Districtwide Projects
Acadia Parish
Note: The estimated completion date is based
on the work order date and the contract
days allowed.
Unavoidable contingencies and unforeseen events
often develop during construction, which may
impact the actual completion date.
I-10: Jeff Dav Pl - I-49 (Ogfc/Slab Repair) |
H.012174.6 - Asphalt overlay of asphalt pavement
|
Proj. Engr: Ronkartz, Michael |
Route: |
I-10
map
|
Contractor: Gilchrist Construction Company |
Miles:
| 37.21 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2023-09-13 |
$80,212,405 |
Summer of 2025 |
LA 100: La 97 - La 91 |
H.012919.6 - Asph concrete ovly over in place stabilized/cement treated base course
|
Proj. Engr: Ronkartz, Michael |
Route: |
LA 100
map
|
Contractor: Prairie Contractors LLC |
Miles:
| 5.32 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2025-02-12 |
$7,377,822 |
Spring of 2026 |
LA 365: La 370 - La 13 |
H.014859.6 - Asphalt overlay of asphalt pavement
|
Proj. Engr: Ronkartz, Michael |
Route: |
LA 365
map
|
Contractor: Glenn Lege Construction LLC |
Miles:
| 2.00 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2024-06-27 |
$3,212,903 |
Beginning of 2025 |
Evangeline Parish
Note: The estimated completion date is based
on the work order date and the contract
days allowed.
Unavoidable contingencies and unforeseen events
often develop during construction, which may
impact the actual completion date.
LA 376: Bayou Bridges |
H.013976.6 - New location/replacement of bridge
|
Proj. Engr: Miller, Sam |
Route: |
LA 376
map
|
Contractor: Guinn Construction, LLC |
Miles:
| 0.35 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2024-01-19 |
$3,342,585 |
Beginning of 2025 |
LA 106: US 167 - Avoyelles P/L |
H.015619.6 - Asph concrete ovly over in place stabilized/cement treated base course
|
Proj. Engr: Miller, Sam |
Route: |
LA 106
map
|
Contractor: Gilchrist Construction Company |
Miles:
| 8.26 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2025-01-27 |
$12,769,937 |
Beginning of 2026 |
LA 3277: La 757 - La 104 |
H.015621.6 - Asph concrete ovly over in place stabilized/cement treated base course
|
Proj. Engr: Miller, Sam |
Route: |
LA 3277
map
|
Contractor: Diamond B Construction Co., L. |
Miles:
| 4.91 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2024-12-04 |
$5,353,794 |
Fall of 2025 |
Iberia Parish
Note: The estimated completion date is based
on the work order date and the contract
days allowed.
Unavoidable contingencies and unforeseen events
often develop during construction, which may
impact the actual completion date.
LA 675 & La 87 Imp. In New Iberia (Rt) |
H.011781.6 - Asphalt overlay of asphalt pavement
|
Proj. Engr: Miller, Daniel |
Route: |
LA 675 LA 87
map
|
Contractor: Merrick, LLC |
Miles:
| 2.30 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2024-04-05 |
$11,615,357 |
Spring of 2026 |
US 90: La 14 - La 83 |
H.013265.6 - Concrete pavement rehab-grinding/dowell retrofit/should drain install
|
Proj. Engr: Miller, Daniel |
Route: |
US 90
map
|
Contractor: Siema Construction, LLC |
Miles:
| 2.86 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2022-10-04 |
$36,855,222 |
Beginning of 2025 |
US 90 (Eb): La 83 - La 85 |
H.014833.6 - Asphalt overlay of asphalt pavement
|
Proj. Engr: Miller, Daniel |
Route: |
US 90
map
|
Contractor: Prairie Contractors LLC |
Miles:
| 5.35 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2024-11-24 |
$3,808,808 |
Summer of 2025 |
LA 87: La 3182 - 0.65 Mi Se of La 3182 |
H.015026.6 - Asphalt overlay of asphalt pavement
|
Proj. Engr: Miller, Daniel |
Route: |
LA 87
map
|
Contractor: Brudd Construction Co., LLC |
Miles:
| 0.65 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2025-01-24 |
$951,269 |
Spring of 2025 |
LA 31: La 182 - 0.899 Mi S La 92 |
H.015617.6 - Asphalt overlay of asphalt pavement
|
Proj. Engr: Miller, Daniel |
Route: |
LA 31
map
|
Contractor: Glenn Lege Construction LLC |
Miles:
| 5.83 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2025-02-14 |
$8,403,696 |
Fall of 2026 |
Lafayette Parish
Note: The estimated completion date is based
on the work order date and the contract
days allowed.
Unavoidable contingencies and unforeseen events
often develop during construction, which may
impact the actual completion date.
I-49 S: Amb Caffery/Us 90 Interchange |
H.002868.6 - Asphalt new pavement-new roadway/new alignments
|
Proj. Engr: Woods, Jordan |
Route: |
US 90 LA 3073
map
|
Contractor: Jb James Construction LLC |
Miles:
| 3.09 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2022-08-15 |
$141,752,939 |
Beginning of 2026 |
US 90: RR Jct - Pinhook, La 92 - La 88 |
H.009629.6 - Concrete pavement rehab-grinding/dowell retrofit/should drain install
|
Proj. Engr: Woods, Jordan |
Route: |
US 90
map
|
Contractor: Progressive Construction Co., |
Miles:
| 4.63 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2023-08-07 |
$27,065,661 |
Beginning of 2026 |
Univ Av Ph1:100 S Rr-500 S 1-10 Eb Rmp |
H.013025.6 - Planning study
|
Proj. Engr: Guidry, Blake |
Route: |
|
Contractor: Progressive Construction Co., |
Miles:
| 1.04 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2023-05-15 |
$12,636,370 |
Beginning of 2026 |
LA 93: Coulee Ile Des Cannes Bridge |
H.013537.6 - New location/replacement of bridge
|
Proj. Engr: Woods, Jordan |
Route: |
LA 93-1
map
|
Contractor: Siema Construction, LLC |
Miles:
| 0.06 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2025-04-14 |
$1,635,905 |
Fall of 2025 |
St. Landry Parish
Note: The estimated completion date is based
on the work order date and the contract
days allowed.
Unavoidable contingencies and unforeseen events
often develop during construction, which may
impact the actual completion date.
US-190 ITS Deployment |
H.011511.6 - ITS and emergency operations
|
Proj. Engr: Moore, Tony |
Route: |
US 190
map
|
Contractor: Grady Crawford Const. Co., Inc |
Miles:
| 42.97 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2019-02-04 |
$2,867,646 |
Spring of 2020 |
LA 10: Palmetto Company Canal Br |
H.011808.6 - New location/replacement of bridge
|
Proj. Engr: Descant, Charles |
Route: |
LA 10
map
|
Contractor: Tl Hawk, LLC |
Miles:
| 0.34 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2024-01-31 |
$4,993,947 |
Spring of 2025 |
LA 10: Palmetto Company Canal Br |
H.011808.6A - New location/replacement of bridge
|
Proj. Engr: Descant, Charles |
Route: |
LA 10
map
|
Contractor: Tl Hawk, LLC |
Miles:
| 0.34 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2024-04-19 |
$8,182,415 |
Summer of 2025 |
U.S. 190: Market - Court, Sidewalks |
H.011844.6-R1 - Sidewalks/bike paths
|
Proj. Engr: Jarrell III, William |
Route: |
US 190
map
|
Contractor: Briggs Brothers Enterprises Co |
Miles:
| 0.08 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2023-06-05 |
$546,740 |
Fall of 2023 |
US 190 Eb & Wb: Wallior St - La 742 |
H.013198.6 - Asphalt overlay of asphalt pavement
|
Proj. Engr: Descant, Charles |
Route: |
US 190
map
|
Contractor: Prairie Contractors LLC |
Miles:
| 6.22 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2020-12-22 |
$11,240,447 |
Spring of 2023 |
LA 182: Lafayette P/L - La 754 |
H.014537.6 - Asphalt overlay of asphalt pavement
|
Proj. Engr: Descant, Charles |
Route: |
LA 182
map
|
Contractor: Prairie Contractors LLC |
Miles:
| 5.53 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2024-02-19 |
$8,273,448 |
Fall of 2025 |
I-49: La 31 Intchg Lighting (Opelousas) |
H.014552.6 - Roadway lighting
|
Proj. Engr: Descant, Charles |
Route: |
I-49
map
|
Contractor: Ozark Traffic Management, LLC |
Miles:
| 1.00 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2024-12-06 |
$1,396,101 |
Beginning of 2026 |
I-49: US 190 Intchg Lighting (Opelousas) |
H.014556.6 - Roadway lighting
|
Proj. Engr: Descant, Charles |
Route: |
I-49
map
|
Contractor: Ernest P. Breaux Electrical, L |
Miles:
| 0.95 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2025-03-13 |
$2,544,908 |
Beginning of 2027 |
LA 10: Little Wauksha Br - US 71 |
H.014766.6 - Asph concrete ovly over in place stabilized/cement treated base course
|
Proj. Engr: Descant, Charles |
Route: |
LA 10
map
|
Contractor: Prairie Contractors LLC |
Miles:
| 4.71 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2024-11-25 |
$5,034,157 |
Beginning of 2026 |
LA 31/La 182: La 742 - 0.355mi. N. La 31 |
H.015357.6 - Asphalt overlay of asphalt pavement
|
Proj. Engr: Descant, Charles |
Route: |
LA 182
map
|
Contractor: Glenn Lege Construction LLC |
Miles:
| 2.59 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2024-12-16 |
$3,352,455 |
Beginning of 2026 |
LA 758: US 190 - La 29 |
H.015620.6 - Asph concrete ovly over in place stabilized/cement treated base course
|
Proj. Engr: Descant, Charles |
Route: |
LA 758
map
|
Contractor: Prairie Contractors LLC |
Miles:
| 3.11 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2025-02-12 |
$4,639,655 |
Summer of 2025 |
I-49: St. Landry to US 190 Pavement Markings |
H.015630.6 - Striping and pavement markers
|
Proj. Engr: Descant, Charles |
Route: |
I-49
map
|
Contractor: Stripe-a-Zone, LLC |
Miles:
| 11.36 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2025-03-10 |
$493,516 |
Spring of 2025 |
LA 359: Local Road (Bolden)-La 10 |
H.015774.6 - Asph concrete ovly over in place stabilized/cement treated base course
|
Proj. Engr: Descant, Charles |
Route: |
LA 359
map
|
Contractor: Diamond B Construction Co., L. |
Miles:
| 4.36 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2025-03-17 |
$4,622,532 |
Fall of 2025 |
St. Martin Parish
Note: The estimated completion date is based
on the work order date and the contract
days allowed.
Unavoidable contingencies and unforeseen events
often develop during construction, which may
impact the actual completion date.
I-10: La 328 to La 347 |
H.010601.6 - Asphaltic concrete overlay of rubblized pavement
|
Proj. Engr: Dore, Haley |
Route: |
I-10
map
|
Contractor: Gilchrist Construction Company |
Miles:
| 5.37 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2019-10-07 |
$89,605,951 |
Fall of 2024 |
LA 321: Creek Bridges |
H.013966.6 - New location/replacement of bridge
|
Proj. Engr: Dore, Haley |
Route: |
LA 321
map
|
Contractor: Brown Industrial Construction, |
Miles:
| 0.20 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2023-10-12 |
$4,176,223 |
Beginning of 2025 |
LA 352 Drainage Improvement |
H.014415.6 - Drainage
|
Proj. Engr: Dore, Haley |
Route: |
LA 352 I-10
map
|
Contractor: Merrick, LLC |
Miles:
| 1.31 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2023-07-25 |
$6,394,445 |
Beginning of 2025 |
LA 347: La 350 - La 351 |
H.014492.6 - Asph concrete ovly over in place stabilized/cement treated base course
|
Proj. Engr: Dore, Haley |
Route: |
LA 347 LA 321
map
|
Contractor: Glenn Lege Construction LLC |
Miles:
| 4.27 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2023-09-14 |
$12,431,257 |
Beginning of 2026 |
LA 94: Vermilion River Bridge Repl. |
H.014560.6 - New location/replacement of bridge
|
Proj. Engr: Woods, Jordan |
Route: |
LA 94
map
|
Contractor: Merrick, LLC |
Miles:
| 0.28 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2024-08-05 |
$6,908,173 |
Spring of 2026 |
LA 92-1: US 90 - La 182 |
H.014793.6 - Asph concrete ovly over in place stabilized/cement treated base course
|
Proj. Engr: Dore, Haley |
Route: |
LA 92-1
map
|
Contractor: Glenn Lege Construction LLC |
Miles:
| 3.07 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2025-01-17 |
$4,782,070 |
Fall of 2025 |
LA 328: I-10 - La 347 |
H.014805.6 - Asph concrete ovly over in place stabilized/cement treated base course
|
Proj. Engr: Dore, Haley |
Route: |
LA 328
map
|
Contractor: Prairie Contractors LLC |
Miles:
| 5.62 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2024-03-11 |
$12,168,018 |
Summer of 2025 |
LA 347: La 351 - La 328 |
H.014826.6 - Asph concrete ovly over in place stabilized/cement treated base course
|
Proj. Engr: Dore, Haley |
Route: |
LA 347
map
|
Contractor: Glenn Lege Construction LLC |
Miles:
| 2.98 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2025-04-10 |
$10,060,608 |
Summer of 2026 |
St. Mary Parish
Note: The estimated completion date is based
on the work order date and the contract
days allowed.
Unavoidable contingencies and unforeseen events
often develop during construction, which may
impact the actual completion date.
Bayou Teche Bridge (Oaklawn) |
H.002798.6 - New location/replacement of bridge
|
Proj. Engr: Ray, Nicholaus |
Route: |
LA 323
map
|
Contractor: Shavers-Whittle Construction L |
Miles:
| 0.06 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2016-10-17 |
$12,239,950 |
Fall of 2020 |
LA 182: Berwick Bay Bridge Rehab (Hbi) |
H.011487.6-R1 - Bridges reconditioned
|
Proj. Engr: Ray, Nicholaus |
Route: |
LA 182
map
|
Contractor: Southern Road & Bridge, LLC |
Miles:
| 0.71 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2022-10-22 |
$33,000,302 |
Beginning of 2028 |
US 90: La 318 - La 83 |
H.013203.6 - Asphalt overlay of asphalt pavement
|
Proj. Engr: Ray, Nicholaus |
Route: |
US 90
map
|
Contractor: Siema Construction, LLC |
Miles:
| 6.02 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2023-10-12 |
$51,825,459 |
Summer of 2025 |
US 90-W: US 90 Over Bayou Ramos Repairs |
H.015114.6 - Bridges reconditioned
|
Proj. Engr: Ray, Nicholaus |
Route: |
US 90-W
map
|
Contractor: Reliant Industrial Solutions L |
Miles:
| 0.14 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2024-10-31 |
$1,709,878 |
Summer of 2025 |
LA 3211: RR Crossing - La 182 |
H.015592.6 - Asph concrete ovly over in place stabilized/cement treated base course
|
Proj. Engr: Ray, Nicholaus |
Route: |
LA 3211
map
|
Contractor: Prairie Contractors LLC |
Miles:
| 0.94 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2025-02-07 |
$1,794,500 |
Summer of 2025 |
Vermilion Parish
Note: The estimated completion date is based
on the work order date and the contract
days allowed.
Unavoidable contingencies and unforeseen events
often develop during construction, which may
impact the actual completion date.
LA 685: La 14-Business - Bayou Tigre |
H.015056.6 - Asphalt overlay of concrete pavement
|
Proj. Engr: Moran, Michael |
Route: |
LA 685
map
|
Contractor: Glenn Lege Construction LLC |
Miles:
| 0.77 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2024-10-20 |
$1,848,481 |
Summer of 2025 |
LA 14-Business & La 331: Erath |
H.015058.6 - Asph concrete ovly over in place stabilized/cement treated base course
|
Proj. Engr: Moran, Michael |
Route: |
LA 14-Y LA 331
map
|
Contractor: Glenn Lege Construction LLC |
Miles:
| 2.48 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2024-07-27 |
$3,240,386 |
Summer of 2025 |
LA 335: La 35 - E. Jct. La 694 |
H.015950.6 - Asph concrete ovly over in place stabilized/cement treated base course
|
Proj. Engr: Moran, Michael |
Route: |
LA 335 LA 694
map
|
Contractor: Glenn Lege Construction LLC |
Miles:
| 6.51 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2025-03-12 |
$7,952,106 |
Summer of 2026 |
LA 35 & La 342: Road Improvements |
H.016000.6 - Asph concrete ovly over in place stabilized/cement treated base course
|
Proj. Engr: Moran, Michael |
Route: |
LA 35
map
|
Contractor: Glenn Lege Construction LLC |
Miles:
| 3.93 |
Work Order Date |
Contract Amount |
Estimated Completion Date |
2025-03-11 |
$5,432,591 |
Beginning of 2026 |
District 03
No districtwide projects.