Bid Tabulations for the Letting of 8/13/2014 LA DOTD Headquarters

Proposal:H.010534.6
Parish:Ascension, East Baton Rouge
Routes:LA 427
Description:LA 427: ASCENSION PARISH LINE - LA 42
Type Construction:GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK.
Estimated Construction Cost:$917,166.04
100046Barber Bros. Contracting Co., L.L.C$830,466.20
200849F. G. Sullivan, Jr. Contractor LLC$996,163.25
300481COASTAL BRIDGE CO., L.L.C.$1,078,689.73


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Barber Bros. Contracting Co., L.L.C
- 2 -
F. G. Sullivan, Jr. Contractor LLC
- 3 -
COASTAL BRIDGE CO., L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-02-06060Removal of Concrete Catch Basin 2     EACH500.001,000.00500.001,000.00750.001,500.00
0002202-02-14500Removal of Guard Rail 532     LNFT10.005,320.006.003,192.0010.005,320.00
0003202-02-32120Removal of Pipe (Side Drain) STA 35+29, STA 35+60, and STA 35+8468     LNFT15.001,020.0010.00680.0045.003,060.00
0004202-02-32120Removal of Pipe (Side Drain) STA 9+4948     LNFT15.00720.0010.00480.0045.002,160.00
0005202-02-38500Removal of Surfacing and Stabilized Base 1,870     SQYD15.0028,050.0020.0037,400.0020.0037,400.00
0006203-05-00100Excavation and Embankment 1     LUMP5,000.005,000.005,000.005,000.0020,000.0020,000.00
0007203-07-00100Borrow (Vehicular Measurement) 395     CUYD30.0011,850.0020.007,900.0018.007,110.00
0008204-05-00100Temporary Sediment Check Dams (Hay) 14     EACH150.002,100.00110.001,540.001.0014.00
0009204-06-00100Temporary Silt Fencing 1,716     LNFT2.003,432.001.753,003.001.502,574.00
0010401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 413     CUYD50.0020,650.0020.008,260.0060.0024,780.00
0011402-01-00100Traffic Maintenance Aggregate (Vehicular Measurement) 50     CUYD50.002,500.00100.005,000.001.0050.00
0012502-01-00100Superpave Asphaltic Concrete 4,012.8   TON80.00321,024.0075.00300,960.00135.00541,728.00
0013502-01-00200Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 338.6   TON120.0040,632.0075.0025,395.005.001,693.00
0014509-01-00100Cold Planing Asphaltic Pavement 10,266     SQYD4.0041,064.005.0051,330.003.0030,798.00
0015509-02-00100Contractor Retained Reclaimed Asphaltic Pavement -266     CUYD0.000.000.000.000.01-2.66
0016510-01-00300Pavement Patching (18" Minimum Thickness) 750     SQYD100.0075,000.00100.0075,000.00140.00105,000.00
0017701-05-01060Side Drain Pipe (24" RCP/PP/CMP) 248     LNFT100.0024,800.0080.0019,840.00100.0024,800.00
0018701-05-02060Side Drain Pipe (Erosion) (24" PP/CMP) 64     LNFT110.007,040.0080.005,120.00110.007,040.00
0019701-10-01060Reinforced Concrete Pipe (Extension) (24") 24     LNFT150.003,600.00130.003,120.00100.002,400.00
0020701-14-00100Cleaning Existing Pipes 200     LNFT20.004,000.0015.003,000.0030.006,000.00
0021701-15-00100Concrete Collar 1     EACH1,200.001,200.001,000.001,000.001,600.001,600.00
0022702-03-00100Catch Basins (CB-01) 11     EACH2,200.0024,200.002,500.0027,500.003,500.0038,500.00
0023702-08-00100Side Drain Safety End (Type I) 1     EACH3,500.003,500.002,500.002,500.003,700.003,700.00
0024704-01-01000Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 91.7   LNFT50.004,585.0040.003,668.0030.002,751.00
0025704-03-00100Blocked Out Guard Rail 237.7   LNFT25.005,942.5020.004,754.0020.004,754.00
0027704-11-00200Guard Rail End Treatment (Tangent) 3     EACH3,000.009,000.002,500.007,500.002,200.006,600.00
0028707-03-00100Combination Concrete Curb and Gutter 12.566 LNFT100.001,256.6075.00942.4560.00753.96
0029713-01-00100Temporary Signs and Barricades 1     LUMP20,000.0020,000.00100,000.00100,000.0030,000.0030,000.00
0030713-02-00300Temporary Pavement Markings (8" Width) 700     LNFT0.50350.000.25175.000.50350.00
0031713-02-00500Temporary Pavement Markings (24" Width) 4,236     LNFT0.502,118.000.502,118.001.004,236.00
0032713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 2.775 MILE300.00832.50500.001,387.50255.00707.63
0033713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 0.852 MILE600.00511.20500.00426.00500.00426.00
0034713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 8.856 MILE400.003,542.40500.004,428.00625.005,535.00
0035713-05-00100Temporary Pavement Legends & Symbols (Arrow) 3     EACH60.00180.0025.0075.0050.00150.00
0036713-05-00300Temporary Pavement Legends & Symbols (ONLY) 3     EACH60.00180.0025.0075.0045.00135.00
0037726-01-00100Bedding Material 137.8   CUYD55.007,579.001.00137.8080.0011,024.00
0038727-01-00100Mobilization 1     LUMP60,000.0060,000.00183,000.00183,000.0075,000.0075,000.00
0039729-16-00200Object Marker Assembly (Type 2) 2     EACH60.00120.0045.0090.0045.0090.00
0040729-16-00300Object Marker Assembly (Type 3) 4     EACH75.00300.0065.00260.0055.00220.00
0041731-02-00100Reflectorized Raised Pavement Markers 334     EACH8.002,672.007.002,338.007.002,338.00
0042732-01-01040Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 215     LNFT2.50537.502.00430.002.00430.00
0043732-01-01080Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) 1,700     LNFT7.0011,900.007.0011,900.007.0011,900.00
0044732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 12     LNFT10.00120.007.0084.007.0084.00
0045732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 2.952 MILE4,000.0011,808.003,500.0010,332.003,500.0010,332.00
0046732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.284 MILE1,000.00284.001,000.00284.00950.00269.80
0047732-03-02040Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) 0.008 MILE6,000.0048.005,000.0040.004,000.0032.00
0048732-04-01080Plastic Pavement Legends and Symbols (Arrow - Left Turn) 1     EACH300.00300.00250.00250.00245.00245.00
0049732-04-15020Plastic Pavement Legends and Symbols (ONLY) 1     EACH350.00350.00250.00250.00250.00250.00
0050732-05-00100Removal of Existing Markings 0.024 MILE10,000.00240.008,000.00192.0010,000.00240.00
0051739-01-00100Hydro-Seeding 2.38  ACRE1,500.003,570.001,300.003,094.001,150.002,737.00
0052740-01-00100Construction Layout 1     LUMP8,500.008,500.0025,000.0025,000.0010,000.0010,000.00
0053NS-200-00020Cleaning Existing Ditches 1,500     LNFT8.0012,000.006.009,000.007.5011,250.00
0054NS-500-00340Saw Cutting Asphaltic Concrete Pavement 16,000     INLF0.508,000.001.0016,000.000.508,000.00
0055NS-700-00240Special Guard Rail Anchor Section 1     EACH1,500.001,500.001,250.001,250.001,250.001,250.00
0056NS-MSC-00120Drainage Structure CB-ADJUST DETAIL; CONVERT CB TO MH3     EACH3,000.009,000.001,800.005,400.00750.002,250.00
0057704-01-01020Guard Rail (Single Thrie Beam) (6'-3" post spacing) 237.5   LNFT65.0015,437.5055.0013,062.5030.007,125.00
           
  CONTRACTOR TOTAL   830,466.20 996,163.25 1,078,689.73