Line Number | Item | Description | Unit | Quantity |
0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
0002 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | SQYD | 442.5 |
0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" X 86' CMP | LNFT | 86 |
0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 3 - 96" X 120' CMP | LNFT | 360 |
0005 | 202-02-32120 | Removal of Pipe (Side Drain) 24" X 28' RMP | LNFT | 28 |
0006 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
0007 | 203-10-00100 | Cleaning Existing Ditches | LNFT | 462 |
0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 10 |
0009 | 204-06-00100 | Temporary Silt Fencing | LNFT | 840 |
0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 19 |
0011 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 30 |
0012 | 502-01-00100 | Asphalt Concrete | TON | 100 |
0013 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 980 |
0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -41 |
0015 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | SQYD | 523 |
0016 | 510-02-00100 | Pavement Widening 14" Minimum Thickness | SQYD | 159.4 |
0017 | 701-01-01001 | Cross Drain Pipe (24" RCP) | LNFT | 72 |
0018 | 701-06-00060 | Side Drain Pipe Arch (30" Equiv. RCPA) | LNFT | 104 |
0019 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | LNFT | 152 |
0020 | 711-01-04000 | Riprap (55 lb, 18" Thick) | SQYD | 678 |
0021 | 711-04-00100 | Geotextile Fabric | SQYD | 678 |
0022 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0023 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 0.08 |
0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 0.189 |
0025 | 716-01-00100 | Mulch (Vegetative) | TON | 1.7 |
0026 | 717-01-00100 | Seeding | LB | 68 |
0027 | 718-01-00100 | Fertilizer | LB | 840 |
0028 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | SQYD | 200 |
0029 | 722-02-00100 | Project Site Laboratory (Equipped) | EACH | 1 |
0030 | 726-01-00100 | Bedding Material | CUYD | 156 |
0031 | 727-01-00100 | Mobilization | LUMP | 1 |
0032 | 729-16-00200 | Object Marker Assembly (Type 2) | EACH | 6 |
0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 11 |
0034 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.189 |
0035 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.08 |
0036 | 740-01-00100 | Construction Layout | LUMP | 1 |
0037 | 805-15-01700 | Reinforced Concrete Box Culverts (Precast) (7' x 7') | LNFT | 352 |
0038 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (Including Wingwalls)(46 cu. yd. concrete & 7076 lbs. deformed reinforcing steel) | EACH | 2 |