Parish(es):St. Tammany, Tangipahoa
Route(s):I-10, I-55, I-59
Description:MAINTENANCE AND OPERATION OF REST AREAS IN DISTRICT 62
Type Construction:MAINTENANCE, OPERATION AND RELATED WORK
Low Bidder:Abita Builders, L.L.C.
Amount:$423,400.00
Estimated Construction Cost:$459,900.00
|
|
|
DBE GOAL 10%
Parish(es):Jefferson
Description:JEFFERSON WESTBANK MISS RIVER LEVEE MULTI-USE PATH 3A
Type Construction:CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, HANDRAILS, AND RELATED WORK.
Low Bidder:Barriere Construction Co., LLC
Amount:$660,606.90
Estimated Construction Cost:$693,997.50
Federal Number:H007475
|
|
|
SBE GOAL 8%
Parish(es):Terrebonne
Route(s):LA 24
Description:LA 24 SIDEWALKS
Type Construction:GRADING, DRAINAGE STRUCTURES, INCIDENTAL CONCRETE PAVEMENT, AND RELATED WORK.
Low Bidder:Byron E. Talbot Contractor, Inc.
Amount:$198,622.98
Estimated Construction Cost:$266,897.65
Federal Number:H007603
|
|
|
DBE GOAL 4%
Parish(es):Bossier
Route(s):LA 2
Description:LA 2: CANEY CREEK BRIDGE TO WEBSTER P/L
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, ASPHALTIC SURFACE TREATMENT, PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Low Bidder:Benton & Brown, LLC.
Amount:$2,629,168.85
Estimated Construction Cost:$2,682,216.53
Federal Number:H009508
|
|
|
DBE GOAL 11%
Parish(es):Lafourche, Terrebonne
Route(s):LA 20
Description:LA 20: LA 648 - JACKSON ST.
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Low Bidder:HUEY P. STOCKSTILL, LLC
Amount:$1,341,661.83
Estimated Construction Cost:$1,580,207.13
Federal Number:H009664
|
|
|
DBE GOAL 3%
Parish(es):Evangeline
Route(s):LA 106
Description:LA 106: LA 13 - US 167
Type Construction:IN-PLACE CEMENT STABILIZED BASE COURSE, SUBGRADE TREATMENT, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Low Bidder:Diamond B Construction Co., L.L.C.
Amount:$3,046,365.58
Estimated Construction Cost:$4,059,752.38
Federal Number:H010223
|
|
|
DBE GOAL 12%
Parish(es):Richland
Route(s):US 425
Description:US 425: JCT I-20 TO JCT US 80
Type Construction:CLEARING AND GRUBBING (SELECTIVE), MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, HANDICAPPED CURB RAMPS, AND RELATED WORK.
Low Bidder:Diamond B Construction Co., L.L.C.
Amount:$1,395,393.65
Estimated Construction Cost:$1,639,229.59
Federal Number:H010395
|
|
|
DBE GOAL 6%
Parish(es):Calcasieu
Route(s):I-210
Description:PRIEN LAKE RE-DECK & SAFETY IMPROVEMENTS
Type Construction:CLEARING AND GRUBBING, GRADING, REMOVAL OF BRIDGE DECK (FULL DEPTH), MILLING ASPHALT PAVEMENT, SUBGRADE TREATMENT, ASPHALT CONCRETE PAVEMENT, DRILLED SHAFT FOUNDATIONS, ROADWAY LIGHTING, METAL WORK, BRIDGE REPAIRS, INTELLIGENT TRANSPORTATION SYSTEM, TEMPORARY QUEUE DETECTION SYSTEM, AND RELATED WORK.
Low Bidder:Kiewit Louisiana Co.
Amount:$35,374,000.00
Estimated Construction Cost:$37,201,640.47
Federal Number:H010916
|
|
|
SBE GOAL 10%
Parish(es):St. Tammany
Description:COVINGTON SIDEWALKS & OTHER SAFETY IMPR
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CONCRETE WALK, AND RELATED WORK.
Low Bidder:Byron E. Talbot Contractor, Inc.
Amount:$225,062.75
Estimated Construction Cost:$382,923.00
Federal Number:H011138
|
|
|
DBE GOAL 8%
Parish(es):Ascension
Route(s):LA 30
Description:LA 30: TURN LANES @ S. PURPERA & S. HODGESON
Type Construction:CLEARING AND GRUBBING, GRADING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, MILLING ASPHALT PAVEMENT, DRAINAGE STRUCTURES, AND RELATED WORK.
Low Bidder:Command Construction Industries LLC
Amount:$794,004.34
Estimated Construction Cost:$968,019.80
Federal Number:H011490
|
|
|
DBE GOAL 6%
Parish(es):Evangeline
Route(s):LA 95
Description:LA 95: LA 104 - LA 29
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, LIME TREATMENT, IN-PLACED CEMENT STABILIZED BASE COURSE, PAVEMENT WIDENING, ASPHALTIC SURFACE TREATMENT, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Low Bidder:Prairie Contractors LLC
Amount:$5,375,913.55
Estimated Construction Cost:$6,376,458.00
Federal Number:H012131
|
|
|
DBE GOAL 4%
Parish(es):Orleans
Route(s):US 90
Description:US 90: FLOODWALL - CHEF PASS BRIDGE
Type Construction:MILLING ASPHALT CONCRETE, MILLING CONCRETE PAVEMENT, ASPHALT CONCRETE OVERLAY, PAVEMENT PATCHING, AND RELATED WORK.
Low Bidder:Boh Bros. Construction Co., LLC.
Amount:$1,861,324.70
Estimated Construction Cost:$2,271,989.80
Federal Number:H012160
|
|
|
DBE GOAL 10%
Parish(es):Jefferson Davis
Route(s):I-10
Description:I-10: LA 99 - ACADIA P/L
Type Construction:GRADING, MILLING ASPHALT CONCRETE, ASPHALT CONCRETE OVERLAY, THIN ASPAHLT CONCRETE (OGFC), CLEANING AND FILLING LONGITUDINAL JOINTS, CONCRETE PIER PROTECTION, AND RELATED WORK.
Low Bidder:COASTAL BRIDGE CO., L.L.C.
Amount:$13,769,669.69
Estimated Construction Cost:$13,216,900.42
Federal Number:H012176
|
|
|
DBE GOAL 11%
Parish(es):Tangipahoa
Route(s):LA 445
Description:LA 445: S END I-12 OVERPASS - US 190
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, CLASS II BASE COURSE, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Low Bidder:Diamond B Construction Co., L.L.C.
Amount:$1,996,073.38
Estimated Construction Cost:$2,069,539.35
Federal Number:H012191
|
|
|
DBE GOAL 10%
Parish(es):Lafourche, Terrebonne
Route(s):US 90
Description:US 90: MEDIAN CABLE BARRIER
Type Construction:GRADING, HIGH TENSION CABLE BARRIER, CONCRETE STRIP, AND RELATED WORK.
Low Bidder:Command Construction Industries LLC
Amount:$3,623,662.00
Estimated Construction Cost:$3,647,664.50
Federal Number:H012377
|
|
|
SBE GOAL 2%
Parish(es):Grant
Route(s):LA 123
Description:LA 123: LA 8 TO US 167
Type Construction:PAVEMENT PATCHING, ASPHALT SURFACE TREATMENT, AND RELATED WORK.
Low Bidder:Dreher Contracting, LLC
Amount:$377,725.79
Estimated Construction Cost:$440,250.05
Federal Number:H012550
|
|
|
SBE GOAL 6%
Parish(es):St. Charles
Route(s):LA 3160
Description:LA 3160: LA 3127 TO LA 18
Type Construction:PAVEMENT PATCHING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, THIN ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Low Bidder:HUEY P. STOCKSTILL, LLC
Amount:$374,973.55
Estimated Construction Cost:$400,221.66
Federal Number:H012552
|
|
|
DBE GOAL 3%
Parish(es):Calcasieu
Route(s):LA 14
Description:LA 14: LA 3186 - 0.793 MI S I-210
Type Construction:THIN ASPHALT CONCRETE (OGFC) PAVEMENT, PAVEMENT REPAIR SYSTEM, AND RELATED WORK.
Low Bidder:Prairie Contractors LLC
Amount:$725,605.35
Estimated Construction Cost:$593,806.82
Federal Number:H012577
|
|
|
DBE GOAL 4%
Parish(es):St. Tammany
Route(s):LA 433
Description:LA 433: BAYOU BONFOUCA GRID DECK REPL
Type Construction:REPLACEMENT OF MOVABLE SPAN GRID FLOORING AND RELATED WORK.
Low Bidder:C.E.C., Inc.
Amount:$533,214.00
Estimated Construction Cost:$674,760.00
Federal Number:H012945
|
|
|
DBE GOAL 11%
Parish(es):LaSalle
Route(s):US 165
Description:US 165 @ US 84: J-TURNS
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Low Bidder:GILCHRIST CONSTRUCTION CO. LLC
Amount:$1,569,862.83
Estimated Construction Cost:$1,571,731.80
Federal Number:H013099
|
|
|
Parish(es):St. Charles
Route(s):LA 631
Description:LA 631 AT CAJUN PARADIS
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Low Bidder:HUEY P. STOCKSTILL, LLC
Amount:$183,183.00
Estimated Construction Cost:$136,729.00
Federal Number:H013241
|
|
|
SBE GOAL 6%
Parish(es):Lafourche
Route(s):LA 316
Description:BAYOU BLUE PONTOON BR ELEC WINCHES
Type Construction:REPLACEMENT OF PONTOON BRIDGE WINCH SYSTEM AND RELATED WORK.
Low Bidder:Sealevel Construction Inc.
Amount:$374,800.00
Estimated Construction Cost:$456,425.00
Federal Number:H013244
|
|
|
DBE GOAL 5%
Parish(es):East Baton Rouge
Route(s):LA 1248
Description:LA 1248: LA 30 - I-10 NORTH C OF A (RT)
Type Construction:MILLING ASPHALT PAVEMENT, CLEANING AND RESEALING PAVEMENT JOINTS, FULL DEPTH PATCHING OF JOINTED CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Low Bidder:Hard Rock Construction LLC
Amount:$2,342,732.35
Estimated Construction Cost:$2,907,493.33
Federal Number:H013318
|
|