Proposal H.013166.6 Item Summary

Scheduled for Letting 04/08/2020  
   
WHITTINGTON ROAD OVER GRAYS CREEK
03/18/2020 - Added to the letting of April 8, 2020.


NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
0001201-01-00100Clearing and Grubbing LUMP1
0002202-01-00100Removal of Structures and Obstructions LUMP1
0003202-02-02020Removal of Asphalt Pavement SQYD708.6
0004202-02-03000Removal of Base – Soil Cement, Asphalt, or BCS SQYD708.6
0005202-02-04501Removal of Bridge (26' X 114' TIMBER TRESTLE BRIDGE)LUMP1
0006202-02-32100Removal of Pipe (Cross Drain) (18")LNFT30
0007203-02-00100Drainage Excavation CUYD724
0008203-05-00100Excavation and Embankment LUMP1
0009204-02-00100Temporary Hay Bales EACH35
0010204-06-00100Temporary Silt Fencing LNFT769
0011302-02-12020Class II Base Course (12" Thick) (Crushed Stone) SQYD767
0012304-01-00100Lime TON2.48
0013304-05-00100Lime Treatment (Type E) SQYD175
0014502-01-00100Asphalt Concrete TON206.5
0015509-01-00100Milling Asphalt Pavement (1.5" AVG. DEPTH)SQYD88
0016510-02-00100Pavement Widening (12" THICK)SQYD12.8
0017701-03-01002Storm Drain Pipe (15" RCP/RPVCP) LNFT8
0018701-03-01022Storm Drain Pipe (18" RCP/RPVCP) LNFT131
0019701-03-02002Storm Drain Pipe (Outfall) (15" RPVCP or 18" CMP) LNFT144
0020701-03-02022Storm Drain Pipe (Outfall) (18" RPVCP or 24" CMP) LNFT84
0021701-17-00100Trench Excavation Safety Protection (Depth >5 feet) LNFT240
0022702-03-00100Catch Basins (CB-01) EACH5
0023704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) LNFT50
0024704-07-00200Guard Rail Transitions (Double Thrie Beam) LNFT100
0025704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) EACH4
0026711-01-04000Riprap (55 lb, 18" Thick) SQYD363
0027711-04-00100Geotextile Fabric SQYD363
0028713-01-00100Temporary Signs and Barricades LUMP1
0029726-01-00100Bedding Material CUYD33.8
0030727-01-00100Mobilization LUMP1
0031729-16-00300Object Marker Assembly (Type 3) EACH4
0032739-01-00100Hydro-Seeding ACRE0.21
0033740-01-00100Construction Layout LUMP1
0034804-01-00300Precast Concrete Piles (16") LNFT2,100
0035804-17-00100Construction Site Survey LUMP1
0036804-18-00100Vibration Monitoring DAY12
0037805-12-00700Bridge Superstructure and Substructure (28' Roadway, 60 Degree Crossing) (CAST-IN-PLACE)SQFT3,360
0038805-18-00100Concrete Finish (Class 2 Rubbed Finish) SQFT1,433
0039805-18-00200Concrete Finish (Class 3 Special Finish) SQFT1,433
0040813-01-00100Concrete Approach Slabs (Cast-in-Place) (28' CLEAR ROADWAY, 60 DEG. CROSSING W/ ASPHALT)SQFT580
0041NS-500-00340Saw Cutting Asphalt Concrete Pavement INLF59