.00 | 4,500.00 | 4,500.00 |
0022 | 202-02-38200 | Removal of Signs (Sta. 51+00 RT, 10ft x 10ft x33ft Metal Sign on Slab) | 1 | EACH | 3,000.00 | 3,000.00 | 7,310.00 | 7,310.00 | 5,000.00 | 5,000.00 |
0023 | 204-06-00100 | Temporary Silt Fencing | 6,405 | LNFT | 1.00 | 6,405.00 | 2.75 | 17,613.75 | 3.50 | 22,417.50 |
0024 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | CUYD | 200.00 | 20,000.00 | 110.00 | 11,000.00 | 65.00 | 6,500.00 |
0025 | 707-01-00100 | Concrete Curb | 448 | LNFT | 25.00 | 11,200.00 | 36.95 | 16,553.60 | 26.00 | 11,648.00 |
0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 15,750.00 | 15,750.00 | 12,000.00 | 12,000.00 |
0027 | 727-01-00100 | Mobilization | 1 | LUMP | 20,000.00 | 20,000.00 | 26,000.00 | 26,000.00 | 21,000.00 | 21,000.00 |
0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 5,400.00 | 5,400.00 | 2,000.00 | 2,000.00 |
0029 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 4,578 | INLF | 1.00 | 4,578.00 | 1.80 | 8,240.40 | 1.25 | 5,722.50 |
| | | | | | | | | | |
| | CONTRACTOR TOTAL | | | | 209,543.00 | | 217,391.50 | | 258,676.00 |