Proposal H.011797.6 Item Summary

Scheduled for Letting 11/18/2020  
   
AMES BLVD (WB EXPY - HAPPY ST)


NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
0001202-02-06100Removal of Concrete Walks and Drives SQYD130
0002202-02-06140Removal of Curbs (Concrete) LNFT42
0003204-02-00100Temporary Hay Bales EACH16
0004502-01-00100Asphalt Concrete (2" Thick Mainline Wearing Course)TON2,005.5
0005502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous TON96.6
0006509-01-00100Milling Asphalt Pavement (3.5" Depth)SQYD10,902
0007510-01-00200Pavement Patching (12" Minimum Thickness) SQYD576
0008602-03-00100Cleaning and Sealing Random cracks LNFT179
0009702-04-00100Adjusting Manholes EACH4
0010702-04-00150Adjusting Manholes w/Manhole Adjustment Rings EACH5
0011702-04-00200Adjusting Catch Basins (Catch Basins and Inlets)EACH20
0012706-01-00200Concrete Walk (5" Thick) SQYD41
0013706-04-00100Handicapped Curb Ramps EACH10
0014707-01-00100Concrete Curb LNFT42
0015713-01-00100Temporary Signs and Barricades LUMP1
0016713-02-00300Temporary Pavement Markings (8" Width) LNFT1,200
0017713-02-00500Temporary Pavement Markings (24" Width) LNFT486
0018713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) MILE2.4
0019713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) MILE2.4
0020713-05-00500Temporary Pavement Legends & Symbols (SCHOOL CROSSING) EACH3
0021727-01-00100Mobilization LUMP1
0022731-02-00100Reflectorized Raised Pavement Markers EACH306
0023732-01-02040Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) LNFT400
0024732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) LNFT275
0025732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) MILE0.8
0026732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) MILE0.8
0027732-04-00001Plastic Pavement Legends and Symbols (Message) (School)EACH1
0028736-09-00100Loop Detector LNFT536
0029740-01-00100Construction Layout LUMP1
0030741-11-00100Adjusting Water Valve EACH8
0031804-18-00100Vibration Monitoring DAY100
0032NS-500-00220Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay LNFT6,000
0033NS-500-00240Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay LNFT4,800
0034NS-MSC-00008Construction Photographs And Video LUMP1