Line Number | Item | Description | Unit | Quantity |
0001 | 202-02-02020 | Removal of Asphalt Pavement 2" Depth | SQYD | 22,873 |
0002 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | SQYD | 22,873 |
0003 | 202-02-06102 | Removal of Incidental Concrete Paving | SQYD | 133 |
0004 | 202-02-14500 | Removal of Guard Rail | LNFT | 2,563 |
0005 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
0006 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 987 |
0007 | 204-06-00100 | Temporary Silt Fencing | LNFT | 1,600 |
0008 | 302-02-04010 | Class II Base Course (4" Thick) (Asphalt Concrete Base) | SQYD | 27,219.6 |
0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 80 |
0010 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | SQYD | 171 |
0011 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 50 |
0012 | 502-01-00100 | Asphalt Concrete | TON | 41,864.8 |
0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 1,384.5 |
0014 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 283,529 |
0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -13,824 |
0016 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | SQYD | 4,752 |
0017 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 1,587.5 |
0018 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | LNFT | 49 |
0019 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | LNFT | 50 |
0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 200 |
0021 | 704-09-00100 | Guard Rail Anchor Block | EACH | 2 |
0022 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | EACH | 1 |
0023 | 704-10-00110 | Guard Rail End Treatment (Flared 18' - 9" Length) | EACH | 1 |
0024 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | EACH | 9 |
0025 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | EACH | 4 |
0026 | 707-04-00100 | Asphalt Curb | LNFT | 135 |
0027 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0028 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 12.331 |
0029 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 12.331 |
0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 52.977 |
0031 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | EACH | 42 |
0032 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | EACH | 22 |
0033 | 713-05-00240 | Temporary Pavement Legends & Symbols (Arrow - Merge) | EACH | 6 |
0034 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | EACH | 12 |
0035 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | EACH | 12 |
0036 | 713-11-00100 | Portable Changeable Message Signs | EACH | 3 |
0037 | 724-01-00100 | Rumble Strips (Centerline) | MILE | 2.483 |
0038 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | MILE | 9.348 |
0039 | 727-01-00100 | Mobilization | LUMP | 1 |
0040 | 729-16-00200 | Object Marker Assembly (Type 2) | EACH | 33 |
0041 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 15 |
0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 849 |
0043 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | LNFT | 5,094 |
0044 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | LNFT | 1,384 |
0045 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 264 |
0046 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 29.128 |
0047 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 7.789 |
0048 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | MILE | 0.876 |
0049 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | EACH | 19 |
0050 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | EACH | 10 |
0051 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | EACH | 3 |
0052 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | EACH | 6 |
0053 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | EACH | 6 |
0054 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | EACH | 8 |
0055 | 735-01-00100 | Mailboxes | EACH | 5 |
0056 | 735-02-00100 | Mailbox Supports (Single) | EACH | 5 |
0057 | 736-09-00100 | Loop Detector | LNFT | 142 |
0058 | 736-10-00200 | Underground Junction Box (Type E) | EACH | 1 |
0059 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | LNFT | 10 |
0060 | 739-01-00100 | Hydro-Seeding | ACRE | 0.235 |
0061 | 740-01-00100 | Construction Layout | LUMP | 1 |
0062 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | INLF | 600 |