| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - D & J CONSTRUCTION CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
385   |
SQYD |
20.00 |
7,700.00 |
17.00 |
6,545.00 |
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
750.0 |
LNFT |
7.00 |
5,250.00 |
6.00 |
4,500.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
2,144.9 |
TON |
95.00 |
203,765.50 |
104.00 |
223,069.60 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
240.9 |
TON |
250.00 |
60,225.00 |
325.00 |
78,292.50 |
|
|
|
|
| 508-01 |
asphalt concrete (sma) wearing course
|
1,608.4 |
TON |
140.00 |
225,176.00 |
160.00 |
257,344.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
20,749   |
SQYD |
6.00 |
124,494.00 |
7.50 |
155,617.50 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,729   |
CUYD |
0.10 |
- 172.90 |
0.01 |
- 17.29 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
9,207   |
LNFT |
2.50 |
23,017.50 |
2.75 |
25,319.25 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
6,138   |
LNFT |
2.50 |
15,345.00 |
2.75 |
16,879.50 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
14   |
EACH |
2,000.00 |
28,000.00 |
1,300.00 |
18,200.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
7   |
EACH |
2,500.00 |
17,500.00 |
2,000.00 |
14,000.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
385.2 |
SQYD |
62.00 |
23,882.40 |
50.00 |
19,260.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
750.0 |
LNFT |
35.00 |
26,250.00 |
28.00 |
21,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
75,000.00 |
75,000.00 |
120,000.00 |
120,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
441   |
LNFT |
0.41 |
180.81 |
1.00 |
441.00 |
|
|
|
|
| 713-03-D |
temporary pavement markings (12" width)
|
1,524   |
LNFT |
0.62 |
944.88 |
1.50 |
2,286.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
2,994   |
LNFT |
1.23 |
3,682.62 |
1.75 |
5,239.50 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.268 |
MILE |
190.00 |
810.92 |
185.00 |
789.58 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
4.268 |
MILE |
400.00 |
1,707.20 |
325.00 |
1,387.10 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
8.536 |
MILE |
800.00 |
6,828.80 |
500.00 |
4,268.00 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
12   |
EACH |
100.00 |
1,200.00 |
100.00 |
1,200.00 |
|
|
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
6   |
EACH |
100.00 |
600.00 |
100.00 |
600.00 |
|
|
|
|
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
6   |
EACH |
275.00 |
1,650.00 |
200.00 |
1,200.00 |
|
|
|
|
| 724-01-C |
pavement patching (15" minimum thickness)
|
300   |
SQYD |
200.00 |
60,000.00 |
175.00 |
52,500.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
130,000.00 |
130,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
720   |
EACH |
6.00 |
4,320.00 |
10.00 |
7,200.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
147   |
LNFT |
1.37 |
201.39 |
5.00 |
735.00 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
508   |
LNFT |
2.05 |
1,041.40 |
7.50 |
3,810.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
998   |
LNFT |
4.11 |
4,101.78 |
6.00 |
5,988.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.845 |
MILE |
3,000.00 |
8,535.00 |
4,500.00 |
12,802.50 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.423 |
MILE |
1,000.00 |
1,423.00 |
1,850.00 |
2,632.55 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
4   |
EACH |
200.00 |
800.00 |
500.00 |
2,000.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
200.00 |
400.00 |
500.00 |
1,000.00 |
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
500.00 |
1,000.00 |
750.00 |
1,500.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
7   |
EACH |
900.00 |
6,300.00 |
1,000.00 |
7,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
40,000.00 |
40,000.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| S-001 |
catch basin modification
|
2   |
EACH |
3,500.00 |
7,000.00 |
3,000.00 |
6,000.00 |
|
|
|
|
| S-922 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
15,024   |
LNFT |
2.00 |
30,048.00 |
2.50 |
37,560.00 |
|
|
|
|
| S-923 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
5,000   |
LNFT |
2.00 |
10,000.00 |
2.50 |
12,500.00 |
|
|
|
|
| S-927 |
sawcuts in asphaltic concrete lifts
|
10,000   |
LNFT |
2.00 |
20,000.00 |
2.25 |
22,500.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,193,208.30 |
|
1,378,149.29 |
|
|
|
|
|