Proposal:H.006567.6
Parish:Orleans
Description:PEDESTRIAN CROSSWALK ENHANCEMENTS
Type Construction:TRAFFIC SIGNALIZATION AND RELATED WORK.
Estimated Construction Cost:$1,343,587.00
| Rank | License | Bidder | Construction Bid |
| 1 | 05473 | Jack B. Harper Electrical LLC | $985,971.18 |
| 2 | 08470 | Diamond Electrical Co., Inc. | $1,163,473.40 |
| 3 | 00448 | WALTER J. BARNES ELECTRIC CO., INC. | $1,233,974.85 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Jack B. Harper Electrical LLC | - 2 - Diamond Electrical Co., Inc. | - 3 - WALTER J. BARNES ELECTRIC CO., INC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00030 | Removal of Existing Pedestrian Crosswalk Markings | 7,300 | LNFT | 4.00 | 29,200.00 | 2.90 | 21,170.00 | 4.75 | 34,675.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 212 | SQYD | 16.80 | 3,561.60 | 35.00 | 7,420.00 | 34.50 | 7,314.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 168 | LNFT | 16.80 | 2,822.40 | 35.00 | 5,880.00 | 34.50 | 5,796.00 | | 0004 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 13,720.00 | 13,720.00 | 18,524.00 | 18,524.00 | 13,100.00 | 13,100.00 | | 0005 | 706-01-00100 | Concrete Walk (4" Thick) | 21.6 | SQYD | 106.40 | 2,298.24 | 347.00 | 7,495.20 | 344.00 | 7,430.40 | | 0006 | 706-03-00500 | Incidental Concrete Paving (8" Thick) | 64.8 | SQYD | 106.40 | 6,894.72 | 116.00 | 7,516.80 | 115.00 | 7,452.00 | | 0007 | 706-04-00100 | Handicapped Curb Ramps | 25 | EACH | 2,240.00 | 56,000.00 | 3,473.00 | 86,825.00 | 3,440.00 | 86,000.00 | | 0008 | 707-01-00200 | Concrete Curb (Barrier) | 60 | LNFT | 39.20 | 2,352.00 | 35.00 | 2,100.00 | 35.00 | 2,100.00 | | 0009 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 12,936.00 | 12,936.00 | 14,923.00 | 14,923.00 | 19,800.00 | 19,800.00 | | 0010 | 727-01-00100 | Mobilization | 1 | LUMP | 69,825.00 | 69,825.00 | 50,038.00 | 50,038.00 | 102,300.00 | 102,300.00 | | 0011 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 41,363 | LNFT | 9.00 | 372,267.00 | 12.70 | 525,310.10 | 10.35 | 428,107.05 | | 0012 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 413 | LNFT | 22.05 | 9,106.65 | 23.00 | 9,499.00 | 74.50 | 30,768.50 | | 0013 | 736-04-02000 | Signal Support (Pedestal Pole) | 13 | EACH | 1,842.94 | 23,958.22 | 2,800.00 | 36,400.00 | 1,270.00 | 16,510.00 | | 0014 | 736-10-00200 | Underground Junction Box (Type E) | 7 | EACH | 358.10 | 2,506.70 | 900.00 | 6,300.00 | 1,470.00 | 10,290.00 | | 0015 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 2,205 | LNFT | 1.65 | 3,638.25 | 1.90 | 4,189.50 | 10.20 | 22,491.00 | | 0016 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,290.00 | 3,290.00 | 7,919.00 | 7,919.00 | 15,000.00 | 15,000.00 | | 0017 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 3,140 | INLF | 1.12 | 3,516.80 | 3.50 | 10,990.00 | 3.45 | 10,833.00 | | 0018 | NS-736-00010 | LED Pedestrian Countdown Signal Head | 497 | EACH | 527.80 | 262,316.60 | 520.00 | 258,440.00 | 640.00 | 318,080.00 | | 0019 | NS-P36-00004 | Traffic Signal Cable (7c #14 AWG) | 2,200 | LNFT | 2.00 | 4,400.00 | 1.80 | 3,960.00 | 1.90 | 4,180.00 | | 0020 | NS-P36-00005 | Traffic Controller Unit Re-Programming | 44 | each | 266.71 | 11,735.24 | 346.00 | 15,224.00 | 860.00 | 37,840.00 | | 0021 | NS-P36-00012 | Pedestrian Signal Cable (5c #14 AWG) | 35,638 | LNFT | 1.61 | 57,377.18 | 1.20 | 42,765.60 | 0.55 | 19,600.90 | | 0022 | NS-P36-00015 | Pulling Cable Through Existing Conduit at an Intersection | 34,307 | LF | 0.94 | 32,248.58 | 0.60 | 20,584.20 | 1.00 | 34,307.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 985,971.18 | | 1,163,473.40 | | 1,233,974.85 |
|