Projects Under Construction

District 02

    Updated 4 Jul 2022

Districtwide Projects

Jefferson Parish

Note: The estimated completion date is based on the work order date and the contract
days allowed. Unavoidable contingencies and unforeseen events often develop during construction, which may impact the actual completion date.

LA 45 Drainage Improvements
H.002267.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Zzzz Weber, Alan Route: LA 45 map
Contractor: Barriere Construction Co., LLC Miles: 1.01
Work Order Date Contract Amount Estimated Completion Date
2012-04-09 $363,642 Summer of 2012


LA 3134 (Intracoastal Canal-La 45)
H.002953.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Zzzz Weber, Alan Route: LA 3134 map
Contractor: Barriere Construction Co., LLC Miles: 6.70
Work Order Date Contract Amount Estimated Completion Date
2013-11-23 $2,967,635 Fall of 2014


Airline at Clearview Intersection Improv
H.004424.6-R1 - Asphalt overlay of asphalt pavement
Proj. Engr: Duplantis, Michael Route: US 61 LA 3152 map
Contractor: Magee Excavation & Development Miles: 0.72
Work Order Date Contract Amount Estimated Completion Date
2021-07-30 $6,069,774 Fall of 2022


La302: Barataria Br Tug Hit
H.009184-R1 - Moveable bridges reconditioned
Proj. Engr: Zzzz Guidry, John Route: LA 302 map
Contractor: Boh Bros. Construction Co., Ll Miles: 0.10
Work Order Date Contract Amount Estimated Completion Date
2011-07-28 $1,065,897 Fall of 2011


Jean Lafitte: Downtown Sidewalk, Phase 2
H.009753.6 - Sidewalks/bike paths
Proj. Engr: Oustalet, Randy Route: LA 302 map
Contractor: Kass Bros. Inc. Miles: 0.06
Work Order Date Contract Amount Estimated Completion Date
2019-05-28 $263,218 Spring of 2020


US 90z: Westbank Expressway Rehab
H.010017.6 - Bridges reconditioned
Proj. Engr: Hollier, Corbett Route: US 90-Z map
Contractor: Southern Road & Bridge, LLC Miles: 5.50
Work Order Date Contract Amount Estimated Completion Date
2021-12-13 $3,403,382 Beginning of 2024


LA 541 Embankment Repair
H.010621.6 - Embankment repair
Proj. Engr: Capote, Nelson Route: LA 541 map
Contractor: Hard Rock Construction LLC Miles: 0.15
Work Order Date Contract Amount Estimated Completion Date
2013-01-11 $132,590 Summer of 2013


Control Section 249-01 La 45: Barataria Blvd Beautification
H.010644.6 - Landscaping
Proj. Engr: Capote, Nelson Route: LA 45 map
Contractor: Baton Rouge Turf & Landscape, Miles: 1.80
Work Order Date Contract Amount Estimated Completion Date
2013-02-06 $45,000 Spring of 2013


US 90b: Elev Wb Expy-Jung Blvd
H.011311.6 - Asphalt widening and overlay
Proj. Engr: Hollier, Corbett Route: US 90-Z map
Contractor: Barber Bros. Contracting Co., Miles: 0.87
Work Order Date Contract Amount Estimated Completion Date
2019-03-04 $2,611,471 Spring of 2020


Loyola Dr./I-10 Interchange to New Airport Terminal (Lanoia)
H.011670.6 - Planning study
Proj. Engr: Marchand, Wayne Route: I-10 map
Contractor: Gilchrist Construction Company Miles: 0.65
Work Order Date Contract Amount Estimated Completion Date
2019-08-30 $128,070,568 Summer of 2023


LA 541: La 18(Louisiana) - La 18 (4th)
H.012553.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Hollier, Corbett Route: LA 541 map
Contractor: Barriere Construction Co., LLC Miles: 4.61
Work Order Date Contract Amount Estimated Completion Date
2019-05-14 $3,468,461 Spring of 2020


LA 23: Intersection Imp @ Gretna Blvd
H.012596.6 - Traffic flow improvements - formerly turn lanes
Proj. Engr: Hollier, Corbett Route: LA 23 map
Contractor: Barber Bros. Contracting Co., Miles: 0.16
Work Order Date Contract Amount Estimated Completion Date
2020-03-23 $565,162 Summer of 2020


LA 3139: Dickory Ave - Orleans P/L
H.012918.6-R1 - Concrete pavement rehab-grinding/dowell retrofit/should drain install
Proj. Engr: Rizzo, Kevin Route: LA 3139 LA 3154 map
Contractor: Cycle Construction Co. L.L.C. Miles: 4.97
Work Order Date Contract Amount Estimated Completion Date
2022-03-07 $7,763,445 Summer of 2023


US 61: Williams Blvd - RR Overpass
H.013209.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Duplantis, Michael Route: US 61 map
Contractor: Barber Bros. Contracting Co., Miles: 1.24
Work Order Date Contract Amount Estimated Completion Date
2020-08-17 $1,207,896 Summer of 2021


Do2 Drop Inlet Cleaning Us90-Z
H.013417.6 - Drainage
Proj. Engr: Capote, Nelson Route: US 90-Z map
Contractor: Miles: 7.57
Work Order Date Contract Amount Estimated Completion Date
2018-06-06 $323,878 Fall of 2018


New Orleans Airport Interstate Signage
H.013599.6 - Signing
Proj. Engr: Duplantis, Michael Route: I-10 I-310 map
Contractor: Command Construction Industrie Miles: 8.70
Work Order Date Contract Amount Estimated Completion Date
2019-02-19 $2,466,112 Spring of 2020


US 90z: Harvey Tunnel Lighting Repl.
H.013706.6 - Miscellaneous
Proj. Engr: Capote, Nelson Route: US 90-Z map
Contractor: Diamond Electrical Co., Inc. Miles: 0.01
Work Order Date Contract Amount Estimated Completion Date
2020-08-17 $4,932,936 Summer of 2022


LA 3017: 4th St-Lapalco Blvd
H.013745.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Hollier, Corbett Route: LA 3017 map
Contractor: Barriere Construction Co., LLC Miles: 2.68
Work Order Date Contract Amount Estimated Completion Date
2021-04-01 $3,681,076 Fall of 2022


US 90 & La 3046: Mill & Overlay
H.013757.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Rizzo, Kevin Route: US 90 LA 3046 map
Contractor: Barriere Construction Co., LLC Miles: 4.24
Work Order Date Contract Amount Estimated Completion Date
2021-02-02 $6,060,920 Fall of 2021


US 61: Carrollton Ave - Causeway Blvd
H.013762.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Rizzo, Kevin Route: US 61 map
Contractor: Barriere Construction Co., LLC Miles: 3.11
Work Order Date Contract Amount Estimated Completion Date
2021-07-12 $5,214,388 Fall of 2022


I-10: Loyola Bridges (Slab Span Repair)
H.013839.6 - Bridges reconditioned
Proj. Engr: Duplantis, Michael Route: I-10 map
Contractor: Olympus Painting Contractors, Miles: 0.41
Work Order Date Contract Amount Estimated Completion Date
2019-11-28 $699,965 Summer of 2020


LA 18: Barataria Blvd - Louisiana St
H.014076.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Hollier, Corbett Route: LA 18 map
Contractor: Barriere Construction Co., LLC Miles: 2.95
Work Order Date Contract Amount Estimated Completion Date
2022-03-21 $1,437,304 Fall of 2022


LA 428: Wb Lane at La 23
H.014079.6 - Traffic flow improvements - formerly turn lanes
Proj. Engr: Hollier, Corbett Route: LA 428 LA 18 map
Contractor: Buck Town Contractors & Co. Miles: 0.27
Work Order Date Contract Amount Estimated Completion Date
2022-03-14 $886,083 Summer of 2022


LA 3152: Lane Modifications
H.014092.6 - Traffic flow improvements - formerly turn lanes
Proj. Engr: Duplantis, Michael Route: LA 3152 map
Contractor: Barriere Construction Co., LLC Miles: 0.83
Work Order Date Contract Amount Estimated Completion Date
2021-09-23 $1,688,378 Beginning of 2022


LA 23: Lapalco Blvd - Dale Ave
H.014102.6 - Concrete pavement rehab-grinding/dowell retrofit/should drain install
Proj. Engr: Hollier, Corbett Route: LA 23 map
Contractor: Barriere Construction Co., LLC Miles: 0.24
Work Order Date Contract Amount Estimated Completion Date
2022-05-31 $900,777 Beginning of 2023


US 90: S. Kenner Ave - La 18
H.014154.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Hollier, Corbett Route: US 90 map
Contractor: Barriere Construction Co., LLC Miles: 7.53
Work Order Date Contract Amount Estimated Completion Date
2022-05-23 $9,283,548 Summer of 2024


US 90z: West Bank Expwy Pave Markings
H.014387.6 - Striping and pavement markers
Proj. Engr: Hollier, Corbett Route: US 90-Z map
Contractor: Southern Synergy LLC Miles: 9.82
Work Order Date Contract Amount Estimated Completion Date
2021-12-01 $1,646,225 Summer of 2022


LA 45 @ Ronquille St Drainage Repair
H.014566.6 - Drainage
Proj. Engr: Capote, Nelson Route: LA 45 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2021-03-02 $40,243 Spring of 2021


LA 302: Kerner Ferry Bridge Repairs Ph 2
H.014587.6-R1 - Moveable bridges reconditioned
Proj. Engr: Morvant, Chris Route: LA 302 map
Contractor: Miles: 0.12
Work Order Date Contract Amount Estimated Completion Date
2021-07-16 $5,907,837 Summer of 2022


LA 18: Roadway Raising @ Imtt
H.014954.6 - Miscellaneous
Proj. Engr: Herrington, Benny Route: LA 18 map
Contractor: Miles: 0.16
Work Order Date Contract Amount Estimated Completion Date
2022-03-09 $187,420 Spring of 2022


4th St. - US 90b & Weyer Ave. - La 560-2
062-01-0031-R1 - Asphalt overlay of asphalt pavement
Proj. Engr: Capote, Nelson Route: LA 18 map
Contractor: Barriere Construction Co., LLC Miles: 0.50
Work Order Date Contract Amount Estimated Completion Date
2011-02-07 $1,960,756 Summer of 2011


Lafourche Parish

Note: The estimated completion date is based on the work order date and the contract
days allowed. Unavoidable contingencies and unforeseen events often develop during construction, which may impact the actual completion date.

Canal Street Bridge Pedestrian Crossing
H.001486.6 - Sidewalks/bike paths
Proj. Engr: Badeaux, Al Route: LA 20 map
Contractor: Sealevel Construction Inc. Miles: 0.07
Work Order Date Contract Amount Estimated Completion Date
2013-05-23 $563,415 Spring of 2014


LA 1: Leeville to Golden Meadow (Phase 2)
H.008145.6 - New location/replacement of bridge
Proj. Engr: Rogers, Chris Route: LA 1 LA 3235 map
Contractor: James Construction Group LLC Miles: 8.70
Work Order Date Contract Amount Estimated Completion Date
2022-02-08 $464,010,389 Beginning of 2028


West Larose Vertical Lift Bridge Rehabilitation
H.009479.6 - Moveable bridges reconditioned
Proj. Engr: Maurin, Roland Route: LA 1 map
Contractor: C.E.C., Inc. Miles: 1.00
Work Order Date Contract Amount Estimated Completion Date
2015-05-04 $26,237,946 Fall of 2020


LA 1 Toll Plaza Improvements (Electrical)
H.009858.6 - Miscellaneous
Proj. Engr: Zzzz Gisclair, Gary Route: LA 1
Contractor: Ernest P. Breaux Electrical, I Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2012-03-19 $429,065 Spring of 2012


LA 3235: Imp @ La 3162, La 3161 & La 657
H.010688.6 - Asphalt widening and overlay
Proj. Engr: Oncale, Jacob Route: LA 3235 map
Contractor: Huey P. Stockstill, LLC Miles: 2.27
Work Order Date Contract Amount Estimated Completion Date
2019-10-24 $4,791,842 Fall of 2020


LA 654: La 308 - Gheens S. Cut Rd.
H.011517.6 - Drainage
Proj. Engr: Usey, Brandon Route: LA 654 map
Contractor: Barriere Construction Co., LLC Miles: 0.57
Work Order Date Contract Amount Estimated Completion Date
2022-04-04 $460,604 Summer of 2022


Airport Connector Road and Bridge
H.011915.6 - Concrete new pavement
Proj. Engr: Picciola, Joe Route: LA 3235 LA 1 map
Contractor: Sealevel Construction Inc. Miles: 1.13
Work Order Date Contract Amount Estimated Completion Date
2021-08-08 $30,956,316 Summer of 2025


LA 1: La 1 Bridge - Falgout Ln
H.013225.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Usey, Brandon Route: LA 1 map
Contractor: Barriere Construction Co., LLC Miles: 9.74
Work Order Date Contract Amount Estimated Completion Date
2020-08-01 $4,511,913 Spring of 2022


US 90: La 308 - 2.5 Mi E La 182
H.013250.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Oncale, Jacob Route: US 90 map
Contractor: Huey P. Stockstill, LLC Miles: 5.83
Work Order Date Contract Amount Estimated Completion Date
2021-04-22 $5,281,672 Spring of 2022


LA 1: Elson Ln. - La 182
H.014068.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Usey, Brandon Route: LA 1 map
Contractor: Barriere Construction Co., LLC Miles: 4.85
Work Order Date Contract Amount Estimated Completion Date
2021-08-02 $3,360,124 Summer of 2022


LA 308: Theriot Canal - St. Charles Br.
H.014071.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Usey, Brandon Route: LA 308 map
Contractor: Barriere Construction Co., LLC Miles: 4.96
Work Order Date Contract Amount Estimated Completion Date
2022-05-23 $3,049,196 Beginning of 2023


LA 182: Hollywood Canal Bridge Repair
H.014290.6 - Embankment repair
Proj. Engr: Usey, Brandon Route: LA 182 map
Contractor: Miles: 0.04
Work Order Date Contract Amount Estimated Completion Date
2020-04-29 $261,921 Summer of 2020


LA 308 Resurfacing Near Mccloud Rd.
H.014376.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Usey, Brandon Route: LA 308 map
Contractor: Miles: 0.05
Work Order Date Contract Amount Estimated Completion Date
2021-01-14 $46,949 Summer of 2021


Leeville Bridge Curve Barrier Repair
H.014617.6 - Miscellaneous
Proj. Engr: Rogers, Chris Route: LA 1 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2021-05-01 $29,072 Summer of 2021


LA 1:turn Lane @ Brandywine-Country Club
H.014751.6 - Traffic flow improvements - formerly turn lanes
Proj. Engr: Usey, Brandon Route: LA 1 map
Contractor: Barriere Construction Co., LLC Miles: 0.44
Work Order Date Contract Amount Estimated Completion Date
2022-06-30 $984,611 Fall of 2022


La57,3162,661,3087:mb Barrier Rprs(Hbi)
H.014900.6 - Moveable bridges reconditioned
Proj. Engr: Oncale, Jacob Route: LA 3162 LA 57 map
Contractor: C.E.C., Inc. Miles: 0.21
Work Order Date Contract Amount Estimated Completion Date
2022-03-21 $836,000 Summer of 2022


LA 1: Cross Drain Repair 1850' Nw La 182
H.014951.6 - Drainage
Proj. Engr: Usey, Brandon Route: LA 1 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2022-04-04 $136,984 Spring of 2022


LA 316 Culvert 850' Nw La 316 - La 3087
H.014953.6 - Drainage
Proj. Engr: Usey, Brandon Route: LA 316 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2022-01-17 $107,534 Beginning of 2022


Orleans Parish

Note: The estimated completion date is based on the work order date and the contract
days allowed. Unavoidable contingencies and unforeseen events often develop during construction, which may impact the actual completion date.

I-610: (I-10 to St. Bernard Ave.)
H.003134.6-R1 - Asphalt overlay of concrete pavement
Proj. Engr: Guilbeau, Justin Route: I-610 map
Contractor: Barriere Construction Co., LLC Miles: 2.58
Work Order Date Contract Amount Estimated Completion Date
2013-05-21 $7,355,233 Spring of 2014


Ihnc and Algiers Cutoff Bridge Rehab
H.003182.6-R1 - Bridges reconditioned
Proj. Engr: Guilbeau, Justin Route: I-10 LA 407 map
Contractor: Gibson & Associates Inc. Miles: 3.82
Work Order Date Contract Amount Estimated Completion Date
2016-02-26 $10,376,224 Summer of 2017


US 90 Bus: Cccd - Sign Installations
H.005889.6 - Signing
Proj. Engr: Boyle, Scott Route: US 90-Z map
Contractor: Traffic Solutions, Inc. Miles: 0.25
Work Order Date Contract Amount Estimated Completion Date
2013-09-27 $196,862 Spring of 2014


New Orleans Dpw Srts Sidewalk Project
H.009308.6 - Striping and pavement markers
Proj. Engr: Flynn, Mary Route: US 90 map
Contractor: Roubion Roads & Streets LLC Miles: 0.34
Work Order Date Contract Amount Estimated Completion Date
2021-08-09 $1,595,527 Fall of 2022


I-10: No Terminal R/R Br Painting & Cleaning
H.009393.6 - Bridge painting
Proj. Engr: Guilbeau, Justin Route: I-10 map
Contractor: Astron General Contracting, In Miles: 0.01
Work Order Date Contract Amount Estimated Completion Date
2012-09-27 $921,128 Spring of 2013


LA 47: I-10 N. Service Rd. - Bullard Ave.
H.009663.6 - Concrete pavement rehab-grinding/dowell retrofit/should drain install
Proj. Engr: Guilbeau, Justin Route: LA 47 map
Contractor: Roubion Roads & Streets LLC Miles: 2.89
Work Order Date Contract Amount Estimated Completion Date
2017-06-05 $2,273,814 Summer of 2018


I-10: No East Drain Canal Bridge Replace
H.010018.6 - Bridges reconditioned
Proj. Engr: Hamide, Mahmoud Route: I-10 map
Contractor: Brown Industrial Construction, Miles: 2.60
Work Order Date Contract Amount Estimated Completion Date
2020-05-18 $28,436,283 Fall of 2022


LA 1253: Downman Rd - I-10 Frontage Rd
H.010414.6 - Concrete pavement rehab-grinding/dowell retrofit/should drain install
Proj. Engr: Hamide, Mahmoud Route: LA 1253 map
Contractor: Command Construction Industrie Miles: 0.54
Work Order Date Contract Amount Estimated Completion Date
2021-03-05 $539,011 Summer of 2021


Us90z (Bodenger Blvd - Stumpf Blvd)
H.010634.6-R2 - Signing
Proj. Engr: Hollier, Corbett Route: US 90-Z map
Contractor: C.E.C., Inc. Miles: 2.96
Work Order Date Contract Amount Estimated Completion Date
2021-10-18 $9,895,169 Summer of 2023


I-10: Cbd 2 Carrollton - Lafitte Ave
H.011220.6 - Signing
Proj. Engr: Hamide, Mahmoud Route: I-10 map
Contractor: C.E.C., Inc. Miles: 2.86
Work Order Date Contract Amount Estimated Completion Date
2019-06-13 $8,294,737 Spring of 2020


US 11: Lake Pontchartrain Bridge Rehab Phase 2 (Hbi)
H.011705.6 - Moveable bridges reconditioned
Proj. Engr: Guilbeau, Justin Route: US 11 map
Contractor: American Bridge Co. Miles: 4.72
Work Order Date Contract Amount Estimated Completion Date
2018-07-31 $32,983,617 Summer of 2022


I-10 E at I-510 Mm 247 Emergency Barrier Wall Repair
H.011712.6 - Bridges reconditioned
Proj. Engr: Guilbeau, Justin Route: I-10 map
Contractor: D. O'brian Construction, LLC Miles: 0.10
Work Order Date Contract Amount Estimated Completion Date
2015-04-02 $315,993 Summer of 2015


US 90: Floodwall - Chef Pass Bridge
H.012160.6 - Drainage
Proj. Engr: Guilbeau, Justin Route: US 90 map
Contractor: Boh Bros. Construction Co., Ll Miles: 1.51
Work Order Date Contract Amount Estimated Completion Date
2018-08-01 $2,149,058 Beginning of 2019


I-510: S End of Intracoastal Br I-10
H.012590.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Guilbeau, Justin Route: I-510 LA 47 map
Contractor: Barriere Construction Co., LLC Miles: 4.70
Work Order Date Contract Amount Estimated Completion Date
2018-09-24 $5,457,945 Fall of 2019


I-10: Morrison Rd Interchange Lighting
H.012602.6 - Roadway lighting
Proj. Engr: Hamide, Mahmoud Route: I-10 map
Contractor: Diamond Electrical Co., Inc. Miles: 0.87
Work Order Date Contract Amount Estimated Completion Date
2018-11-19 $1,315,289 Beginning of 2021


I-10 Ramps @ La 3019 Int Imp
H.012676.6-R1 - Traffic flow improvements - formerly turn lanes
Proj. Engr: Hamide, Mahmoud Route: LA 3019 I-10 map
Contractor: Barriere Construction Co., LLC Miles: 0.42
Work Order Date Contract Amount Estimated Completion Date
2022-03-14 $1,650,777 Summer of 2022


Pedestrian Crosswalk Enh. (No Ph 2)
H.012682.6 - Signalization
Proj. Engr: Dangelo, Michael Route: US 90-Z US 90 map
Contractor: Jb Group of La, LLC Dba Infras Miles: 10.92
Work Order Date Contract Amount Estimated Completion Date
2021-11-16 $2,602,735 Beginning of 2023


I-10 N Service Rd: Dwyer Rd - Paris Rd
H.012742.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Guilbeau, Justin Route: I-10 map
Contractor: Barber Bros. Contracting Co., Miles: 5.39
Work Order Date Contract Amount Estimated Completion Date
2018-08-13 $1,907,661 Spring of 2019


I-10 S Service Rd: Morrison Rd-Paris Rd
H.012743.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Guilbeau, Justin Route: I-10 map
Contractor: Boh Bros. Construction Co., Ll Miles: 5.04
Work Order Date Contract Amount Estimated Completion Date
2019-04-05 $1,460,824 Fall of 2019


US-90z (I-10 to Magnolia Street)
H.012876.6 - Signing
Proj. Engr: Hamide, Mahmoud Route: US 90-Z US 90 map
Contractor: C.E.C., Inc. Miles: 1.89
Work Order Date Contract Amount Estimated Completion Date
2019-06-13 $8,694,720 Fall of 2020


US 90z (Magnolia Street-Bodenger Blvd)
H.012901.6 - Signing
Proj. Engr: Hamide, Mahmoud Route: US 90-Z map
Contractor: C.E.C., Inc. Miles: 2.51
Work Order Date Contract Amount Estimated Completion Date
2019-08-28 $8,404,027 Beginning of 2021


LA 39: Judge Seeber Br Mech Rehab (Hbi)
H.012956.6 - Moveable bridges reconditioned
Proj. Engr: Hamide, Mahmoud Route: LA 39 map
Contractor: C.E.C., Inc. Miles: 0.24
Work Order Date Contract Amount Estimated Completion Date
2020-04-27 $1,204,113 Beginning of 2021


I-610 E Br Rail Near Mp 4.6 Emerg Repair
H.013167.6-R1 - Guardrails
Proj. Engr: Guilbeau, Justin Route: I-610 map
Contractor: Gibson & Associates Inc. Miles: 0.07
Work Order Date Contract Amount Estimated Completion Date
2018-01-08 $69,655 Beginning of 2018


LA 46: La 39 - St. Bernard P/L
H.013211.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Robert, Joseph Route: LA 46 map
Contractor: Barriere Construction Co., LLC Miles: 3.51
Work Order Date Contract Amount Estimated Completion Date
2021-01-01 $7,694,670 Summer of 2023


D02 Drop Inlet Cleaning
H.013419.6 - Drainage
Proj. Engr: Hamide, Mahmoud Route: I-10 I-610 map
Contractor: Miles: 14.64
Work Order Date Contract Amount Estimated Completion Date
2018-09-04 $330,740 Beginning of 2019


I-10: Crowder Blvd Interstate Lighting
H.013442.6 - Roadway lighting
Proj. Engr: Hamide, Mahmoud Route: I-10 map
Contractor: Jack B. Harper Electrical LLC Miles: 1.06
Work Order Date Contract Amount Estimated Completion Date
2020-06-22 $1,249,577 Summer of 2022


US 90-Z Wb Expwy Curtain Wall Repair
H.013530.6-R1 - Miscellaneous
Proj. Engr: Hollier, Corbett Route: US 90-Z map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2018-09-10 $88,911 Fall of 2018


Remove and Replace Damaged Portions of Concrete Bridge Rails
H.013536.6 - Miscellaneous
Proj. Engr: Hollier, Corbett Route: US 90-Z map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2018-07-12 $49,997 Summer of 2018


I-10: Canal St - St. Philip St
H.013586.6 - Asphalt surface treatment
Proj. Engr: Guilbeau, Justin Route: I-10 map
Contractor: The Truesdell Corporation Miles: 0.69
Work Order Date Contract Amount Estimated Completion Date
2019-09-16 $1,958,610 Spring of 2020


I-10 @ Morrison Rd
H.013587.6-R1 - Asphalt surface treatment
Proj. Engr: Robert, Joseph Route: I-10 map
Contractor: Barriere Construction Co., LLC Miles: 0.68
Work Order Date Contract Amount Estimated Completion Date
2020-05-18 $3,337,264 Beginning of 2021


US 90/ I-10 Service Rd/ La 39 Overlay
H.013746.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Hamide, Mahmoud Route: I-10 US 90 map
Contractor: Barber Bros. Contracting Co., Miles: 3.97
Work Order Date Contract Amount Estimated Completion Date
2020-10-08 $6,820,328 Beginning of 2023


I-10 Pipe Repairs Near Metairie Rd
H.013961.6 - Drainage
Proj. Engr: Hamide, Mahmoud Route: I-10 map
Contractor: Miles: 0.01
Work Order Date Contract Amount Estimated Completion Date
2019-12-09 $307,882 Beginning of 2020


US 90b @ Claiborne Exit Ramp
H.014134.6 - Drainage
Proj. Engr: Hamide, Mahmoud Route: US 90-Z map
Contractor: Command Construction Industrie Miles: 0.15
Work Order Date Contract Amount Estimated Completion Date
2020-08-28 $466,565 Fall of 2020


I-10: Concrete Barrier @ Chef Ramp
H.014155.6 - Miscellaneous
Proj. Engr: Robert, Joseph Route: I-10 map
Contractor: Miles: 0.04
Work Order Date Contract Amount Estimated Completion Date
2020-01-24 $58,765 Beginning of 2020


I-10 Bridge Rail Repair at Downman Exit
H.014172.6 - Miscellaneous
Proj. Engr: Hamide, Mahmoud Route: I-10 map
Contractor: Miles: 0.04
Work Order Date Contract Amount Estimated Completion Date
2020-01-27 $251,097 Spring of 2020


I-10: Ihnc Br - Twin Spans Bridge (Rpms)
H.014296.6 - Striping and pavement markers
Proj. Engr: Robert, Joseph Route: I-10 map
Contractor: Southern Synergy LLC Miles: 15.77
Work Order Date Contract Amount Estimated Completion Date
2021-03-05 $457,000 Summer of 2021


US 90b:la 428 Overpass (Level Appr Slab)
H.014360.6 - Bridges reconditioned
Proj. Engr: Hollier, Corbett Route: US 90-Z map
Contractor: Barriere Construction Co., LLC Miles: 0.02
Work Order Date Contract Amount Estimated Completion Date
2021-07-29 $149,150 Summer of 2021


US 90b Attenuator Repairs
H.014365.6 - Miscellaneous
Proj. Engr: Hollier, Corbett Route: US 90-Z map
Contractor: Miles: 0.03
Work Order Date Contract Amount Estimated Completion Date
2021-02-08 $107,879 Spring of 2021


US 90z: I-10 - Terry Pkwy Exit Pave Mkgs
H.014383.6 - Striping and pavement markers
Proj. Engr: Hollier, Corbett Route: US 90-Z map
Contractor: Southern Synergy LLC Miles: 4.51
Work Order Date Contract Amount Estimated Completion Date
2021-07-04 $1,657,775 Beginning of 2022


I-10 Bridge Rail Near Franklin
H.014437.6 - Miscellaneous
Proj. Engr: Robert, Joseph Route: I-10 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2020-11-05 $41,311 End of 2020


I-10 Barriers: Chef Menteur Hwy-I-510
H.014585.6 - Miscellaneous
Proj. Engr: Robert, Joseph Route: I-10 map
Contractor: Command Construction Industrie Miles: 5.58
Work Order Date Contract Amount Estimated Completion Date
2022-06-10 $8,943,003 Spring of 2023


I-10 Bridge Rail Repair @ St. Roch Ave.
H.014665.6 - Miscellaneous
Proj. Engr: Robert, Joseph Route: I-10 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2021-07-27 $119,750 Summer of 2021


US 90 B @ Simon Bolivar Drain Repair
H.014955.6 - Drainage
Proj. Engr: Roberts, Joseph Route: US 90-Z map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2022-03-07 $70,682 Spring of 2022


Districtwide Painted Traffic Striping
H.014957.6-R1 - Striping and pavement markers
Proj. Engr: Robert, Joseph Route: US 90 map
Contractor: Miles: 14.28
Work Order Date Contract Amount Estimated Completion Date
2022-06-08 $179,030 Spring of 2022


Judge Seeber Bridge Repairs
046-31-0053 - Moveable bridges reconditioned
Proj. Engr: Zzzz Guidry, John Route: LA 39 map
Contractor: Boh Bros. Construction Co., LLC. Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2009-06-26 $8,936,932 Fall of 2010


Leveling Approach Slabs and Improvements
409-02-0018 - Asphalt overlay of asphalt pavement
Proj. Engr: Capote, Nelson Route: LA 406 map
Contractor: Barriere Construction Co., LLC Miles: 0.41
Work Order Date Contract Amount Estimated Completion Date
2011-08-11 $568,388 Fall of 2011


Pontchartrain Pump Station Repairs Due to Hurricane Katrina
450-90-0210 - Drainage
Proj. Engr: Zzzz Wetekamm, Fred Route: I-10
Contractor: Industrial & Mechanical Contr. Ll Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2008-08-04 $1,597,784 End of 2009


Drainage Improvements on I-10
450-90-0242 - Drainage
Proj. Engr: Zzzz Zeringue, Kirk Route: I-10 map
Contractor: Rcs Contractors, Inc. Miles: 5.00
Work Order Date Contract Amount Estimated Completion Date
2011-08-12 $267,345 Summer of 2011


Administration Building Expansion
610-01-0022 - Buildings and grounds excluding rest areas
Proj. Engr: Skoien, Richard W. Route:
Contractor: Jaroy Construction, Inc. Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2008-02-11 $3,799,661 End of 2009


Algiers Cut Off Canal Bridge Lighting Installation
836-08-0072 - Roadway lighting
Proj. Engr: Capote, Nelson Route: LA 407 map
Contractor: Jack B. Harper Contractor, Inc. Miles: 1.19
Work Order Date Contract Amount Estimated Completion Date
2008-02-01 $876,032 Fall of 2008


Plaquemines Parish

Note: The estimated completion date is based on the work order date and the contract
days allowed. Unavoidable contingencies and unforeseen events often develop during construction, which may impact the actual completion date.

Judge Perez Br. Wirerope Repl., Gearbox & Mach. House Repair
H.001390.6 - Moveable bridges reconditioned
Proj. Engr: Capote, Nelson Route: LA 23 map
Contractor: C.E.C., Inc. Miles: 0.01
Work Order Date Contract Amount Estimated Completion Date
2011-10-24 $968,252 Beginning of 2012


LA 23: Belle Chasse Bridge & Tunnel (Hbi)
H.004791.6 - Engineering
Proj. Engr: Heraty, Stephen P. Route: LA 23 map
Contractor: Plenary Infrastructure Belle C Miles: 0.81
Work Order Date Contract Amount Estimated Completion Date
2019-12-20 $179,658,250 Spring of 2026


LA 23: Diamond Rd - 665 Ft S Martin La
H.009223.6-R1 - Concrete pavement rehab-grinding/dowell retrofit/should drain install
Proj. Engr: Capote, Nelson Route: LA 23 map
Contractor: Barriere Construction Co., LLC Miles: 0.71
Work Order Date Contract Amount Estimated Completion Date
2012-10-25 $329,535 Beginning of 2013


LA 23: Tunnel - Russell Dr
H.012560.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Hollier, Corbett Route: LA 23 map
Contractor: Barriere Construction Co., LLC Miles: 4.30
Work Order Date Contract Amount Estimated Completion Date
2021-02-01 $4,772,815 Fall of 2022


La23: Ravenna Rd - Lm 4.040
H.012987.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Hollier, Corbett Route: LA 23 map
Contractor: Miles: 5.68
Work Order Date Contract Amount Estimated Completion Date
2022-01-24 $205,286 Beginning of 2022


LA 406: Lt. Turn Lane at Green Trails Dr
H.014487.6 - Asphalt widening and overlay
Proj. Engr: Hollier, Corbett Route: LA 406 map
Contractor: Buck Town Contractors & Co. Miles: 0.31
Work Order Date Contract Amount Estimated Completion Date
2021-10-11 $1,290,763 Beginning of 2022


LA 39: Braithwaite Drainage Repair
H.014569.6 - Drainage
Proj. Engr: Robert, Joseph Route: LA 39 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2021-03-16 $79,513 Spring of 2021


LA 23: Empire Drainage Repair
H.014570.6 - Drainage
Proj. Engr: Capote, Nelson Route: LA 23 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2021-02-09 $412,028 Spring of 2021


LA 23 Crossdrain 600' S Parish Rd 11
H.014911.6 - Drainage
Proj. Engr: Hollier, Corbett Route: LA 23 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2022-02-07 $458,912 Beginning of 2022


Emergency Dredging of Ostrica Canal
704-38-0011 - Miscellaneous
Proj. Engr: Capote, Nelson Route:
Contractor: Grillot Construction LLC Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2008-02-11 $1,058,050 Beginning of 2009


St. Bernard Parish

Note: The estimated completion date is based on the work order date and the contract
days allowed. Unavoidable contingencies and unforeseen events often develop during construction, which may impact the actual completion date.

Bayou La Loutre Bridge Rehabilitation
H.002562.6 - New location/replacement of bridge
Proj. Engr: Guilbeau, Justin Route: LA 46 map
Contractor: C.E.C., Inc. Miles: 0.04
Work Order Date Contract Amount Estimated Completion Date
2016-10-31 $6,046,006 Spring of 2019


LA 46: Orleans P/L - Paris Rd
H.010406.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Guilbeau, Justin Route: LA 46 map
Contractor: Barber Bros. Contracting Co., Miles: 2.90
Work Order Date Contract Amount Estimated Completion Date
2016-02-15 $3,870,157 Summer of 2017


LA 39: X-Drain Repair @ Debouchel Canal
H.012292.6 - Drainage
Proj. Engr: Guilbeau, Justin Route: LA 39 map
Contractor: Cheniere Construction, Inc. Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2016-02-16 $48,861 Spring of 2016


LA 39 and La 46 Crossdrain Replacements
H.012804.6-R1 - Drainage
Proj. Engr: Guilbeau, Justin Route: LA 46 LA 39 map
Contractor: Boh Bros. Construction Co., Ll Miles: 0.01
Work Order Date Contract Amount Estimated Completion Date
2017-03-06 $579,631 Summer of 2017


LA 47: La 46 - S End of Intracoastal Br
H.013560.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Robert, Joseph Route: LA 47 map
Contractor: Boh Bros. Construction Co., Ll Miles: 4.41
Work Order Date Contract Amount Estimated Completion Date
2020-02-21 $3,868,815 Spring of 2021


St Bernard Bikeways
H.013945.6 - Sidewalks/bike paths
Proj. Engr: Liang, Frank Route: LA 47 map
Contractor: Buck Town Contractors & Co. Miles: 40.06
Work Order Date Contract Amount Estimated Completion Date
2021-06-21 $509,857 Beginning of 2022


LA 46: La 47 - 450' East of Webster
H.014072.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Roberts, Joseph Route: LA 46 map
Contractor: Boh Bros. Construction Co., Ll Miles: 2.69
Work Order Date Contract Amount Estimated Completion Date
2021-09-15 $1,606,384 Beginning of 2022


LA 46: Florissant Hwy Drainage Repair
H.014568.6 - Drainage
Proj. Engr: Roberts, Joseph Route: LA 46 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2021-04-08 $56,680 Spring of 2021


Yscloskey Bridge Rehabilitation- Hurricane Katrina
284-02-0035 - Moveable bridges reconditioned
Proj. Engr: Zzzz Wetekamm, Fred Route: map
Contractor: Coastal Bridge Co., L.L.C. Miles: 0.34
Work Order Date Contract Amount Estimated Completion Date
2007-01-22 $2,724,013 Spring of 2008


St. Charles Parish

Note: The estimated completion date is based on the work order date and the contract
days allowed. Unavoidable contingencies and unforeseen events often develop during construction, which may impact the actual completion date.

US 61: RR Overpass - La 50
H.000320.6-R1 - Asphalt overlay of asphalt pavement
Proj. Engr: Duplantis, Michael Route: US 61 map
Contractor: Barriere Construction Co., LLC Miles: 2.64
Work Order Date Contract Amount Estimated Completion Date
2020-02-03 $4,985,922 Beginning of 2022


US 90: Floodwall - S Kenner Ave
H.012051.6 - Asphalt widening and overlay
Proj. Engr: Hollier, Corbett Route: US 90 map
Contractor: Barriere Construction Co., LLC Miles: 1.57
Work Order Date Contract Amount Estimated Completion Date
2020-05-09 $1,470,825 Fall of 2020


LA 18: Left Turn Lane @ La 3060
H.012600.6 - Traffic flow improvements - formerly turn lanes
Proj. Engr: Herrington, Benny Route: LA 18 map
Contractor: Kcr Contractors, LLC Miles: 0.17
Work Order Date Contract Amount Estimated Completion Date
2019-08-19 $563,450 Fall of 2019


I-310: I-10 to US 90
H.012617.6 - Concrete pavement rehab-grinding/dowell retrofit/should drain install
Proj. Engr: Herrington, Benny Route: I-310 map
Contractor: Boh Bros. Construction Co., Ll Miles: 11.71
Work Order Date Contract Amount Estimated Completion Date
2020-02-24 $10,157,856 Spring of 2022


LA 3127: Right Turn Lane at La 3141
H.012836.6 - Traffic flow improvements - formerly turn lanes
Proj. Engr: Herrington, Benny Route: LA 3127 map
Contractor: Fleming Construction Co., LLC Miles: 0.14
Work Order Date Contract Amount Estimated Completion Date
2019-09-18 $169,800 Beginning of 2020


I-310: Concrete Patch at Sb Mm 9
H.013432.6 - Concrete new pavement
Proj. Engr: Herrington, Benny Route: I-310 map
Contractor: Forby Contracting, Inc. Miles: 0.02
Work Order Date Contract Amount Estimated Completion Date
2019-01-23 $148,762 Spring of 2019


I-10 W Mm 220.6 Bridge Rail Repair
H.014607.6 - Miscellaneous
Proj. Engr: Skoien, Richard Route: I-10 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2021-05-03 $37,071 Spring of 2021


I-310 N.B., S.B. & Ramp Bearing Pad & Joint Seal Replacement
450-36-0035 - Bridges reconditioned
Proj. Engr: Zzzz Weber, Alan Route:
Contractor: Gibson & Associates Inc. Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2011-07-17 $1,356,720 Spring of 2012


Terrebonne Parish

Note: The estimated completion date is based on the work order date and the contract
days allowed. Unavoidable contingencies and unforeseen events often develop during construction, which may impact the actual completion date.

LA 24 & La 316: Company Canal Bridge
H.001498.6 - New location/replacement of bridge
Proj. Engr: Wetekamm, Fred Route: LA 24 LA 316 map
Contractor: James Construction Group LLC Miles: 0.26
Work Order Date Contract Amount Estimated Completion Date
2020-11-04 $28,139,148 Spring of 2025


Bayou Terrebonne Eastside Sidewalk Project
H.007604.6 - Sidewalks/bike paths
Proj. Engr: Caillouet, Melanie Route: LA 24 map
Contractor: Hard Rock Construction LLC Miles: 0.38
Work Order Date Contract Amount Estimated Completion Date
2012-03-29 $192,087 Summer of 2012


LA 24/La 20: La 664 - Ducros Rd
H.010410.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Oncale, Jacob Route: LA 24 LA 20 map
Contractor: Huey P. Stockstill, LLC Miles: 11.89
Work Order Date Contract Amount Estimated Completion Date
2020-07-13 $8,611,840 Fall of 2022


Bayou Terrebonne East Sw Project, Ph 2
H.012026.6 - Sidewalks/bike paths
Proj. Engr: Caillouet, Melanie Route: LA 24 map
Contractor: Gray Construction Corp. Miles: 0.43
Work Order Date Contract Amount Estimated Completion Date
2021-11-15 $115,524 Beginning of 2022


Houma Twin Span Br Exp. Joint Rpr
H.013317.6 - Bridges reconditioned
Proj. Engr: Rogers, Chris Route: LA 24 map
Contractor: Miles: 0.01
Work Order Date Contract Amount Estimated Completion Date
2018-11-21 $58,928 Beginning of 2019


LA 55: Humble Canal to La 58
H.013741.6 - Asphalt overlay of concrete pavement
Proj. Engr: Oncale, Jacob Route: LA 55 map
Contractor: LA Contracting Enterprise LLC Miles: 3.02
Work Order Date Contract Amount Estimated Completion Date
2021-12-06 $1,954,837 Fall of 2022


District 02 Appr Slab Leveling Phase 2
H.013761.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Oncale, Jacob Route: LA 315 LA 24 map
Contractor: Huey P. Stockstill, LLC Miles: 1.01
Work Order Date Contract Amount Estimated Completion Date
2021-04-26 $1,273,477 Fall of 2021


LA 20: Ducros Rd. - La 648
H.014069.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Usey, Brandon Route: LA 20 map
Contractor: Barriere Construction Co., LLC Miles: 1.35
Work Order Date Contract Amount Estimated Completion Date
2022-06-01 $1,585,355 Beginning of 2023


LA 661: Houma Nav Mb Electrical Repair
H.014406.6-R1 - Moveable bridges reconditioned
Proj. Engr: Oncale, Jacob Route: LA 661 map
Contractor: Walter J. Barnes Electric Co., Miles: 0.07
Work Order Date Contract Amount Estimated Completion Date
2022-05-23 $634,000 Beginning of 2023


US 90 @ Gibson Approach Slab
H.014604.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Rogers, Chris Route: US 90 map
Contractor: Miles: 0.06
Work Order Date Contract Amount Estimated Completion Date
2021-07-01 $319,283 Summer of 2021


District 02

No districtwide projects.