Proposal:H.011154.6
Parish:Rapides
Routes:LA 3170, US 71
Description:US 71 AND LA 3170 TURN LANES
Type Construction:GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, PAVEMENT PATCHING, AND RELATED WORK.
Estimated Construction Cost:$453,523.66
| Rank | License | Bidder | Construction Bid |
| 1 | 35849 | T.L. CONSTRUCTION LLC | $507,577.20 |
| 2 | 55276 | Turner & Turner Contracting | $559,031.72 |
| 3 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $570,928.08 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - T.L. CONSTRUCTION LLC | - 2 - Turner & Turner Contracting | - 3 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 6,800.00 | 6,800.00 | 13,300.00 | 13,300.00 | 2,500.00 | 2,500.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 1,941.5 | SQYD | 10.00 | 19,415.00 | 9.59 | 18,619.96 | 11.00 | 21,356.50 | | 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 40,000.00 | 40,000.00 | 21,996.04 | 21,996.04 | 25,000.00 | 25,000.00 | | 0004 | 204-02-00100 | Temporary Hay or Straw Bales | 24 | EACH | 20.00 | 480.00 | 14.74 | 353.73 | 16.00 | 384.00 | | 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 7 | EACH | 225.00 | 1,575.00 | 29.41 | 205.86 | 130.00 | 910.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 225 | LNFT | 3.00 | 675.00 | 0.46 | 104.38 | 4.25 | 956.25 | | 0007 | 302-02-06121 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 3,737.2 | SQYD | 26.00 | 97,167.20 | 28.92 | 108,086.92 | 32.00 | 119,590.40 | | 0008 | 304-05-00100 | Lime Treatment (Type E) | 10.59 | TON | 400.00 | 4,236.00 | 317.87 | 3,366.21 | 1,000.00 | 10,590.00 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 4 | CUYD | 200.00 | 800.00 | 89.79 | 359.15 | 135.00 | 540.00 | | 0010 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 50.00 | 2,500.00 | 43.49 | 2,174.55 | 105.00 | 5,250.00 | | 0011 | 502-01-00100 | Superpave Asphaltic Concrete | 640.6 | TON | 125.00 | 80,075.00 | 175.50 | 112,425.30 | 130.00 | 83,278.00 | | 0012 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 749 | TON | 150.00 | 112,350.00 | 227.50 | 170,397.50 | 130.00 | 97,370.00 | | 0013 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 47 | SQYD | 114.00 | 5,358.00 | 50.00 | 2,350.00 | 160.00 | 7,520.00 | | 0014 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 88 | LNFT | 65.00 | 5,720.00 | 15.08 | 1,326.77 | 90.00 | 7,920.00 | | 0015 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 8 | LNFT | 100.00 | 800.00 | 20.66 | 165.27 | 325.00 | 2,600.00 | | 0016 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 24 | LNFT | 115.00 | 2,760.00 | 28.99 | 695.86 | 250.00 | 6,000.00 | | 0017 | 701-15-00100 | Concrete Collar | 3 | EACH | 900.00 | 2,700.00 | 173.97 | 521.90 | 1,600.00 | 4,800.00 | | 0018 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 3,500.00 | 10,500.00 | 1,957.09 | 5,871.28 | 3,300.00 | 9,900.00 | | 0019 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 730.00 | 730.00 | 1,130.50 | 1,130.50 | 3,500.00 | 3,500.00 | | 0020 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 49.7 | SQYD | 100.00 | 4,970.00 | 96.07 | 4,774.49 | 225.00 | 11,182.50 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 12,431.51 | 12,431.51 | 36,000.00 | 36,000.00 | | 0022 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 215 | LNFT | 1.00 | 215.00 | 0.67 | 142.98 | 0.60 | 129.00 | | 0023 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.643 | MILE | 1,100.00 | 707.30 | 1,197.00 | 769.67 | 910.00 | 585.13 | | 0024 | 716-01-00100 | Mulch (Vegetative) | 2 | TON | 1,650.00 | 3,300.00 | 1,130.50 | 2,261.00 | 1,300.00 | 2,600.00 | | 0025 | 717-01-00100 | Seeding | 80 | LB | 9.50 | 760.00 | 33.25 | 2,660.00 | 11.00 | 880.00 | | 0026 | 718-01-00100 | Fertilizer | 1,000 | LB | 1.00 | 1,000.00 | 3.99 | 3,990.00 | 0.80 | 800.00 | | 0027 | 726-01-00100 | Bedding Material | 53.8 | CUYD | 72.00 | 3,873.60 | 41.90 | 2,254.02 | 135.00 | 7,263.00 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 40,000.00 | 40,000.00 | 23,275.00 | 23,275.00 | 40,000.00 | 40,000.00 | | 0029 | 729-16-00200 | Object Marker Assembly (Type 2) | 1 | EACH | 200.00 | 200.00 | 266.00 | 266.00 | 95.00 | 95.00 | | 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 234 | EACH | 10.50 | 2,457.00 | 11.97 | 2,800.98 | 10.00 | 2,340.00 | | 0031 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 286 | LNFT | 3.50 | 1,001.00 | 3.99 | 1,141.14 | 3.25 | 929.50 | | 0032 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 215 | LNFT | 12.00 | 2,580.00 | 13.30 | 2,859.50 | 11.00 | 2,365.00 | | 0033 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.851 | MILE | 11,500.00 | 9,786.50 | 13,300.00 | 11,318.30 | 10,200.00 | 8,680.20 | | 0034 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.099 | MILE | 11,800.00 | 1,168.20 | 13,300.00 | 1,316.70 | 10,200.00 | 1,009.80 | | 0035 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 585.00 | 1,170.00 | 665.00 | 1,330.00 | 550.00 | 1,100.00 | | 0036 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 585.00 | 585.00 | 665.00 | 665.00 | 550.00 | 550.00 | | 0037 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 585.00 | 585.00 | 665.00 | 665.00 | 550.00 | 550.00 | | 0038 | 732-05-00100 | Removal of Existing Markings | 0.096 | MILE | 6,100.00 | 585.60 | 6,650.00 | 638.40 | 5,500.00 | 528.00 | | 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 2,660.00 | 2,660.00 | 11,500.00 | 11,500.00 | | 0040 | 806-01-00100 | Deformed Reinforcing Steel | 335.7 | LB | 4.00 | 1,342.80 | 1.01 | 340.16 | 4.00 | 1,342.80 | | 0041 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 23,830 | INLF | 0.30 | 7,149.00 | 0.55 | 13,106.50 | 1.10 | 26,213.00 | | 0042 | NS-700-00140 | Flexible Post Traffic Delineators | 36 | EACH | 125.00 | 4,500.00 | 108.73 | 3,914.19 | 120.00 | 4,320.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 507,577.20 | | 559,031.72 | | 570,928.08 |
|