Letting of 3/9/2022 LA DOTD Headquarters

Electronic bids and electronic bid bonds for the following project will be downloaded by the Louisiana Department of Transportation and Development (LA DOTD) on Wednesday, March 09, 2022. Paper bids and paper bid bonds will not be accepted. Electronic bids and electronic bid bonds must be submitted through www.bidx.com prior to the electronic bidding deadline. Beginning at 10:00 a.m., all bids will be downloaded and posted online at http://wwwapps.dotd.la.gov/engineering/lettings/. No bids are accepted after 10:00 a.m. The electronic bid download process is held in LA DOTD Headquarters Building, 1201 Capitol Access Road in Baton Rouge, LA, Room 404 A, and is open to the public. Visitors must check-in with the security desk in the first floor lobby.  

The estimated cost range is for informational purposes only and may be subject to change. The bid prices received from bidders will be evaluated based on the actual estimate value, which will be published at bid opening, for award determination.

Bids must be prepared and submitted in accordance with Section 102 of the 2006 or 2016 Louisiana Standard Specifications for Roads and Bridges as specified in the project bid proposal, and as amended by the project specifications, and must include all information required by the proposal.

ONLINE BIDDER REGISTRATION IS FOR ALL PROSPECTIVE BIDDERS AND FOR OTHERS INTERESTED IN INFORMATION ONLY. Prior to the electronic bid submission deadline, ONLINE BIDDER REGISTRATION for each project bid is REQUIRED. Online Bidder Registration may be accessed via the Internet at wwwsp.dotd.la.gov. Select the following options: BUSINESS Working With DOTD, then Project Letting Info, then Online Bidder Registration.

When completed, a registration confirmation notice will be displayed and may be printed by the bidder. When approved for bidding, the bidder's name will be placed on the "List of Prospective Bidders" located on the LA DOTD Internet website. It is the bidder's responsibility to review the "List of Prospective Bidders" to ensure approval to bid. If a bidder does not register for a project, the bid will not be accepted by LA DOTD. As per Subsection 102.04(e) of the 2006 edition or 102.04.5 of the 2016 edition of the Louisiana Standard Specifications for Roads and Bridges, no bidders will be approved for bid registration within 24 hours before the bid opening. All bidders must register to bid before that deadline.  If further information is required, please contact Mr. Al Simon:  email: Alfonzo.Simon@la.gov, phone: (225) 379-1111, fax: (225) 379-1857

Plans and bid proposals are available in electronic format ONLY.  All Plans, Proposals, Addenda, Amendments, Letters of Clarification, and Withdrawal Notices will be posted online.  Paper notices will not be distributed.

Construction bid proposals (includes specifications) and plans may be accessed via the Internet at wwwsp.dotd.la.gov.  To receive update notifications on specific projects, ONLINE BIDDER RIGISTRATION is required. From the LA DOTD home page, select the following options: BUSINESS Working With DOTD, then Project Letting Info.  Once the Construction Letting Information page appears, find the Notice to Contractors box.  From the drop down menu, select the appropriate letting date and press the "Go To" button to open the page, which provides a listing of all projects to be let and a Construction Proposal Documents link for each project. All project specific notices are found here.  It will be the responsibility of the bidder to check for updates.  Additionally, plans and specifications may be seen at the Project Engineer's office.  Upon request, the Project Engineer will show the project site.

All questions concerning the plans shall be submitted via the Electronic Plans Distribution Center known as Falcon. All submitted questions will be forwarded by email to the Project Manager and the Project Engineer. Questions submitted within a period of 96 hours prior to the advertised time for the opening of bids, excluding Saturdays, Sundays, and any other legal holidays, may not be answered prior to bidding. Falcon may be accessed via the Internet at wwwsp.dotd.la.gov. From the home page, select BUSINESS Working With DOTD, then select Project Letting Info. On the Construction Letting Information page, select the link, DOTD Plan Room (Falcon); Login to Falcon (or request an ID if a first-time user). Once logged in, you will have access to view Project Information, submit a question concerning the project, and view the plans. To avoid any suggestion that a potential bidder is using the Falcon system to communicate with other potential bidders, DOTD will not post any question or any statement of fact or opinion not made for the purpose of seeking clarification of plans and/or specifications. Any non-questions posted on falcon will be limited to the statement of an issue considered unresolved by a previous DOTD response.

Bidders assume the responsibility for accessing the Apparent Bid Results and final Bid Results on the Construction Letting Information web page located at wwwapps.dotd.la.gov/engineering/lettings/ to confirm whether they are the apparent low bidder for any given project and the specific due date of Form CS-6AAA. Apparent Low Bidders on Disadvantaged Business Enterprises (DBE)/Small Business Element (SBE) Goal Projects shall comply fully with the "Required Contract Provisions for DBE/SBE Participation in Federal Aid Construction Contracts (DBE/SBE Goal Project)" contained in Section "F" of the Proposal; and, in accordance therewith, Apparent Low Bidders shall submit the completed Form CS-6AAA and Attachments to the LA DOTD Compliance Programs Office utilizing the list of DBE/SBE Certified Contractors as posted for this letting at http://wwwapps.dotd.la.gov/engineering/lettings/construction.aspx. The award of the contract will be electronically submitted to the successful low bidder on each project.


The U. S. Department of Transportation (DOT) operates a toll free “Hotline” Monday through Friday, 8:00 a.m. to 5:00 p.m., Eastern Time.  Anyone with knowledge of possible  bid rigging, bidder collusion, or other fraudulent activities should call 1-800-424-9071. All information will be treated confidentially and caller anonymity will be respected.  


Download Proposal List Download Proposals with Items

Click the proposal links below to view item details.

Proposal: 4400023731 NORTHERN REG. CONTINGENCY CTR. FOR DISASTER DEBRIS REMOVAL
Specbook: 2016
CONFERENCE NOTICE TO CONTRACTORS PRE-BID CONFERENCE (MANDATORY ATTENDANCE) A mandatory pre-bid conference for this project for all prospective bidders will be held at The DOTD HQ Auditorium on Thursday, March 3, 2022 at 10:00 A.M. All prospective bidders are required to attend. ** THE ATTENDEE SHALL BE A COMPANY EMPLOYEE REPRESENTING NO MORE THAN ONE COMPANY. THE ATTENDEE’S NAME MUST MATCH THE NAME ON THE SIGN-IN SHEET, PROVIDED FOR ADMITTANCE INTO THE PRE-BID CONFERENCE, TO BE CONSIDERED A VALID BIDDER. BEFORE 10 AM ON THE MORNING OF THE BID, THE ATTENDEE REPRESENTING THE PROSPECTIVE BIDDING COMPANY MUST PROVIDE PROOF OF WRITTEN AUTHORIZATION, ON THEIR COMPANY LETTER HEAD, PERMITTING THEIR ATTENDANCE AT THE MANDITORY PRE-BID CONFERENCE. ALL AUTHORIZATION LETTERS MAY BE SUBMITTED TO DANNY.VANOSS@LA.GOV .**

Description of work: contingency contract for the removal, reduction, and disposal of all debris (including but not limited to vegetative, construction and demolition, white goods, etc.) from the louisiana department of transportation and development’s roads, bridges, and rights-of-way (row).
Parish(es): Avoyelles; Bienville; Bossier; Caddo; Caldwell; Catahoula; Claiborne; Concordia; Desoto; East Carroll; Franklin; Grant; Jackson; LaSalle; Lincoln; Madison; Morehouse; Natchitoches; Ouachita; Rapides; Red River; Richland; Sabine; Tensas; Union; Vernon; Webster; West Carroll; Winn
Estimated Construction Cost: $15,000,000 to $20,000,000


Proposal: H.000710.6-R2 COMITE RIVER DIVERSION BRIDGE

H.000710.6-R2 has been postponed to the letting of March 16, 2022.


Proposal: H.001344.6 US 190: LA 437 - US 190 BUS (PH1)
DBE Goal: 11%
OJT Goal: 12 Trainees
Specbook: 2016
ROW clearance is anticipated for 5/31/2022. NTP for construction contract will not be issued until ROW clearance is obtained.

Description of work: clearing and grubbing, grading, drainage structures, milling asphalt concrete, pavement patching, class ii base course, lime treatment, asphalt concrete pavement, precast concrete piles, permanent sheeting (steel), precast prestressed concrete girder spans bridge, drilled shaft foundations, traffic signalization, and related work.
Parish(es): St. Tammany
Route(s): LA 437; US 190
Federal Number: H001344
Estimated Construction Cost: $20,000,000 to $30,000,000


Proposal: H.002184.6 BAYOU CHENAL & BAYOU DISCHARGE BRIDGES

H.002184 has been withdrawn form the letting of March 9, 2022.


Proposal: H.009189.6 I-20: .3 MI E. OF US 79 - LA 371 PAVE MKG
Specbook: 2016

Description of work: plastic pavement striping and related work.
Parish(es): Webster
Route(s): I-20
Federal Number: H009189
Estimated Construction Cost: $250,000 to $500,000


Proposal: H.010430.6 LA 594: TURN LANE @ OUACHITA PAR HIGH
DBE Goal: 5%
Specbook: 2016

Description of work: grading, milling asphalt concrete, pavement patching, pavement widening, asphalt conrete overlay and related work.
Parish(es): Ouachita
Route(s): LA 594
Federal Number: H010430
Estimated Construction Cost: $1,000,000 to $2,500,000


Proposal: H.010922.6 LA 88: REALIGN CURVES IN COTEAU
DBE Goal: 6%
OJT Goal: 2 Trainees
Specbook: 2016

Description of work: clearing and grubbing, grading, drainage structures, milling asphalt concrete, class ii base course, lime treatment, pavement patching, subgrade treatment, asphalt concrete pavement and related work.
Parish(es): Iberia
Route(s): LA 88
Federal Number: H010922
Estimated Construction Cost: $2,500,000 to $5,000,000


Proposal: H.011098.6 LA 30: SOUTH BLVD TO W CHIMES ST
DBE Goal: 9%
OJT Goal: 7 Trainees
Specbook: 2016

Description of work: clearing and grubbing, removal of bridge deck, grading, drainage structures, milling asphalt concrete, pavement patching, class ii base course, asphalt surface treatment, asphalt concrete overlay, portland cement concrete pavement, precast concrete piles, bridge widening, drilled shaft foundations, landscaping, traffic signalization, and related work.
Parish(es): East Baton Rouge
Route(s): LA 30; LA 3290-1; LA 3290-3; LA 3290-4
Federal Number: H011098
Estimated Construction Cost: $10,000,000 to $15,000,000


Proposal: H.011577.6 LA 18: SUNSHINE BR - LA 3120
DBE Goal: 6%
Specbook: 2016

Description of work: drainage structures, milling asphalt concrete, pavement patching, asphalt concrete overlay, and related work.
Parish(es): Ascension; St. James
Route(s): LA 18
Federal Number: H011577
Estimated Construction Cost: $2,500,000 to $5,000,000


Proposal: H.012022.6 BREC: GREENWOOD MULTI-USE TRAIL, PHASE 2
Local Public Agency project
DBE Goal: 15%
OJT Goal: 2 Trainees
Specbook: 2016

Description of work: clearing and grubbing, grading, drainage structures, class ii base course, concrete walks, pedestrian bridge, precast concrete piles, landscaping, and related work.
Parish(es): East Baton Rouge
Federal Number: H012022
Estimated Construction Cost: $1,000,000 to $2,500,000


Proposal: H.012110.6 LA 68: US 61 - LA 964
DBE Goal: 6%
OJT Goal: 3 Trainees
Specbook: 2016

Description of work: clearing and grubbing, grading, drainage structures, milling asphalt concrete, pavement patching, lime treatment, in-place cement stabilized base course, in-place cement treated subgrade, asphalt surface treatment, asphalt concrete overlay, and related work.
Parish(es): East Feliciana
Route(s): LA 68
Federal Number: H012110
Estimated Construction Cost: $5,000,000 to $7,500,000


Proposal: H.012486.6 DISTRICT 08 FLASHING YELLOW ARROW PART I
OJT Goal: 2 Trainees
Specbook: 2016

Description of work: drilled shaft foundations, traffic signalization, and related work.
Parish(es): Avoyelles; Natchitoches; Sabine; Vernon; Winn
Federal Number: H012486
Estimated Construction Cost: $1,000,000 to $2,500,000


Proposal: H.013256.6 I-10 ITS SCOTT TO LAKE CHARLES
DBE Goal: 2%
OJT Goal: 2 Trainees
Specbook: 2016

Description of work: grading, drilled shaft foundations, intelligent transportation system (its) and related work
Parish(es): Acadia; Jefferson Davis; Lafayette
Route(s): I-10
Federal Number: H013256
Estimated Construction Cost: $2,500,000 to $5,000,000


Proposal: H.013360.6 LA 93: US 90 - BENOIT PATIN RD
DBE Goal: 7%
Specbook: 2016
02/16/2022 - Added to the letting of March 9, 2022. PILOT PROJECT This project has been selected as a Density by Non- Destructive Technologies Pilot Project. Special provisions governing requirements can be found in the construction proposal section titled 2021 Density by Non-Destructive Technologies PILOT SPECIAL PROVISION.

Description of work: grading, drainage structures, milling asphalt concrete, pavement patching, subgrade treatment, class ii base course, pavement widening, asphalt concrete overlay, and related work.
Parish(es): Lafayette
Route(s): LA 93
Federal Number: H013360
Estimated Construction Cost: $1,000,000 to $2,500,000


Proposal: H.014154.6 US 90: S. KENNER AVE - LA 18
DBE Goal: 15%
OJT Goal: 5 Trainees
Specbook: 2016
02/10/2022 - Added to the letting of March 9, 2022.

Description of work: clearing and grubbing, grading, drainage structures, milling asphalt concrete, pavement patching, asphalt concrete overlay, and related work.
Parish(es): Jefferson
Route(s): US 90; US 90-Z
Federal Number: H014154
Estimated Construction Cost: $7,500,000 to $10,000,000


Proposal: H.014476.6 LA 135: LA 15 - ANTIOCH ROAD
DBE Goal: 5%
OJT Goal: 2 Trainees
Specbook: 2016

Description of work: clearing and grubbing, grading, drainage structures, milling asphalt concrete, lime treatment, in-place cement stabilized base course, asphalt concrete pavement, and related work.
Parish(es): Richland
Route(s): LA 135
Federal Number: H014476
Estimated Construction Cost: $2,500,000 to $5,000,000


Proposal: H.014490.6 US 190: LA 433 - US 11
DBE Goal: 7%
Specbook: 2016

Description of work: milling asphalt concrete, asphalt concrete overlay, traffic signalization, and related work
Parish(es): St. Tammany
Route(s): US 190
Federal Number: H014490
Estimated Construction Cost: $2,500,000 to $5,000,000


Proposal: H.014750.6 LA 2: LA 2 SPUR TO DORCHEAT BRIDGE
SBE Goal: 6%
Specbook: 2016
02/16/2022 - Added to the letting of March 9, 2022.

Description of work: pavement patching, asphalt surface treatment, and related work.
Parish(es): Webster
Route(s): LA 2
Federal Number: H014750
Estimated Construction Cost: $250,000 to $500,000


Proposal: H.014751.6 LA 1:TURN LANE @ BRANDYWINE-COUNTRY CLUB
DBE Goal: 9%
Specbook: 2016
02/16/2022 - Added to the letting of March 9, 2022.

Description of work: grading, milling asphalt concrete, asphalt concrete pavement, and related work.
Parish(es): Lafourche
Route(s): LA 1
Federal Number: H014751
Estimated Construction Cost: $500,000 to $1,000,000