Line Number | Item | Description | Unit | Quantity |
0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
0002 | 202-01-00100 | Removal of Structures and Obstructions | LUMP | 1 |
0003 | 202-02-02020 | Removal of Asphalt Pavement | SQYD | 708.6 |
0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | SQYD | 708.6 |
0005 | 202-02-04501 | Removal of Bridge (26' X 114' TIMBER TRESTLE BRIDGE) | LUMP | 1 |
0006 | 202-02-32100 | Removal of Pipe (Cross Drain) (18") | LNFT | 30 |
0007 | 203-02-00100 | Drainage Excavation | CUYD | 724 |
0008 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
0009 | 204-02-00100 | Temporary Hay Bales | EACH | 35 |
0010 | 204-06-00100 | Temporary Silt Fencing | LNFT | 769 |
0011 | 302-02-12020 | Class II Base Course (12" Thick) (Crushed Stone) | SQYD | 767 |
0012 | 304-01-00100 | Lime | TON | 2.48 |
0013 | 304-05-00100 | Lime Treatment (Type E) | SQYD | 175 |
0014 | 502-01-00100 | Asphalt Concrete | TON | 206.5 |
0015 | 509-01-00100 | Milling Asphalt Pavement (1.5" AVG. DEPTH) | SQYD | 88 |
0016 | 510-02-00100 | Pavement Widening (12" THICK) | SQYD | 12.8 |
0017 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | LNFT | 8 |
0018 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | LNFT | 131 |
0019 | 701-03-02002 | Storm Drain Pipe (Outfall) (15" RPVCP or 18" CMP) | LNFT | 144 |
0020 | 701-03-02022 | Storm Drain Pipe (Outfall) (18" RPVCP or 24" CMP) | LNFT | 84 |
0021 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | LNFT | 240 |
0022 | 702-03-00100 | Catch Basins (CB-01) | EACH | 5 |
0023 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 50 |
0024 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 100 |
0025 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | EACH | 4 |
0026 | 711-01-04000 | Riprap (55 lb, 18" Thick) | SQYD | 363 |
0027 | 711-04-00100 | Geotextile Fabric | SQYD | 363 |
0028 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0029 | 726-01-00100 | Bedding Material | CUYD | 33.8 |
0030 | 727-01-00100 | Mobilization | LUMP | 1 |
0031 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 4 |
0032 | 739-01-00100 | Hydro-Seeding | ACRE | 0.21 |
0033 | 740-01-00100 | Construction Layout | LUMP | 1 |
0034 | 804-01-00300 | Precast Concrete Piles (16") | LNFT | 2,100 |
0035 | 804-17-00100 | Construction Site Survey | LUMP | 1 |
0036 | 804-18-00100 | Vibration Monitoring | DAY | 12 |
0037 | 805-12-00700 | Bridge Superstructure and Substructure (28' Roadway, 60 Degree Crossing) (CAST-IN-PLACE) | SQFT | 3,360 |
0038 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | SQFT | 1,433 |
0039 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | SQFT | 1,433 |
0040 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) (28' CLEAR ROADWAY, 60 DEG. CROSSING W/ ASPHALT) | SQFT | 580 |
0041 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | INLF | 59 |