Line Number | Item | Description | Unit | Quantity |
0001 | 202-02-06100 | Removal of Concrete Walks and Drives | SQYD | 29 |
0002 | 202-02-14500 | Removal of Guard Rail | LNFT | 762.2 |
0003 | 202-02-26300 | Removal of Median / Island | SQYD | 492 |
0004 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 1,132 |
0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 5,503 |
0006 | 502-01-00100 | Asphalt Concrete | TON | 31,412.3 |
0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 2,436.3 |
0008 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 10,417 |
0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -412 |
0010 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | SQYD | 492 |
0011 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | SQYD | 1,074 |
0012 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | LNFT | 114 |
0013 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 175 |
0014 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 200 |
0015 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | EACH | 8 |
0016 | 706-01-00100 | Concrete Walk (4" Thick) | SQYD | 11 |
0017 | 706-04-00100 | Handicapped Curb Ramps TYPE 2, EXCLUDE FLARE | EACH | 1 |
0018 | 707-04-00100 | Asphalt Curb | LNFT | 54 |
0019 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0020 | 713-02-00300 | Temporary Pavement Markings (8" Width) | LNFT | 1,940 |
0021 | 713-02-00500 | Temporary Pavement Markings (24" Width) | LNFT | 932 |
0022 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 20.562 |
0023 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 20.444 |
0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 43.492 |
0025 | 724-01-00100 | Rumble Strips (Centerline) | MILE | 10.27 |
0026 | 724-03-00100 | Rumble Strips (Intersection) | EACH | 1 |
0027 | 727-01-00100 | Mobilization | LUMP | 1 |
0028 | 729-16-00200 | Object Marker Assembly (Type 2) | EACH | 13 |
0029 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 8 |
0030 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | EACH | 50 |
0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 1,656 |
0032 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | LNFT | 970 |
0033 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 466 |
0034 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 21.746 |
0035 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 10.222 |
0036 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | MILE | 0.117 |
0037 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | MILE | 0.108 |
0038 | 732-04-25020 | Plastic Pavement Legends and Symbols (Yield Line) | EACH | 6 |
0039 | 732-05-00100 | Removal of Existing Markings | MILE | 0.011 |
0040 | 735-01-00100 | Mailboxes | EACH | 71 |
0041 | 735-02-00100 | Mailbox Supports (Single) | EACH | 51 |
0042 | 735-03-00100 | Mailbox Supports (Double) | EACH | 10 |
0043 | 740-01-00100 | Construction Layout | LUMP | 1 |
0044 | NS-401-00100 | Hot-Mix Asphalt Aggregate Surface Course | TON | 1,794 |