Line Number | Item | Description | Unit | Quantity |
0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
0002 | 202-01-00100 | Removal of Structures and Obstructions | LUMP | 1 |
0003 | 202-02-00020 | Removal of Bridge Superstructure (Timber Deck, Steel Girders, Timber Caps) | SQYD | 128.3 |
0004 | 202-02-00020 | Removal of Pavement, Brick/Concrete Base | SQYD | 262.4 |
0005 | 202-02-00030 | Removal of Curb (Stone, Concrete, & Brick) | LNFT | 196.8 |
0006 | 202-02-12000 | Removal of Fence | LNFT | 35 |
0007 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
0008 | 204-02-00100 | Temporary Hay Bales | EACH | 8 |
0009 | 204-06-00100 | Temporary Silt Fencing | LNFT | 310 |
0010 | 302-02-06020 | Class II Base Course (6" Thick) (Crushed Stone) | SQYD | 322.72 |
0011 | 502-01-00100 | Asphalt Concrete | TON | 69.14 |
0012 | 601-02-00100 | Portland Cement Concrete Pavement (5" Thick) (Crossovers & Turnouts) | SQYD | 29.83 |
0013 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | LNFT | 50 |
0014 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | LNFT | 25 |
0015 | 702-02-00100 | Manholes (MH-06) | EACH | 2 |
0016 | 702-03-00300 | Catch Basins (CB-04) | EACH | 2 |
0017 | 702-03-00500 | Catch Basins (CB-06) | EACH | 2 |
0018 | 702-04-00100 | Adjusting Manholes | EACH | 3 |
0019 | 703-03-00100 | Perforated Pipe Underdrains | LNFT | 50 |
0020 | 705-09-00100 | Rebuilt Fence (Wrought Iron 8' Height) | LNFT | 24 |
0021 | 707-01-00200 | Concrete Curb (Barrier) | LNFT | 6 |
0022 | 707-03-00100 | Combination Concrete Curb and Gutter | LNFT | 191.8 |
0023 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0024 | 714-01-00600 | Slab Sodding (St. Augustine) | SQYD | 204 |
0025 | 716-01-00100 | Mulch (Vegetative) | TON | 1.8 |
0026 | 717-01-00100 | Seeding | LB | 30 |
0027 | 718-01-00100 | Fertilizer | LB | 840 |
0028 | 723-02-00100 | Granular Material (Vehicular Measurement) | CUYD | 142 |
0029 | 726-01-00100 | Bedding Material | CUYD | 9 |
0030 | 727-01-00100 | Mobilization | LUMP | 1 |
0031 | 729-01-00102 | Sign (Type A)(Furnish and Install) | SQFT | 8 |
0032 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 4 |
0033 | 729-21-00100 | U-Channel Post | EACH | 2 |
0034 | 740-01-00100 | Construction Layout | LUMP | 1 |
0035 | 802-01-00100 | Structural Excavation (Bents) | CUYD | 21 |
0036 | 802-01-00202 | Structural Excavation (Type) (Retaining Wall) | CUYD | 90 |
0037 | 805-01-00300 | Class A1 Concrete (Bent Cap) | CUYD | 12.8 |
0038 | 805-01-00600 | Class A1 Concrete (Retaining Wall) | CUYD | 16.4 |
0039 | 806-01-00100 | Deformed Reinforcing Steel | LB | 3,634 |
0040 | 807-01-00200 | Structural Metalwork (Grade 50) | LUMP | 1 |
0041 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | LUMP | 1 |
0042 | 810-04-00100 | Hand Railing (Bicycle Railing) | LNFT | 170 |
0043 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | SFIN | 5 |
0044 | 818-03-00500 | Unreinforced Plastic Composite Marine Timber (Bridge Deck and Between Channels) | LNFT | 1,014 |
0045 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | INLF | 160 |
0046 | NS-700-00011 | Bollard | EACH | 5 |