Projects Under Construction

District 02

    Updated 24 Apr 2024

Districtwide Projects

Jefferson Parish

Note: The estimated completion date is based on the work order date and the contract
days allowed. Unavoidable contingencies and unforeseen events often develop during construction, which may impact the actual completion date.

LA 45 Drainage Improvements
H.002267.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Zzzz Weber, Alan Route: LA 45 map
Contractor: Barriere Construction Co., LLC Miles: 1.01
Work Order Date Contract Amount Estimated Completion Date
2012-04-09 $363,642 Summer of 2012


LA 3134 (Intracoastal Canal-La 45)
H.002953.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Zzzz Weber, Alan Route: LA 3134 map
Contractor: Barriere Construction Co., LLC Miles: 6.70
Work Order Date Contract Amount Estimated Completion Date
2013-11-23 $2,967,635 Fall of 2014


Airline at Clearview Intersection Improv
H.004424.6-R1 - Asphalt overlay of asphalt pavement
Proj. Engr: Zzzz Duplantis, Michael Route: US 61 LA 3152 map
Contractor: Magee Excavation & Development Miles: 0.72
Work Order Date Contract Amount Estimated Completion Date
2021-07-30 $6,292,208 Beginning of 2023


La302: Barataria Br Tug Hit
H.009184-R1 - Moveable bridges reconditioned
Proj. Engr: Zzzz Guidry, John Route: LA 302 map
Contractor: Boh Bros. Construction Co., Ll Miles: 0.10
Work Order Date Contract Amount Estimated Completion Date
2011-07-28 $1,065,897 Fall of 2011


LA 611-1 & La 611-3: Mill & Overlay
H.010418.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Keller, Gerald Route: LA 611-1 map
Contractor: Madden Gulf Coast, LLC Miles: 2.84
Work Order Date Contract Amount Estimated Completion Date
2023-07-31 $2,761,390 Beginning of 2024


LA 49/Williams Blvd Corridor Improvs.
H.010570.6 - Sidewalks/bike paths
Proj. Engr: Rizzo, Kevin Route: LA 49 map
Contractor: Barriere Construction Co., LLC Miles: 1.15
Work Order Date Contract Amount Estimated Completion Date
2023-09-11 $15,421,730 Fall of 2025


LA 541 Embankment Repair
H.010621.6 - Embankment repair
Proj. Engr: Capote, Nelson Route: LA 541 map
Contractor: Hard Rock Construction LLC Miles: 0.15
Work Order Date Contract Amount Estimated Completion Date
2013-01-11 $132,590 Summer of 2013


Control Section 249-01 La 45: Barataria Blvd Beautification
H.010644.6 - Landscaping
Proj. Engr: Capote, Nelson Route: LA 45 map
Contractor: Baton Rouge Turf & Landscape, Miles: 1.80
Work Order Date Contract Amount Estimated Completion Date
2013-02-06 $45,000 Spring of 2013


Us90z: Harvey Canal Tunnel Rehabilitation
H.010673.6-R1 - Miscellaneous
Proj. Engr: Hollier, Corbett Route: I-910 map
Contractor: C.E.C., Inc. Miles: 0.36
Work Order Date Contract Amount Estimated Completion Date
2023-06-26 $54,251,408 Fall of 2026


Loyola Dr./I-10 Interchange to New Airport Terminal (Lanoia)
H.011670.6 - Planning study
Proj. Engr: Marchand, Wayne Route: I-10 map
Contractor: Gilchrist Construction Company Miles: 0.65
Work Order Date Contract Amount Estimated Completion Date
2019-08-30 $141,647,250 Beginning of 2025


LA 23: Intersection Imp @ Gretna Blvd
H.012596.6 - Traffic flow improvements - formerly turn lanes
Proj. Engr: Hollier, Corbett Route: LA 23 map
Contractor: Barber Bros. Contracting Co., Miles: 0.16
Work Order Date Contract Amount Estimated Completion Date
2020-03-23 $74,971 Summer of 2020


Gretna Downtown Pedestrian Improvements
H.013090.6 - Planning study
Proj. Engr: Branch, Tyler Route: LA 18 map
Contractor: Buck Town Contractors & Co. Miles: 0.05
Work Order Date Contract Amount Estimated Completion Date
2024-02-26 $1,385,939 Fall of 2024


LA 45/La 303 Rosethorne Path (Lafitte)
H.013365.6 - Sidewalks/bike paths
Proj. Engr: Oustalet, Randy Route: LA 303 LA 45 map
Contractor: Gulf States Services, LLC Miles: 1.89
Work Order Date Contract Amount Estimated Completion Date
2023-01-04 $1,497,048 Spring of 2024


Do2 Drop Inlet Cleaning Us90-Z
H.013417.6 - Drainage
Proj. Engr: Capote, Nelson Route: I-910 map
Contractor: Miles: 7.57
Work Order Date Contract Amount Estimated Completion Date
2018-06-06 $323,878 Fall of 2018


US 90z: Harvey Tunnel Lighting Repl.
H.013706.6 - Miscellaneous
Proj. Engr: Capote, Nelson Route: I-910 map
Contractor: Diamond Electrical Co., Inc. Miles: 0.01
Work Order Date Contract Amount Estimated Completion Date
2020-08-17 $6,048,845 Spring of 2023


US 90 & La 3046: Mill & Overlay
H.013757.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Rizzo, Kevin Route: US 90 LA 3046 map
Contractor: Barriere Construction Co., LLC Miles: 4.24
Work Order Date Contract Amount Estimated Completion Date
2021-02-02 $6,156,033 Fall of 2022


I-10 & I-610: Overhead Sign Upgrade
H.013829.6 - Signing
Proj. Engr: Keller, Gerald Route: I-10 map
Contractor: Tlp Construction Co. LLC Miles: 1.92
Work Order Date Contract Amount Estimated Completion Date
2023-09-04 $763,609 Summer of 2024


LA 18: Barataria Blvd - Louisiana St
H.014076.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Hollier, Corbett Route: LA 18 map
Contractor: Barriere Construction Co., LLC Miles: 2.95
Work Order Date Contract Amount Estimated Completion Date
2022-03-21 $2,857,111 Beginning of 2023


LA 428: Wb Lane at La 23
H.014079.6 - Traffic flow improvements - formerly turn lanes
Proj. Engr: Hollier, Corbett Route: LA 428 LA 18 map
Contractor: Buck Town Contractors & Co. Miles: 0.27
Work Order Date Contract Amount Estimated Completion Date
2022-03-14 $933,714 Summer of 2022


LA 3152: Lane Modifications
H.014092.6 - Traffic flow improvements - formerly turn lanes
Proj. Engr: Zzzz Duplantis, Michael Route: LA 3152 map
Contractor: Barriere Construction Co., LLC Miles: 0.83
Work Order Date Contract Amount Estimated Completion Date
2021-09-23 $1,688,378 Beginning of 2022


LA 23: Lapalco Blvd - Dale Ave
H.014102.6 - Concrete pavement rehab-grinding/dowell retrofit/should drain install
Proj. Engr: Hollier, Corbett Route: LA 23 map
Contractor: Barriere Construction Co., LLC Miles: 0.24
Work Order Date Contract Amount Estimated Completion Date
2022-05-31 $1,063,004 Beginning of 2023


US 90: S. Kenner Ave - La 18
H.014154.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Zzzz Herrington, Benny Route: US 90 map
Contractor: Barriere Construction Co., LLC Miles: 7.53
Work Order Date Contract Amount Estimated Completion Date
2022-05-23 $10,668,826 Summer of 2024


LA 48: Huey P - La 49
H.014480.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Zzzz Duplantis, Michael Route: LA 48 map
Contractor: Boh Bros. Construction Co., Ll Miles: 6.23
Work Order Date Contract Amount Estimated Completion Date
2022-09-20 $15,682,462 Summer of 2025


LA 45 @ Ronquille St Drainage Repair
H.014566.6 - Drainage
Proj. Engr: Capote, Nelson Route: LA 45 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2021-03-02 $40,243 Spring of 2021


LA 302: Kerner Ferry Bridge Repairs Ph 2
H.014587.6-R1 - Moveable bridges reconditioned
Proj. Engr: Zzzz Morvant, Chris Route: LA 302 map
Contractor: Miles: 0.12
Work Order Date Contract Amount Estimated Completion Date
2021-07-16 $5,193,245 Summer of 2022


US 61 @ N Elm St
H.014661.6 - Signalization
Proj. Engr: Rizzo, Kevin Route: US 61 map
Contractor: Tlp Construction Co. LLC Miles: 0.02
Work Order Date Contract Amount Estimated Completion Date
2023-08-05 $284,707 Fall of 2023


LA 49:40th St - 550ft N of Veterans Blvd
H.014705.6 - Asphalt widening and overlay
Proj. Engr: Zzzz Duplantis, Michael Route: LA 49 map
Contractor: Barriere Construction Co., LLC Miles: 0.91
Work Order Date Contract Amount Estimated Completion Date
2022-09-26 $3,530,776 Summer of 2023


District 02 Appr Slab Leveling Phase 3
H.014760.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Hollier, Corbett Route: I-910 LA 3017 map
Contractor: Barber Bros. Contracting Co., Miles: 0.19
Work Order Date Contract Amount Estimated Completion Date
2023-06-26 $673,286 Fall of 2023


LA 3154: La 3139 - US 61
H.014853.6 - Concrete pavement rehab-grinding/dowell retrofit/should drain install
Proj. Engr: Rizzo, Kevin Route: LA 3154 map
Contractor: Buck Town Contractors & Co. Miles: 0.77
Work Order Date Contract Amount Estimated Completion Date
2023-07-10 $866,684 End of 2023


LA 18: Roadway Raising @ Imtt
H.014954.6 - Miscellaneous
Proj. Engr: Zzzz Herrington, Benny Route: LA 18 map
Contractor: Miles: 0.16
Work Order Date Contract Amount Estimated Completion Date
2022-03-09 $194,499 Spring of 2022


LA 302: Bayou Barataria Mb Repl Phase 1
H.015028.6 - New location/replacement of moveable bridge
Proj. Engr: Hollier, Corbett Route: LA 302-P LA 302 map
Contractor: Boh Bros. Construction Co., Ll Miles: 0.56
Work Order Date Contract Amount Estimated Completion Date
2023-02-17 $56,088,700 Beginning of 2028


US 90b: Manhattan Blvd to La 45
H.015112.6 - Miscellaneous
Proj. Engr: Hollier, Corbett Route: I-910 map
Contractor: The Truesdell Corporation Miles: 1.44
Work Order Date Contract Amount Estimated Completion Date
2023-05-08 $6,287,668 Summer of 2024


US 90z Sidewalks Westwego
H.015121.6 - Sidewalks/bike paths
Proj. Engr: Hollier, Corbett Route: map
Contractor: Gulf States Services, LLC Miles: 0.60
Work Order Date Contract Amount Estimated Completion Date
2023-08-16 $437,949 Fall of 2023


LA 23 @ Gretna Blvd Intersection Imp
H.015264.6 - Traffic flow improvements - formerly turn lanes
Proj. Engr: Hollier, Corbett Route: LA 23 map
Contractor: Barber Bros. Contracting Co., Miles: 0.16
Work Order Date Contract Amount Estimated Completion Date
2023-10-23 $996,759 Beginning of 2024


4th St. - US 90b & Weyer Ave. - La 560-2
062-01-0031-R1 - Asphalt overlay of asphalt pavement
Proj. Engr: Capote, Nelson Route: LA 18 map
Contractor: Barriere Construction Co., LLC Miles: 0.50
Work Order Date Contract Amount Estimated Completion Date
2011-02-07 $1,960,756 Summer of 2011


Lafourche Parish

Note: The estimated completion date is based on the work order date and the contract
days allowed. Unavoidable contingencies and unforeseen events often develop during construction, which may impact the actual completion date.

Canal Street Bridge Pedestrian Crossing
H.001486.6 - Sidewalks/bike paths
Proj. Engr: Zzzz Badeaux, Al Route: LA 20 map
Contractor: Sealevel Construction Inc. Miles: 0.07
Work Order Date Contract Amount Estimated Completion Date
2013-05-23 $563,415 Spring of 2014


LA 1: Leeville to Golden Meadow (Phase 2)
H.008145.6 - New location/replacement of bridge
Proj. Engr: Gisclair, Gary Route: LA 1 LA 3235 map
Contractor: James Construction Group LLC Miles: 8.70
Work Order Date Contract Amount Estimated Completion Date
2022-02-08 $465,730,247 Beginning of 2028


Acadian Road Roundabout
H.009320.6 - Traffic flow improvements - formerly turn lanes
Proj. Engr: Usey, Brandon Route: LA 20 map
Contractor: LA Contracting Enterprise LLC Miles: 0.52
Work Order Date Contract Amount Estimated Completion Date
2023-04-03 $8,834,149 Summer of 2025


West Larose Vertical Lift Bridge Rehabilitation
H.009479.6 - Moveable bridges reconditioned
Proj. Engr: Maurin, Roland Route: LA 1 map
Contractor: C.E.C., Inc. Miles: 1.00
Work Order Date Contract Amount Estimated Completion Date
2015-05-04 $26,245,702 Fall of 2020


LA 1 Toll Plaza Improvements (Electrical)
H.009858.6 - Miscellaneous
Proj. Engr: Zzzz Gisclair, Gary Route: LA 1
Contractor: Ernest P. Breaux Electrical, I Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2012-03-19 $429,065 Spring of 2012


Airport Connector Road and Bridge
H.011915.6 - Concrete new pavement
Proj. Engr: Picciola, Joe Route: LA 3235 LA 1 map
Contractor: Sealevel Construction Inc. Miles: 1.13
Work Order Date Contract Amount Estimated Completion Date
2021-08-08 $31,003,583 Fall of 2025


LA 182: Hollywood Canal Bridge Repair
H.014290.6 - Embankment repair
Proj. Engr: Usey, Brandon Route: LA 182 map
Contractor: Miles: 0.04
Work Order Date Contract Amount Estimated Completion Date
2020-04-29 $261,921 Summer of 2020


LA 308 Resurfacing Near Mccloud Rd.
H.014376.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Usey, Brandon Route: LA 308 map
Contractor: Miles: 0.05
Work Order Date Contract Amount Estimated Completion Date
2021-01-14 $46,949 Summer of 2021


Leeville Bridge Curve Barrier Repair
H.014617.6 - Miscellaneous
Proj. Engr: Rogers, Chris Route: LA 1 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2021-05-01 $29,072 Summer of 2021


LA 316 Culvert 850' Nw La 316 - La 3087
H.014953.6 - Drainage
Proj. Engr: Usey, Brandon Route: LA 316 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2022-01-17 $107,534 Beginning of 2022


La307 & 3220 Mb Rprs (Kraemer & N. Lckprt)
H.014970.6 - Moveable bridges reconditioned
Proj. Engr: Usey, Brandon Route: LA 307 LA 3220 map
Contractor: Reliant Industrial Solutions L Miles: 0.08
Work Order Date Contract Amount Estimated Completion Date
2024-01-29 $445,200 Fall of 2024


La1 Toll Facility Electrical Repairs
H.014972.6 - ITS and emergency operations
Proj. Engr: Usey, Brandon Route: LA 1 map
Contractor: Ernest P. Breaux Electrical, L Miles: 0.02
Work Order Date Contract Amount Estimated Completion Date
2023-02-22 $242,963 Spring of 2023


La1&657:icww&byu Lafourche Mb Rprs(Hbi)
H.014998.6 - Moveable bridges reconditioned
Proj. Engr: Burgess, Matthew Route: LA 1 LA 657 map
Contractor: C.E.C., Inc. Miles: 0.44
Work Order Date Contract Amount Estimated Completion Date
2023-07-03 $459,328 Spring of 2024


LA 1, La 182, La 654, La 655 Mb Rprs (Hbi)
H.015032.6 - Moveable bridges reconditioned
Proj. Engr: Usey, Brandon Route: LA 182 LA 1 map
Contractor: C.E.C., Inc. Miles: 0.21
Work Order Date Contract Amount Estimated Completion Date
2023-10-30 $559,887 Fall of 2024


La308 & 3162 Mb Rprs (Gldn Mdw & Gall) (Hbi)
H.015034.6 - Moveable bridges reconditioned
Proj. Engr: Usey, Brandon Route: LA 308 LA 3162 map
Contractor: Reliant Industrial Solutions L Miles: 0.09
Work Order Date Contract Amount Estimated Completion Date
2023-10-25 $1,170,980 Fall of 2024


LA 1 Toll System O&m
H.015135.6 - Miscellaneous
Proj. Engr: Heraty, Stephen P. Route: LA 1 map
Contractor: Plenary Infrastructure Belle C Miles: 0.20
Work Order Date Contract Amount Estimated Completion Date
2022-09-27 $9,610,753 Beginning of 2028


US 90 at La 182 Improvements
H.015501.6 - Asphalt new pavement-new roadway/new alignments
Proj. Engr: Burgess, Matthew Route: US 90 LA 182 map
Contractor: Barriere Construction Co., LLC Miles: 0.85
Work Order Date Contract Amount Estimated Completion Date
2023-08-08 $4,768,426 Spring of 2024


LA 1 Culvert Repair at Log Mile 2.344
H.015751 -
Proj. Engr: Usey, Brandon Route: LA 1 map
Contractor: Byron E. Talbot Contractor, In Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2024-01-29 $68,205 Beginning of 2024


Orleans Parish

Note: The estimated completion date is based on the work order date and the contract
days allowed. Unavoidable contingencies and unforeseen events often develop during construction, which may impact the actual completion date.

I-610: (I-10 to St. Bernard Ave.)
H.003134.6-R1 - Asphalt overlay of concrete pavement
Proj. Engr: Guilbeau, Justin Route: I-610 map
Contractor: Barriere Construction Co., LLC Miles: 2.58
Work Order Date Contract Amount Estimated Completion Date
2013-05-21 $7,355,233 Spring of 2014


Ihnc and Algiers Cutoff Bridge Rehab
H.003182.6-R1 - Bridges reconditioned
Proj. Engr: Guilbeau, Justin Route: I-10 LA 407 map
Contractor: Gibson & Associates Inc. Miles: 3.82
Work Order Date Contract Amount Estimated Completion Date
2016-02-26 $10,376,224 Summer of 2017


US 90 Bus: Cccd - Sign Installations
H.005889.6 - Signing
Proj. Engr: Boyle, Scott Route: I-910 map
Contractor: Traffic Solutions, Inc. Miles: 0.25
Work Order Date Contract Amount Estimated Completion Date
2013-09-27 $196,862 Spring of 2014


I-10: US 90z - I-610 Pavement Markings
H.009186.6 - Striping and pavement markers
Proj. Engr: Hamide, Mahmoud Route: I-10 map
Contractor: Stripe-a-Zone, LLC Miles: 4.22
Work Order Date Contract Amount Estimated Completion Date
2023-06-27 $1,365,724 End of 2023


New Orleans Dpw Srts Sidewalk Project
H.009308.6 - Striping and pavement markers
Proj. Engr: Flynn, Mary Route: US 90 map
Contractor: Roubion Roads & Streets LLC Miles: 0.34
Work Order Date Contract Amount Estimated Completion Date
2021-08-09 $1,566,817 Spring of 2023


I-10: No Terminal R/R Br Painting & Cleaning
H.009393.6 - Bridge painting
Proj. Engr: Guilbeau, Justin Route: I-10 map
Contractor: Astron General Contracting, In Miles: 0.01
Work Order Date Contract Amount Estimated Completion Date
2012-09-27 $921,128 Spring of 2013


LA 47: I-10 N. Service Rd. - Bullard Ave.
H.009663.6 - Concrete pavement rehab-grinding/dowell retrofit/should drain install
Proj. Engr: Guilbeau, Justin Route: LA 47 map
Contractor: Roubion Roads & Streets LLC Miles: 2.89
Work Order Date Contract Amount Estimated Completion Date
2017-06-05 $2,273,814 Summer of 2018


I-10: No East Drain Canal Bridge Replace
H.010018.6 - Bridges reconditioned
Proj. Engr: Hamide, Mahmoud Route: I-10 map
Contractor: Brown Industrial Construction, Miles: 2.60
Work Order Date Contract Amount Estimated Completion Date
2020-05-18 $29,061,695 Spring of 2023


LA 1253: Downman Rd - I-10 Frontage Rd
H.010414.6 - Concrete pavement rehab-grinding/dowell retrofit/should drain install
Proj. Engr: Hamide, Mahmoud Route: LA 1253 map
Contractor: Command Construction Industrie Miles: 0.54
Work Order Date Contract Amount Estimated Completion Date
2021-03-05 $539,011 Summer of 2021


Us90z (Bodenger Blvd - Stumpf Blvd)
H.010634.6-R2 - Signing
Proj. Engr: Hollier, Corbett Route: I-910 map
Contractor: C.E.C., Inc. Miles: 2.96
Work Order Date Contract Amount Estimated Completion Date
2021-10-18 $10,047,590 Summer of 2023


I-10: Cbd 2 Carrollton - Lafitte Ave
H.011220.6 - Signing
Proj. Engr: Hamide, Mahmoud Route: I-10 map
Contractor: C.E.C., Inc. Miles: 2.86
Work Order Date Contract Amount Estimated Completion Date
2019-06-13 $11,232,830 Fall of 2021


I-10: N.O. Cbd 5 (I-510 to End of Twin Span)
H.011223.6 - Signing
Proj. Engr: Hamide, Mahmoud Route: I-10 map
Contractor: Traffic Commander, LLC Miles: 14.07
Work Order Date Contract Amount Estimated Completion Date
2023-01-23 $4,303,604 Summer of 2024


I-10 E at I-510 Mm 247 Emergency Barrier Wall Repair
H.011712.6 - Bridges reconditioned
Proj. Engr: Guilbeau, Justin Route: I-10 map
Contractor: D. O'brian Construction, LLC Miles: 0.10
Work Order Date Contract Amount Estimated Completion Date
2015-04-02 $315,993 Summer of 2015


LA 47: Iwgo Bridge Rehabilitation (Hbi)
H.011965.6 - Bridge painting
Proj. Engr: Thomas, Tim Route: LA 47 map
Contractor: Vimas Painting Company Inc. Miles: 1.28
Work Order Date Contract Amount Estimated Completion Date
2022-12-05 $44,896,796 Spring of 2027


US 90: Press to Majestic Oaks
H.012312.6 - Planning study
Proj. Engr: Robert, Joseph Route: US 90 map
Contractor: Boh Bros. Construction Co., Ll Miles: 1.04
Work Order Date Contract Amount Estimated Completion Date
2022-08-30 $4,424,654 Spring of 2023


I-510: S End of Intracoastal Br I-10
H.012590.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Guilbeau, Justin Route: I-510 LA 47 map
Contractor: Barriere Construction Co., LLC Miles: 4.70
Work Order Date Contract Amount Estimated Completion Date
2018-09-24 $5,457,945 Fall of 2019


I-10: Paris Rd - Lake Pontchartrain
H.012591.6 - Asphalt overlay of concrete pavement
Proj. Engr: Robert, Joseph Route: I-10 map
Contractor: Madden Gulf Coast, LLC Miles: 8.18
Work Order Date Contract Amount Estimated Completion Date
2023-06-01 $16,385,112 Summer of 2024


I-10 Ramps @ La 3019 Int Imp
H.012676.6-R1 - Traffic flow improvements - formerly turn lanes
Proj. Engr: Hamide, Mahmoud Route: LA 3019 I-10 map
Contractor: Barriere Construction Co., LLC Miles: 0.42
Work Order Date Contract Amount Estimated Completion Date
2022-03-14 $1,769,166 Beginning of 2023


Pedestrian Crosswalk Enh. (No Ph 2)
H.012682.6 - Signalization
Proj. Engr: Foley, John Route: I-910 US 90 map
Contractor: Jb Group of La, LLC Dba Infras Miles: 10.92
Work Order Date Contract Amount Estimated Completion Date
2021-11-16 $755,119 Beginning of 2023


I-10 N Service Rd: Dwyer Rd - Paris Rd
H.012742.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Guilbeau, Justin Route: I-10 map
Contractor: Barber Bros. Contracting Co., Miles: 5.39
Work Order Date Contract Amount Estimated Completion Date
2018-08-13 $1,907,661 Spring of 2019


I-10 S Service Rd: Morrison Rd-Paris Rd
H.012743.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Guilbeau, Justin Route: I-10 map
Contractor: Boh Bros. Construction Co., Ll Miles: 5.04
Work Order Date Contract Amount Estimated Completion Date
2019-04-05 $1,460,824 Fall of 2019


US 90z (Magnolia Street-Bodenger Blvd)
H.012901.6 - Signing
Proj. Engr: Hamide, Mahmoud Route: I-910 map
Contractor: C.E.C., Inc. Miles: 2.51
Work Order Date Contract Amount Estimated Completion Date
2019-08-28 $635,680 Beginning of 2021


LA 39: Judge Seeber Br Mech Rehab (Hbi)
H.012956.6 - Moveable bridges reconditioned
Proj. Engr: Hamide, Mahmoud Route: LA 39 map
Contractor: C.E.C., Inc. Miles: 0.24
Work Order Date Contract Amount Estimated Completion Date
2020-04-27 $1,733,684 Beginning of 2021


I-610 E Br Rail Near Mp 4.6 Emerg Repair
H.013167.6-R1 - Guardrails
Proj. Engr: Guilbeau, Justin Route: I-610 map
Contractor: Gibson & Associates Inc. Miles: 0.07
Work Order Date Contract Amount Estimated Completion Date
2018-01-08 $69,655 Beginning of 2018


LA 46: La 39 - St. Bernard P/L
H.013211.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Robert, Joseph Route: LA 46 map
Contractor: Barriere Construction Co., LLC Miles: 3.51
Work Order Date Contract Amount Estimated Completion Date
2021-01-01 $7,803,231 Spring of 2024


D02 Drop Inlet Cleaning
H.013419.6 - Drainage
Proj. Engr: Hamide, Mahmoud Route: I-10 I-610 map
Contractor: Miles: 14.64
Work Order Date Contract Amount Estimated Completion Date
2018-09-04 $330,740 Beginning of 2019


US 90-Z Wb Expwy Curtain Wall Repair
H.013530.6-R1 - Miscellaneous
Proj. Engr: Hollier, Corbett Route: I-910 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2018-09-10 $88,911 Fall of 2018


Remove and Replace Damaged Portions of Concrete Bridge Rails
H.013536.6 - Miscellaneous
Proj. Engr: Hollier, Corbett Route: I-910 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2018-07-12 $49,997 Summer of 2018


I-10: Canal St - St. Philip St
H.013586.6 - Asphalt surface treatment
Proj. Engr: Guilbeau, Justin Route: I-10 map
Contractor: The Truesdell Corporation Miles: 0.69
Work Order Date Contract Amount Estimated Completion Date
2019-09-16 $1,958,610 Spring of 2020


I-10 @ Morrison Rd
H.013587.6-R1 - Asphalt surface treatment
Proj. Engr: Robert, Joseph Route: I-10 map
Contractor: Barriere Construction Co., LLC Miles: 0.68
Work Order Date Contract Amount Estimated Completion Date
2020-05-18 $3,337,264 Beginning of 2021


I-10: I-610e Interchange Lighting
H.013617.6 - Roadway lighting
Proj. Engr: Roberts, Joseph Route: I-10 I-610 map
Contractor: Diamond Electrical Co., Inc. Miles: 1.20
Work Order Date Contract Amount Estimated Completion Date
2022-09-23 $4,725,093 Summer of 2025


US 90/ I-10 Service Rd/ La 39 Overlay
H.013746.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Hamide, Mahmoud Route: I-10 US 90 map
Contractor: Barber Bros. Contracting Co., Miles: 3.97
Work Order Date Contract Amount Estimated Completion Date
2020-10-08 $6,969,328 Beginning of 2023


I-10 Pipe Repairs Near Metairie Rd
H.013961.6 - Drainage
Proj. Engr: Hamide, Mahmoud Route: I-10 map
Contractor: Miles: 0.01
Work Order Date Contract Amount Estimated Completion Date
2019-12-09 $307,882 Beginning of 2020


LA 3021: La 39 - US 90
H.014097.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Robert, Joseph Route: LA 3021 map
Contractor: Boh Bros. Construction Co., Ll Miles: 1.80
Work Order Date Contract Amount Estimated Completion Date
2022-09-26 $6,650,764 Summer of 2024


US 90b @ Claiborne Exit Ramp
H.014134.6 - Drainage
Proj. Engr: Hamide, Mahmoud Route: I-910 map
Contractor: Command Construction Industrie Miles: 0.15
Work Order Date Contract Amount Estimated Completion Date
2020-08-28 $466,565 Fall of 2020


I-10: Concrete Barrier @ Chef Ramp
H.014155.6 - Miscellaneous
Proj. Engr: Robert, Joseph Route: I-10 map
Contractor: Miles: 0.04
Work Order Date Contract Amount Estimated Completion Date
2020-01-24 $58,765 Beginning of 2020


I-10 Bridge Rail Repair at Downman Exit
H.014172.6 - Miscellaneous
Proj. Engr: Hamide, Mahmoud Route: I-10 map
Contractor: Miles: 0.04
Work Order Date Contract Amount Estimated Completion Date
2020-01-27 $251,097 Spring of 2020


I-10: Ihnc Br - Twin Spans Bridge (Rpms)
H.014296.6 - Striping and pavement markers
Proj. Engr: Robert, Joseph Route: I-10 map
Contractor: Southern Synergy LLC Miles: 15.77
Work Order Date Contract Amount Estimated Completion Date
2021-03-05 $428,815 Summer of 2021


US 90b Attenuator Repairs
H.014365.6 - Miscellaneous
Proj. Engr: Hollier, Corbett Route: I-910 map
Contractor: Miles: 0.03
Work Order Date Contract Amount Estimated Completion Date
2021-02-08 $107,879 Spring of 2021


I-10 Bridge Rail Near Franklin
H.014437.6 - Miscellaneous
Proj. Engr: Robert, Joseph Route: I-10 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2020-11-05 $41,311 End of 2020


I-10 Barriers: Chef Menteur Hwy-I-510
H.014585.6 - Miscellaneous
Proj. Engr: Robert, Joseph Route: I-10 map
Contractor: Command Construction Industrie Miles: 5.58
Work Order Date Contract Amount Estimated Completion Date
2022-06-10 $9,215,358 Summer of 2023


I-10 Bridge Rail Repair @ St. Roch Ave.
H.014665.6 - Miscellaneous
Proj. Engr: Robert, Joseph Route: I-10 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2021-07-27 $119,750 Summer of 2021


US 90 B @ Simon Bolivar Drain Repair
H.014955.6 - Drainage
Proj. Engr: Roberts, Joseph Route: I-910 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2022-03-07 $70,682 Spring of 2022


Districtwide Painted Traffic Striping
H.014957.6-R1 - Striping and pavement markers
Proj. Engr: Robert, Joseph Route: US 90 map
Contractor: Miles: 14.28
Work Order Date Contract Amount Estimated Completion Date
2022-06-08 $179,030 Spring of 2022


US 90: Chef Menteur Pass Mb Repair
H.015089.6 - Moveable bridges reconditioned
Proj. Engr: Robert, Joseph Route: US 90 map
Contractor: Energy Solutions Technology, L Miles: 0.22
Work Order Date Contract Amount Estimated Completion Date
2024-04-15 $219,650 Summer of 2024


US-90-Z: Ccc Decorative Lighting
H.015504.6-R1 - Roadway lighting
Proj. Engr: Hollier, Corbett Route: I-910 map
Contractor: Frischhertz Electric Co., Inc. Miles: 0.57
Work Order Date Contract Amount Estimated Completion Date
2024-02-16 $20,741,573 Spring of 2025


I-610 Bridge Rail Repair
H.015564.6 - Miscellaneous
Proj. Engr: Robert, Joseph Route: I-610 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2023-07-24 $66,900 Fall of 2023


I-10 Bridge Rail Repair
H.015565.6 - Miscellaneous
Proj. Engr: Robert, Joseph Route: I-10 map
Contractor: Miles: 1.20
Work Order Date Contract Amount Estimated Completion Date
2023-07-01 $139,708 Summer of 2023


Judge Seeber Bridge Repairs
046-31-0053 - Moveable bridges reconditioned
Proj. Engr: Zzzz Guidry, John Route: LA 39 map
Contractor: Boh Bros. Construction Co., LLC. Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2009-06-26 $8,936,932 Fall of 2010


Leveling Approach Slabs and Improvements
409-02-0018 - Asphalt overlay of asphalt pavement
Proj. Engr: Capote, Nelson Route: LA 406 map
Contractor: Barriere Construction Co., LLC Miles: 0.41
Work Order Date Contract Amount Estimated Completion Date
2011-08-11 $568,388 Fall of 2011


Pontchartrain Pump Station Repairs Due to Hurricane Katrina
450-90-0210 - Drainage
Proj. Engr: Zzzz Wetekamm, Fred Route: I-10
Contractor: Industrial & Mechanical Contr. Ll Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2008-08-04 $1,597,784 End of 2009


Drainage Improvements on I-10
450-90-0242 - Drainage
Proj. Engr: Zzzz Zeringue, Kirk Route: I-10 map
Contractor: Rcs Contractors, Inc. Miles: 5.00
Work Order Date Contract Amount Estimated Completion Date
2011-08-12 $267,345 Summer of 2011


Administration Building Expansion
610-01-0022 - Buildings and grounds excluding rest areas
Proj. Engr: Skoien, Richard W. Route:
Contractor: Jaroy Construction, Inc. Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2008-02-11 $3,799,661 End of 2009


Algiers Cut Off Canal Bridge Lighting Installation
836-08-0072 - Roadway lighting
Proj. Engr: Capote, Nelson Route: LA 407 map
Contractor: Jack B. Harper Contractor, Inc. Miles: 1.19
Work Order Date Contract Amount Estimated Completion Date
2008-02-01 $876,032 Fall of 2008


Plaquemines Parish

Note: The estimated completion date is based on the work order date and the contract
days allowed. Unavoidable contingencies and unforeseen events often develop during construction, which may impact the actual completion date.

Judge Perez Br. Wirerope Repl., Gearbox & Mach. House Repair
H.001390.6 - Moveable bridges reconditioned
Proj. Engr: Capote, Nelson Route: LA 23 map
Contractor: C.E.C., Inc. Miles: 0.01
Work Order Date Contract Amount Estimated Completion Date
2011-10-24 $968,252 Beginning of 2012


LA 23: Belle Chasse Bridge & Tunnel (Hbi)
H.004791.6 - Engineering
Proj. Engr: Heraty, Stephen P. Route: LA 23 map
Contractor: Plenary Infrastructure Belle C Miles: 0.81
Work Order Date Contract Amount Estimated Completion Date
2019-12-20 $181,222,216 Spring of 2026


LA 23: Diamond Rd - 665 Ft S Martin La
H.009223.6-R1 - Concrete pavement rehab-grinding/dowell retrofit/should drain install
Proj. Engr: Capote, Nelson Route: LA 23 map
Contractor: Barriere Construction Co., LLC Miles: 0.71
Work Order Date Contract Amount Estimated Completion Date
2012-10-25 $329,535 Beginning of 2013


LA 23: Tunnel - Russell Dr
H.012560.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Hollier, Corbett Route: LA 23 map
Contractor: Barriere Construction Co., LLC Miles: 4.30
Work Order Date Contract Amount Estimated Completion Date
2021-02-01 $5,229,262 Fall of 2022


LA 406: Lt. Turn Lane at Green Trails Dr
H.014487.6 - Asphalt widening and overlay
Proj. Engr: Hollier, Corbett Route: LA 406 map
Contractor: Buck Town Contractors & Co. Miles: 0.31
Work Order Date Contract Amount Estimated Completion Date
2021-10-11 $1,699,578 Beginning of 2022


LA 39: Braithwaite Drainage Repair
H.014569.6 - Drainage
Proj. Engr: Robert, Joseph Route: LA 39 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2021-03-16 $79,513 Spring of 2021


LA 23: Empire Drainage Repair
H.014570.6 - Drainage
Proj. Engr: Capote, Nelson Route: LA 23 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2021-02-09 $412,028 Spring of 2021


LA 23 Crossdrain 600' S Parish Rd 11
H.014911.6 - Drainage
Proj. Engr: Hollier, Corbett Route: LA 23 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2022-02-07 $458,912 Beginning of 2022


Emergency Dredging of Ostrica Canal
704-38-0011 - Miscellaneous
Proj. Engr: Capote, Nelson Route:
Contractor: Grillot Construction LLC Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2008-02-11 $1,058,050 Beginning of 2009


St. Bernard Parish

Note: The estimated completion date is based on the work order date and the contract
days allowed. Unavoidable contingencies and unforeseen events often develop during construction, which may impact the actual completion date.

Bayou La Loutre Bridge Rehabilitation
H.002562.6 - New location/replacement of bridge
Proj. Engr: Guilbeau, Justin Route: LA 46 map
Contractor: C.E.C., Inc. Miles: 0.04
Work Order Date Contract Amount Estimated Completion Date
2016-10-31 $6,046,006 Spring of 2019


LA 46: Orleans P/L - Paris Rd
H.010406.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Guilbeau, Justin Route: LA 46 map
Contractor: Barber Bros. Contracting Co., Miles: 2.90
Work Order Date Contract Amount Estimated Completion Date
2016-02-15 $3,870,157 Summer of 2017


LA 39: X-Drain Repair @ Debouchel Canal
H.012292.6 - Drainage
Proj. Engr: Guilbeau, Justin Route: LA 39 map
Contractor: Cheniere Construction, Inc. Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2016-02-16 $48,861 Spring of 2016


LA 39 and La 46 Crossdrain Replacements
H.012804.6-R1 - Drainage
Proj. Engr: Guilbeau, Justin Route: LA 46 LA 39 map
Contractor: Boh Bros. Construction Co., Ll Miles: 0.01
Work Order Date Contract Amount Estimated Completion Date
2017-03-06 $579,631 Summer of 2017


St. Bernard Parish 40 Arpent Trail, Ph 1
H.013525.6 - Sidewalks/bike paths
Proj. Engr: Oustalet, Randy Route: LA 47 map
Contractor: Baker Pile Driving and Site Wo Miles: 0.02
Work Order Date Contract Amount Estimated Completion Date
2022-10-03 $8,989,928 Fall of 2023


LA 47: La 46 - S End of Intracoastal Br
H.013560.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Robert, Joseph Route: LA 47 map
Contractor: Boh Bros. Construction Co., Ll Miles: 4.41
Work Order Date Contract Amount Estimated Completion Date
2020-02-21 $3,889,254 Spring of 2021


LA 39: Left Turn Lane at La 47
H.013758.6 - Traffic flow improvements - formerly turn lanes
Proj. Engr: Robert, Joseph Route: LA 39 LA 47 map
Contractor: Barber Bros. Contracting Co., Miles: 0.26
Work Order Date Contract Amount Estimated Completion Date
2022-09-04 $781,382 End of 2022


LA 46: Florissant Hwy Drainage Repair
H.014568.6 - Drainage
Proj. Engr: Roberts, Joseph Route: LA 46 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2021-04-08 $56,680 Spring of 2021


LA 39 @ Guerra Dr
H.014706.6 - Traffic flow improvements - formerly turn lanes
Proj. Engr: Robert, Joseph Route: LA 39 map
Contractor: Command Construction Industrie Miles: 0.16
Work Order Date Contract Amount Estimated Completion Date
2023-07-08 $494,334 Fall of 2023


LA 39: Orleans P/L - Norton Ave
H.014847.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Robert, Joseph Route: LA 39 map
Contractor: Barriere Construction Co., LLC Miles: 0.89
Work Order Date Contract Amount Estimated Completion Date
2023-08-18 $2,841,762 Spring of 2024


LA 46 Raising @ Florissant Levee
H.015003.6 - Miscellaneous
Proj. Engr: Robert, Joseph Route: LA 46 map
Contractor: Boh Bros. Construction Co., Ll Miles: 0.25
Work Order Date Contract Amount Estimated Completion Date
2023-11-13 $1,636,228 Spring of 2024


Yscloskey Bridge Rehabilitation- Hurricane Katrina
284-02-0035 - Moveable bridges reconditioned
Proj. Engr: Zzzz Wetekamm, Fred Route: map
Contractor: Coastal Bridge Co., L.L.C. Miles: 0.34
Work Order Date Contract Amount Estimated Completion Date
2007-01-22 $2,724,013 Spring of 2008


St. Charles Parish

Note: The estimated completion date is based on the work order date and the contract
days allowed. Unavoidable contingencies and unforeseen events often develop during construction, which may impact the actual completion date.

LA 48: Ormond Blvd - Wesco Rd
H.010413.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Keller, Gerald Route: LA 48 map
Contractor: Barriere Construction Co., LLC Miles: 2.94
Work Order Date Contract Amount Estimated Completion Date
2023-09-04 $1,741,881 Beginning of 2024


LA 306: La 631 - Barber Road
H.010417.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Zzzz Herrington, Benny Route: LA 306 map
Contractor: Boh Bros. Construction Co., Ll Miles: 0.39
Work Order Date Contract Amount Estimated Completion Date
2023-10-02 $1,022,767 Beginning of 2024


LA 18: Left Turn Lane @ La 3060
H.012600.6 - Traffic flow improvements - formerly turn lanes
Proj. Engr: Zzzz Herrington, Benny Route: LA 18 map
Contractor: Kcr Contractors, LLC Miles: 0.17
Work Order Date Contract Amount Estimated Completion Date
2019-08-19 $563,450 Fall of 2019


I-310: I-10 to US 90
H.012617.6 - Concrete pavement rehab-grinding/dowell retrofit/should drain install
Proj. Engr: Zzzz Herrington, Benny Route: I-310 map
Contractor: Boh Bros. Construction Co., Ll Miles: 11.71
Work Order Date Contract Amount Estimated Completion Date
2020-02-24 $12,412,333 Spring of 2022


LA 3127: Right Turn Lane at La 3141
H.012836.6 - Traffic flow improvements - formerly turn lanes
Proj. Engr: Zzzz Herrington, Benny Route: LA 3127 map
Contractor: Fleming Construction Co., LLC Miles: 0.14
Work Order Date Contract Amount Estimated Completion Date
2019-09-18 $169,800 Beginning of 2020


I-310: Concrete Patch at Sb Mm 9
H.013432.6 - Concrete new pavement
Proj. Engr: Zzzz Herrington, Benny Route: I-310 map
Contractor: Forby Contracting, Inc. Miles: 0.02
Work Order Date Contract Amount Estimated Completion Date
2019-01-23 $148,762 Spring of 2019


LA 52 (Ph 1): Blueberry Hill-Angus Dr.
H.013494.6 - Sidewalks/bike paths
Proj. Engr: Zzzz Herrington, Benny Route: LA 52 map
Contractor: Hard Rock Construction LLC Miles: 0.88
Work Order Date Contract Amount Estimated Completion Date
2023-07-13 $11,453,775 Spring of 2025


US 90: Des Allemands Br - La 52
H.014481.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Zzzz Herrington, Benny Route: US 90 map
Contractor: Barriere Construction Co., LLC Miles: 8.60
Work Order Date Contract Amount Estimated Completion Date
2022-09-19 $10,933,580 Summer of 2025


I-10 W Mm 220.6 Bridge Rail Repair
H.014607.6 - Miscellaneous
Proj. Engr: Skoien, Richard Route: I-10 map
Contractor: Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2021-05-03 $37,071 Spring of 2021


LA 631: Bayou Des Allemands Mb Repair
H.015093.6 - Moveable bridges reconditioned
Proj. Engr: Zzzz Herrington, Benny Route: LA 631 map
Contractor: C.E.C., Inc. Miles: 0.10
Work Order Date Contract Amount Estimated Completion Date
2024-02-19 $297,500 Summer of 2024


I-310 Bridge Rail Repair
H.015567.6 - Miscellaneous
Proj. Engr: Keller, Gerald Route: I-310 map
Contractor: Miles: 3.16
Work Order Date Contract Amount Estimated Completion Date
2023-07-05 $138,745 Summer of 2023


I-310 N.B., S.B. & Ramp Bearing Pad & Joint Seal Replacement
450-36-0035 - Bridges reconditioned
Proj. Engr: Zzzz Weber, Alan Route:
Contractor: Gibson & Associates Inc. Miles: 0.00
Work Order Date Contract Amount Estimated Completion Date
2011-07-17 $1,356,720 Spring of 2012


Terrebonne Parish

Note: The estimated completion date is based on the work order date and the contract
days allowed. Unavoidable contingencies and unforeseen events often develop during construction, which may impact the actual completion date.

LA 24 & La 316: Company Canal Bridge
H.001498.6 - New location/replacement of bridge
Proj. Engr: Wetekamm, Fred Route: LA 24 LA 316 map
Contractor: James Construction Group LLC Miles: 0.26
Work Order Date Contract Amount Estimated Completion Date
2020-11-04 $28,239,923 Spring of 2025


LA 56: Robinson Canal Bridge
H.002238.6-R1 - New location/replacement of bridge
Proj. Engr: Burgess, Matthew Route: LA 56 map
Contractor: Sealevel Construction Inc. Miles: 0.17
Work Order Date Contract Amount Estimated Completion Date
2023-07-24 $7,198,735 Fall of 2024


Bayou Terrebonne Eastside Sidewalk Project
H.007604.6 - Sidewalks/bike paths
Proj. Engr: Caillouet, Melanie Route: LA 24 map
Contractor: Hard Rock Construction LLC Miles: 0.38
Work Order Date Contract Amount Estimated Completion Date
2012-03-29 $192,087 Summer of 2012


Houma Twin Span Br Exp. Joint Rpr
H.013317.6 - Bridges reconditioned
Proj. Engr: Rogers, Chris Route: LA 24 map
Contractor: Miles: 0.01
Work Order Date Contract Amount Estimated Completion Date
2018-11-21 $58,928 Beginning of 2019


LA 661: La 315 - La 659
H.014085.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Burgess, Matthew Route: LA 661 map
Contractor: Huey P. Stockstill, LLC Miles: 2.61
Work Order Date Contract Amount Estimated Completion Date
2023-05-01 $5,236,294 Summer of 2024


US 90 @ Gibson Approach Slab
H.014604.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Rogers, Chris Route: US 90 map
Contractor: Miles: 0.06
Work Order Date Contract Amount Estimated Completion Date
2021-07-01 $319,283 Summer of 2021


US 90: 0.9 Mi. W La 311 - Mcmahon Canal
H.014849.6 - Asphalt overlay of asphalt pavement
Proj. Engr: Burgess, Matthew Route: US 90 map
Contractor: Barriere Construction Co., LLC Miles: 11.97
Work Order Date Contract Amount Estimated Completion Date
2024-01-03 $18,863,688 Beginning of 2026


La315 & 55:falgout & Humble Mb Rprs(Hbi)
H.014997.6 - Moveable bridges reconditioned
Proj. Engr: Burgess, Matthew Route: LA 315 LA 55 map
Contractor: Reliant Industrial Solutions L Miles: 0.21
Work Order Date Contract Amount Estimated Completion Date
2024-01-29 $228,385 Fall of 2024


La56&57:boudreaux C. & Byu Dulac Mb Rprs
H.014999.6 - Moveable bridges reconditioned
Proj. Engr: Burgess, Matthew Route: LA 57 LA 56 map
Contractor: Coastal Contractors, LLC Miles: 0.11
Work Order Date Contract Amount Estimated Completion Date
2023-10-30 $1,377,483 Fall of 2024


LA 58 Mb Rprs (Sarah & Montegut)(Hbi)
H.015030.6 - Moveable bridges reconditioned
Proj. Engr: Burgess, Matthew Route: LA 58 map
Contractor: Reliant Industrial Solutions L Miles: 0.05
Work Order Date Contract Amount Estimated Completion Date
2023-09-19 $419,800 Summer of 2024


LA 315 & La 661 Mb Rprs(Hbi)
H.015031.6 - Moveable bridges reconditioned
Proj. Engr: Burgess, Matthew Route: LA 315 LA 661 map
Contractor: Reliant Industrial Solutions L Miles: 0.54
Work Order Date Contract Amount Estimated Completion Date
2024-01-29 $641,900 Fall of 2024


LA 24, La 661, & La 3087 Mb Repairs
H.015033.6 - Moveable bridges reconditioned
Proj. Engr: Burgess, Matthew Route: LA 661 LA 24 map
Contractor: C.E.C., Inc. Miles: 0.10
Work Order Date Contract Amount Estimated Completion Date
2024-01-03 $398,300 Fall of 2024


District 02

No districtwide projects.