Line Number | Item | Description | Unit | Quantity |
0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
0002 | 202-01-00100 | Removal of Structures and Obstructions | LUMP | 1 |
0003 | 202-02-02020 | Removal of Asphalt Pavement | SQYD | 182 |
0004 | 202-02-03010 | Removal of Base – Recycled PCC or Stone | SQYD | 192.5 |
0005 | 202-02-04501 | Removal of Bridge (Timber Trestle with Concrete Deck) | LUMP | 1 |
0006 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | LNFT | 48.7 |
0007 | 202-02-06100 | Removal of Concrete Walks and Drives | SQYD | 67 |
0008 | 203-02-00100 | Drainage Excavation | CUYD | 630 |
0009 | 203-04-00300 | Nonplastic Embankment (Stone) Stone | CUYD | 2 |
0010 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
0011 | 203-08-00100 | Geotextile Fabric | SQYD | 9 |
0012 | 204-02-00100 | Temporary Hay Bales | EACH | 42 |
0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 2 |
0014 | 204-06-00100 | Temporary Silt Fencing | LNFT | 431 |
0015 | 302-02-08070 | Class II Base Course (8" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | SQYD | 165.2 |
0016 | 304-01-00100 | Lime | TON | 2.35 |
0017 | 304-05-00100 | Lime Treatment (Type E) | SQYD | 166 |
0018 | 502-01-00100 | Asphalt Concrete | TON | 237.1 |
0019 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 7.6 |
0020 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 1,464 |
0021 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -82 |
0022 | 701-05-02061 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CMP) | LNFT | 118 |
0023 | 702-04-00100 | Adjusting Manholes | EACH | 2 |
0024 | 706-01-00100 | Concrete Walk (4" Thick) | SQYD | 29 |
0025 | 706-01-00300 | Concrete Walk (6" Thick) | SQYD | 48.8 |
0026 | 706-02-00200 | Concrete Drive (6" Thick) | SQYD | 29.3 |
0027 | 711-01-04000 | Riprap (55 lb, 18" Thick) | SQYD | 900 |
0028 | 711-04-00100 | Geotextile Fabric | SQYD | 900 |
0029 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0030 | 722-02-00100 | Project Site Laboratory (Equipped) | EACH | 2 |
0031 | 726-01-00100 | Bedding Material | CUYD | 10.9 |
0032 | 727-01-00100 | Mobilization | LUMP | 1 |
0033 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 8 |
0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 44 |
0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.654 |
0036 | 739-01-00100 | Hydro-Seeding | ACRE | 0.31 |
0037 | 740-01-00100 | Construction Layout | LUMP | 1 |
0038 | 804-01-00300 | Precast Concrete Piles (16") | LNFT | 3,680 |
0040 | 804-17-00100 | Construction Site Survey | LUMP | 1 |
0041 | 804-18-00100 | Vibration Monitoring | DAY | 16 |
0042 | 805-01-00100 | Class A1 Concrete (Slab Span) | CUYD | 430.2 |
0043 | 805-01-00300 | Class A1 Concrete (Bent Cap) | CUYD | 95.68 |
0044 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | SQFT | 2,441 |
0045 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | SQFT | 6,785 |
0046 | 806-01-00100 | Deformed Reinforcing Steel | LB | 114,302 |
0047 | 810-03-00100 | Concrete and Metal Bridge Railing | LNFT | 480 |
0048 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | SQFT | 1,160 |
0049 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | INLF | 3,119 |
0083 | 804-14-00100 | Dynamic Monitoring Assistance | EACH | 8 |