Line Number | Item | Description | Unit | Quantity |
0001 | 201-01-00200 | Clearing and Grubbing (Selective) | LUMP | 1 |
0002 | 202-02-02020 | Removal of Asphalt Pavement Guard Rail Pads | SQYD | 173.3 |
0003 | 202-02-14500 | Removal of Guard Rail | LNFT | 996 |
0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" pipe | LNFT | 12 |
0005 | 203-01-00100 | General Excavation | CUYD | 759 |
0006 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 2,008.2 |
0007 | 203-10-00100 | Cleaning Existing Ditches | LNFT | 390 |
0008 | 204-06-00100 | Temporary Silt Fencing | LNFT | 4,648 |
0009 | 502-01-00100 | Asphalt Concrete | TON | 6,934.9 |
0010 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 1,135.8 |
0011 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 63,268 |
0012 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -3,239 |
0013 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) | SQYD | 1,114 |
0014 | 701-01-01001 | Cross Drain Pipe (24" RCP) | LNFT | 24 |
0015 | 701-08-00100 | Relaying Pipe 24" RCP | LNFT | 12 |
0016 | 701-15-00100 | Concrete Collar | EACH | 5 |
0017 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | LNFT | 300 |
0018 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | LNFT | 426 |
0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 1,853.8 |
0020 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | EACH | 2 |
0021 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | EACH | 12 |
0022 | 711-01-04020 | Riprap (55 lb, 24" Thick) | SQYD | 160 |
0023 | 711-01-05000 | Riprap (130 lb, 24" Thick) | SQYD | 1,258 |
0024 | 711-02-00300 | Riprap (30 lb) 18" Thickness | CUYD | 14 |
0025 | 711-04-00100 | Geotextile Fabric | SQYD | 1,409 |
0026 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0027 | 713-02-00500 | Temporary Pavement Markings (24" Width) | LNFT | 48 |
0028 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 9.22 |
0029 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 3.216 |
0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 32.552 |
0031 | 716-01-00100 | Mulch (Vegetative) | TON | 11.19 |
0032 | 717-01-00100 | Seeding | LB | 335.6 |
0033 | 718-01-00100 | Fertilizer | LB | 5,594 |
0034 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | MILE | 9.139 |
0035 | 726-01-00100 | Bedding Material | CUYD | 2.6 |
0036 | 727-01-00100 | Mobilization | LUMP | 1 |
0037 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 14 |
0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 1,052 |
0039 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 24 |
0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 16.276 |
0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 1.608 |
0042 | 735-01-00100 | Mailboxes | EACH | 41 |
0043 | 735-02-00100 | Mailbox Supports (Single) | EACH | 29 |
0044 | 735-03-00100 | Mailbox Supports (Double) | EACH | 6 |
0045 | 740-01-00100 | Construction Layout | LUMP | 1 |