Bid Tabulations for the Letting of 8/13/2014 LA DOTD Headquarters

Proposal:H.009325.6-R1
Parish:St. Tammany
Description:South Channel Fender Repair and Structural Improvements
Type Construction:BRIDGE REPAIRS AND RELATED WORK.
Estimated Construction Cost:$1,563,259.72
126435C.E.C., Inc.$2,031,865.00
237302Double Aught Construction LLC$2,419,952.60
308768PROFESSIONAL CONST. SERVICES, INC.$2,471,757.88


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
C.E.C., Inc.
- 2 -
Double Aught Construction LLC
- 3 -
PROFESSIONAL CONST. SERVICES, INC.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-02-00010Removal of Handrail (Pipe)1     EACH4,200.004,200.0031,200.0031,200.006,500.006,500.00
0002202-02-00010Removal of Handrail (Timber)2     EACH6,000.0012,000.0021,450.0042,900.009,600.0019,200.00
0003202-02-00010Removal of Bridge Components (Existing Steel Spiral Staircase)2     EACH21,000.0042,000.0021,640.0043,280.0016,350.0032,700.00
0004202-02-00010Removal of Walers (Timber)1     EACH24,000.0024,000.0041,100.0041,100.0026,000.0026,000.00
0005202-02-38240Removal of Signs and Supports 4     EACH1,000.004,000.005,200.0020,800.003,500.0014,000.00
0006202-03-00010Relocation of Cameras1     EACH3,000.003,000.0015,000.0015,000.0020,000.0020,000.00
0007712-02-00300Sacked Concrete Revetment (Dry batched) 329.16  SQYD250.0082,290.00820.00269,911.20300.0098,748.00
0008713-01-00100Temporary Signs and Barricades 1     LUMP1,000.001,000.0020,000.0020,000.002,500.002,500.00
0009727-01-00100Mobilization 1     LUMP180,000.00180,000.00150,000.00150,000.00350,000.00350,000.00
0010740-01-00100Construction Layout 1     LUMP5,000.005,000.0020,000.0020,000.0015,000.0015,000.00
0011807-08-00100Structural Metalwork 33,961     LUMP490,000.00490,000.00508,990.00508,990.00548,000.00548,000.00
0012812-01-00200Treated Timber (Coastal Treatment) Handrail for Fender System, Furnish & Install3.84  MFBM25,000.0096,000.0014,400.0055,296.0036,850.00141,504.00
0013812-01-00200Treated Timber (Coastal Treatment) Wire Rope for Fender Pile Cluster, Remove & Replace7.565 MFBM13,000.0098,345.0026,060.00197,143.9023,325.00176,453.63
0014812-01-00200Treated Timber (Coastal Treatment) 3"x8" Decking Boards0.72  MFBM55,000.0039,600.0056,660.0040,795.2089,200.0064,224.00
0015812-01-00200Treated Timber (Coastal Treatment) Pier Protection, Refurbish (Dolphin Rub Rails)1.15  MFBM48,000.0055,200.0066,240.0076,176.0076,225.0087,658.75
0016812-01-00200Treated Timber (Coastal Treatment) Batter Blocking for Fender Piles, Remove & Replace2.33  MFBM46,000.00107,180.00100,000.00233,000.0035,400.0082,482.00
0017812-01-00200Treated Timber (Coastal Treatment) Pier Protection, Refurbish (Fender System Walers and Headers), Furnish and Install2.93  MFBM38,000.00111,340.0028,310.0082,948.3025,750.0075,447.50
0018NS-729-00001Navigational Clearance Gauge (Mounted) 2     EACH15,000.0030,000.0010,000.0020,000.009,000.0018,000.00
0019NS-730-00002Bridge Navigational Lighting System 1     LUMP110,000.00110,000.00120,000.00120,000.00200,000.00200,000.00
0020NS-800-00600Aggregate Fill for Dolphin & Sheet Pile Cells Limestone Only257     TON800.00205,600.00240.0061,680.00780.00200,460.00
0021NS-800-00640Unreinforced Plastic Composite Marine Timbers (12 x 12) 789     LNFT270.00213,030.00308.00243,012.00220.00173,580.00
0022NS-800-00643Unreinforced Plastic Composite Marine Timbers (6 x 12) Remove and Replace96     LNFT480.0046,080.00820.0078,720.00250.0024,000.00
0023NS-805-00020Bridge Substructure Repair Grout Removal and Replacement2     EACH3,500.007,000.006,000.0012,000.007,400.0014,800.00
0024NS-P52-00104Fender Guard Rail System Repair 1     LUMP65,000.0065,000.0036,000.0036,000.0080,500.0080,500.00
           
  CONTRACTOR TOTAL   2,031,865.00 2,419,952.60 2,471,757.88